Flatwork & trails today MO · modot lpa
Central District, New Bloomfield R-III Sidewalk Improvements Project
MoDOT local public agency (LPA) projects
Due
Thu Nov 5, 2026
Agency estimate
not stated
Bid bond
5%
Prequal / license
mentioned
Pre-bid
October 20, 2026 2:00 PM · optional
Estimator brief
Auto-extracted from the public notice · verifyQuoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
- Scope
- The construction of ADA compliant sidewalk along Willow Drive and installation of RRFB at Route J school crossing to improve safety and connectivity for pedestrian traffic near the New Bloomfield Elementary and High Schools.
- Key quantities
- not stated
- Length
- not stated
- Bid bond / security
- A certified or cashier’s check or bid bond in the amount of 5% of the bid amount shall be submitted with each proposal.
- Performance & payment bonds
- not stated
- Prequalification / licensing
- This requirement includes that the contractor has submitted to MoDOT a Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening…
- Insurance
- not stated
- Pre-bid meeting
- A Pre-Bid Meeting is scheduled at 2:00 PM on October 20, 2026 in the boardroom at New Bloomfield R-III School District, 307 Redwood Dr, New Bloomfield, MO.October 20, 2026 2:00 PM · optional
- Bids due
- Thu Nov 5, 2026, 2:00 PM
- Plans & documents
- Copies of the contract documents including drawings and specifications may be viewed & ordered online at https://www.adsplanroom.net/ or by contacting American Document Solutions, 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, phone (573)…
- DBE / EBE goal
- 0%
Brief generated 2026-11-05 · completeness 6/6
Get bids like this by email
Free during early access: one email a day with new Missouri bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.
Get free daily alertsRelated open bids
- todayCentral District, New Bloomfield, construction of ADA compliant sidewalk along Willow DrivMoDOT local public agency (LPA) projects · due Thu Nov 5, 2026
- todayCentral District, City of Linn Creek, sidewalk improvements to West Valley DriveMoDOT local public agency (LPA) projects · due Thu Nov 5, 2026
- 5dSE District, St. Francois County, Silver Springs Road Bridge ReplacementMoDOT local public agency (LPA) projects · due Tue Nov 10, 2026
- 5dSE District, St, Francois County, King School Road ReplacementMoDOT local public agency (LPA) projects · due Tue Nov 10, 2026
- 5dSTL District, City of St. Louis, Removal and Replacement of Southwest and Columbia BridgesMoDOT local public agency (LPA) projects · due Tue Nov 10, 2026
- 5dSL District, City of St. Louis, Removal & Replacement of Southwets & Columbia BridgesMoDOT local public agency (LPA) projects · due Tue Nov 10, 2026
- 6dNW District, City of Maryville, South Main Trail Connection ProjectMoDOT local public agency (LPA) projects · due Wed Nov 11, 2026
- 6dNW District, City of Maryville, South Mani Trail Connection ProjectMoDOT local public agency (LPA) projects · due Wed Nov 11, 2026
Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.