| today Fri Nov 6, 2026 | 002-62J16: This is a channelization and culvert replacement project consists of HMA binder course widening, pavement patching, milling of existing HMA surface, placing HMA surface course, box culvert installation, thermoplastic pavement mar Illinois DOT | Kane | Bridges & drainage | |
| today Fri Nov 6, 2026 | 008-62W72: (4,251.83-Ft) The Work consists of culvert replacement, HMA pavement and shoulder reconstruction, HMA resurfacing, storm sewer installation, culvert and wingwall installation. This project is in the Village of Winnetka, Cook Coun Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 009-80C12: (386-Ft) Bridge Repair project and the work includes bridge deck patching, steel repairs, and miscellaneous bridge repair. Location in the Villages Skokie and Lincolnwood within Cook County. Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 010-80C58: This project includes HMA surface removal and replacement on the bridge approach, and all incidental and collateral work necessary to complete the project. This project is located at the west approach of (SN 099-0289) and (SN 099 Illinois DOT | Will | Bridges & drainage | |
| today Fri Nov 6, 2026 | 012-80C66: Bridge Deck overlay, bridge joint replacement and /repair include deck and approach patching, and substructure repair of (SN 016-0707) located on Canfield Avenue (FAU 2761), over John F. Kennedy Expressway (FAI-90), Chicago, IL. Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 013-80C67: (357-Ft) Bridge Deck Overlay (SN 016-0398) and CTA will undergo routine maintenance consists of reconstruction of the expansion joints with strip seals hydro scarification (3/4-), deck and approach slab repairs, installation of a Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 014-80C69: (250-Ft) Bridge Repairs include hydro scarification, deck slab repair, polymer concrete nosing, approach slab repair, pier concrete repair, abutment concrete sealer, asphalt butt joints, relief joint cleaning sealing, curb and gu Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 015-80C73: Bridge Deck Overlay and Bridge Deck repairs and replacement (SN 099-4622 and SN 099-0338), consist of deck patching, bridge deck joint replacements, hydro- scarification and overlay bridge deck overlay. Location on US 30 / IL 59 Illinois DOT | Will | Bridges & drainage | |
| today Fri Nov 6, 2026 | 016-80C75: (124-Ft) Project consists of a staged construction to complete deck overlay and joint replacement and repair of the existing bridge, the removal and replacement of curb and gutter, and pavement marking. The project is on IL 83 (E Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 025-61M06: Construction of a single span PPC deck beam bridge carrying Farrell Rd. over Spring Creek in the city of Joliet. Additional work includes full-depth HMA pavement reconstruction, pipe culverts, guardrail and other required work. Illinois DOT | Will | Bridges & drainage | |
| today Fri Nov 6, 2026 | 027-61M54: Construction of a pedestrian bridge over IL 19/Irving Park Rd., retaining walls and the construction of a multi-use path from Park St. to the Metra Roselle Station South Lot in the village of Roselle. Illinois DOT | Dupage | Bridges & drainage | |
| today Fri Nov 6, 2026 | 028-61M55: Construction of a bridge to carry Randall Rd. over the CN Railway, reconstruction/realignment of the intersection at Hopps Rd., additional through lanes on Randall Rd. and the construction of a shared-use path. Additional work in Illinois DOT | Kane | Bridges & drainage | |
| today Fri Nov 6, 2026 | 031-61M70: Reconstruction of bridge superstructure carrying Theodore St. over Rock Run Creek in the city of Joliet. Additional work includes HMA pavement, sidewalk, shared-use path, storm sewer, retaining wall and other required work. Illinois DOT | Will | Bridges & drainage | |
| today Fri Nov 6, 2026 | 032-61M72: Construction of a three-span PPC IL Beam bridge carrying Harmony Road over Coon Creek in McHenry County. Additional work includes full-depth HMA pavement, pavement markings, drainage improvements, retaining wall and other require Illinois DOT | Mchenry | Bridges & drainage | |
