| 31d Thu Dec 3, 2026 (est.) | Slides Correction: Skyline Drive Slide, SR 2042 [$2,500,000 to $5,000,000] (ECMS 118570, MPMS 118570) [planned letting] PennDOT · est. $2.5M–$5M | Allegheny | Other | |
| 31d Thu Dec 3, 2026 (est.) | Bridge Replacement: Richard Road over Wexford Run, SR 4053 [$1,000,000 to $2,500,000] (ECMS 100723, MPMS 100723) [planned letting] PennDOT · est. $1M–$2.5M | Allegheny | Bridges & drainage | |
| 38d Thu Dec 10, 2026 (est.) | Resurface: GRP 111-27-7135-2, SR 19 [$5,000,000 to $7,500,000] (ECMS 108642, MPMS 108642) [planned letting] PennDOT · est. $5M–$7.5M | Allegheny | Paving | |
| 38d Thu Dec 10, 2026 (est.) | Resurface: GRP 111-27-7135-1 Asphalt Overlay Concrete, SR 51 [$5,000,000 to $7,500,000] (ECMS 108640, MPMS 108640) [planned letting] PennDOT · est. $5M–$7.5M | Allegheny | Paving | |
| 38d Thu Dec 10, 2026 (est.) | Slides Correction: SR 3081 (Montour Street Extension) Slide Asphalt Overlay, SR 3081 [$2,500,000 to $5,000,000] (ECMS 121556, MPMS 121556) [planned letting] PennDOT · est. $2.5M–$5M | Allegheny | Paving | |
| 38d Thu Dec 10, 2026 (est.) | Bridge Preservation: AL Local BPRS Group 5 Activities, SR 7420 (municipal) [$12,500,000 to $15,000,000] (ECMS 28426, MPMS 28426) [planned letting] PennDOT · est. $12.5M–$15M | Allegheny | Bridges & drainage | |