Paving 19d MO · modot lpa
STL District, City of St. Peters, Barkwood Trails Drive Reconstruction
MoDOT local public agency (LPA) projects
Due
Fri Nov 20, 2026
Bid bond
5%
Prequal / license
mentioned
Pre-bid
not stated
Estimator brief
Auto-extracted from the public notice · verifyQuoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
- Scope
- All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.
- Key quantities
- not stated
- Length
- not stated
- Bid bond / security
- A bid bond in the amount of 5% (five percent) shall be submitted with each proposal.
- Performance & payment bonds
- not stated
- Prequalification / licensing
- All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2026 Edition including all revisions.
- Insurance
- not stated
- Pre-bid meeting
- not stated
- Bids due
- Fri Nov 20, 2026, 2:00 PM
- Plans & documents
- Contract Documents will be available on October 29, 2026 and may be obtained from the City of St.
- DBE / EBE goal
- 0%
- Wage rates
- Prevailing / Davis-Bacon wages mentioned
Brief generated 2026-11-01 · completeness 5/6
Get bids like this by email
Free during early access: one email a day with new Missouri bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.
Get free daily alertsRelated open bids
- 1dSTL District, City of Frontenac, Removals, clearing and grubbing, grading, excavation, briMoDOT local public agency (LPA) projects · due Mon Nov 2, 2026
- 2dKC District, City of Kearney, Mack Porter Park Connector Shared Use PathMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 2dSE District, City of Poplar Bluff, PB Pine Street Crossing projectMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 2dKC District, City of Smithville, construction of a single lane roundabout at the intersectMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 2dKC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72ndMoDOT local public agency (LPA) projects · due Tue Nov 3, 2026
- 3dSt. Louis District, St. Louis County, Hanley Road – Laclede Station Road between ManchesteMoDOT local public agency (LPA) projects · due Wed Nov 4, 2026
- 4dCentral District, New Bloomfield, construction of ADA compliant sidewalk along Willow DrivMoDOT local public agency (LPA) projects · due Thu Nov 5, 2026
- 4dCentral District, City of Linn Creek, sidewalk improvements to West Valley DriveMoDOT local public agency (LPA) projects · due Thu Nov 5, 2026
Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.