Bridges & drainage 9d MO · modot lpa
SE District, St. Francois County, Silver Springs Road Bridge Replacement
MoDOT local public agency (LPA) projects
Due
Tue Nov 10, 2026
Bid bond
5%
Prequal / license
mentioned
Pre-bid
not stated
Estimator brief
Auto-extracted from the public notice · verifyQuoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
- Scope
- Replacement of a deficient bridge with a new single span concrete box beam bridge.
- Key quantities
- not stated
- Length
- not stated
- Bid bond / security
- A certified cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
- Performance & payment bonds
- not stated
- Prequalification / licensing
- All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2026 Edition including all revisions.
- Insurance
- not stated
- Pre-bid meeting
- not stated
- Bids due
- Tue Nov 10, 2026, 10:00 o’clock A.M.
- Plans & documents
- A digital copy of the plans and specifications may be purchased through the office of Great River Engineering (GRE), at 417-886-7171 upon payment of $75.00, which is not refundable.
- DBE / EBE goal
- 0%
- Wage rates
- Prevailing / Davis-Bacon wages mentioned
Brief generated 2026-11-01 · completeness 5/6
Get bids like this by email
Free during early access: one email a day with new Missouri bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.
Get free daily alertsRelated open bids
- 1dSTL District, City of Frontenac, Removals, clearing and grubbing, grading, excavation, briMoDOT local public agency (LPA) projects · due Mon Nov 2, 2026
- 2dKC District, City of Kearney, Mack Porter Park Connector Shared Use PathMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 2dSE District, City of Poplar Bluff, PB Pine Street Crossing projectMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 2dKC District, City of Smithville, construction of a single lane roundabout at the intersectMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 2dKC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72ndMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 3dSt. Louis District, St. Louis County, Hanley Road – Laclede Station Road between ManchesteMoDOT local public agency (LPA) projects · due Wed Nov 4, 2026
- 4dCentral District, New Bloomfield, construction of ADA compliant sidewalk along Willow DrivMoDOT local public agency (LPA) projects · due Thu Nov 5, 2026
- 4dCentral District, City of Linn Creek, sidewalk improvements to West Valley DriveMoDOT local public agency (LPA) projects · due Thu Nov 5, 2026
Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.