| 5d Fri Nov 6, 2026 | 003-62V13: (2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glen Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 005-62V42: (1.41-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 006-62V47: (4.43-Mile) Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. This project is in t Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 008-62W72: (4,251.83-Ft) The Work consists of culvert replacement, HMA pavement and shoulder reconstruction, HMA resurfacing, storm sewer installation, culvert and wingwall installation. This project is in the Village of Winnetka, Cook Coun Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 009-80C12: (386-Ft) Bridge Repair project and the work includes bridge deck patching, steel repairs, and miscellaneous bridge repair. Location in the Villages Skokie and Lincolnwood within Cook County. Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 012-80C66: Bridge Deck overlay, bridge joint replacement and /repair include deck and approach patching, and substructure repair of (SN 016-0707) located on Canfield Avenue (FAU 2761), over John F. Kennedy Expressway (FAI-90), Chicago, IL. Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 013-80C67: (357-Ft) Bridge Deck Overlay (SN 016-0398) and CTA will undergo routine maintenance consists of reconstruction of the expansion joints with strip seals hydro scarification (3/4-), deck and approach slab repairs, installation of a Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 014-80C69: (250-Ft) Bridge Repairs include hydro scarification, deck slab repair, polymer concrete nosing, approach slab repair, pier concrete repair, abutment concrete sealer, asphalt butt joints, relief joint cleaning sealing, curb and gu Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 016-80C75: (124-Ft) Project consists of a staged construction to complete deck overlay and joint replacement and repair of the existing bridge, the removal and replacement of curb and gutter, and pavement marking. The project is on IL 83 (E Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 018-80D34: (1.46-Mile) SMART overlay project in which the work to be performed under this contract consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pavement patching, plac Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 019-80D75: (3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement Batch Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 023-61F87: Sidewalk replacement along various routes in the city of Oak Forest. Additional work includes curb and gutter, ADA ramps, driveway replacement and other required work. Illinois DOT | Cook | Flatwork & trails | |
| 5d Fri Nov 6, 2026 | 029-61M65: Resurface Glenview Rd. from Washington St. to Metra Railroad and resurfacing Lehigh Ave./Harlem Ave. from Lake Ave. to Dewes St. in the village of Glenview. Additional work includes sidewalk replacement, curb and gutter replaceme Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 030-61M69: HMA resurfacing and traffic signal improvement of 103rd St. from Southwest Highway to Ridgeland Ave. in the village of Chicago Ridge. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Cook | Safety & signals | |
| 5d Fri Nov 6, 2026 | 033-61M74: HMA resurfacing of Brainard Ave. from Harding Ave. to 31st St. in the village of LaGrange Park. Additional work includes drainage improvements, sidewalks, ADA ramps, pavement patching and other required work. Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 035-61M81: HMA resurfacing of 5th Ave. from Roosevelt Rd. to Bataan Dr. in the village of Maywood. Additional work includes curb and gutter, sidewalk, ADA ramps and other required work. Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 036-61M82: Resurface Prairie Ave. from Brookfield Ave. to 31st St. in the village of Brookfield. Additional work consists of sidewalk replacement, curb and gutter replacement, water main improvements, combined sewer replacement, pavement ma Illinois DOT | Cook | Water & sewer | |
| 5d Fri Nov 6, 2026 | 037-61M86: Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell Rd. to the eastern ter Illinois DOT | Cook | Safety & signals | |