| today Fri Nov 6, 2026 | 034-61M77: Construction of a single span PPC IL beam bridge carrying Paulsen Rd. over the North Branch Kishwaukee River in McHenry County. Additional work includes full-depth HMA pavement with HMA shoulders, guardrail, pavement marking and Illinois DOT | Mchenry | Bridges & drainage | |
| today Fri Nov 6, 2026 | 039-61M89: Furnishing, storing and delivering the precast concrete beams and bearings for the Green Bay Road Bridge rehabilitation over the Union Pacific Railroad in the village of Lake Bluff. Illinois DOT | Lake | Bridges & drainage | |
| today Fri Nov 6, 2026 | 041-64F26: Culvert replacement 0.4 miles west of 780E and 0.4 miles east of Woodhull Rd in Henry County. Illinois DOT | Henry | Bridges & drainage | |
| today Fri Nov 6, 2026 | 042-64H87: 2.7 miles of reconstruction, bridge replacement, interchange reconstruction, lighting, and culvert replacement at the IL 5/I-74 interchange and extending on IL 5 from 16th St to 0.1 miles west of 38th St in Moline and on I-74 fro Illinois DOT | Rock Island | Bridges & drainage | |
| today Fri Nov 6, 2026 | 044-64M06: Culvert replacement and intersection reconstruction on US 6 0.1 miles west of 1050E and at the intersection of US 6 and 1050E. Illinois DOT | Henry | Bridges & drainage | |
| today Fri Nov 6, 2026 | 045-64P60: Bridge and roadway reconstruction on US 20 over I-90 from 0.4 miles west of Wheeler Rd to 0.1 miles east of Ipsen Rd. Approximately 2.59 miles in length. Illinois DOT | Boone | Bridges & drainage | |
| today Fri Nov 6, 2026 | 051-64V94: Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County. Illinois DOT | Rock Island | Bridges & drainage | |
| today Fri Nov 6, 2026 | 052-64V95: Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County. Illinois DOT | Rock Island | Bridges & drainage | |
| today Fri Nov 6, 2026 | 053-64V96: Bridge washing of 3 structures over the Mississippi River in various counties. Illinois DOT | Carroll, Rock Island, Whiteside | Bridges & drainage | |
| today Fri Nov 6, 2026 | 058-85802: Replacement of the bridge carrying 15th Ave. over the Rock River in the city of Rockford. Additional work consists of the reconstruction of the approaches, bridge lighting, traffic signals, sidewalk, water main replacement and la Illinois DOT | Winnebago | Bridges & drainage | |
| today Fri Nov 6, 2026 | 060-66K64: Removal and replacement of bridge structure (SN 050-0254) which carries Water St over Indian Creek located about 0.4 miles north of US 34 in Earlville. Illinois DOT | Lasalle | Bridges & drainage | |
| today Fri Nov 6, 2026 | 062-66M78: Removal of a bridge and replacement with double 9'X9' culverts, SN 053-0103, which carries IL 116 over Short Point Creek approximately 5.4 miles east of IL 251. Illinois DOT | Livingston | Bridges & drainage | |
| today Fri Nov 6, 2026 | 069-66T76: Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout LaSalle and Putnam counties. Illinois DOT | Lasalle, Putnam | Bridges & drainage | |
| today Fri Nov 6, 2026 | 072-89870: Construction of a single-span plate girder bridge carrying Furrow Road over Lost Creek. Work also includes HMA approach pavement, guardrail and other required work. Illinois DOT | Tazewell | Bridges & drainage | |
| today Fri Nov 6, 2026 | 073-89886: Construction of a single-span steel plate girder bridge carrying CH 38 over Shaw Creek in Fulton County. Additional work includes full depth HMA pavement, aggregate shoulders, guardrail and other required work. Illinois DOT | Fulton | Bridges & drainage | |
| today Fri Nov 6, 2026 | 077-70H78: Bridge painting at various structures in Vermilion County. Illinois DOT | Vermilion | Bridges & drainage | |
| today Fri Nov 6, 2026 | 081-72250: Bridge superstructure replacement, bridge bearing replacement, bridge joint replacement, drainage improvements and slopewall removal and replacement on SN 001-0050 and SN 001-0051 carrying I-172 over the Burlington Northern Santa Illinois DOT | Adams | Bridges & drainage | |
| today Fri Nov 6, 2026 | 083-72E70: Bridge painting on SN 069-0035 and SN 069-0036 carrying I-72 over KCS Railroad, 0.5 miles east of IL 267. Illinois DOT | Morgan | Bridges & drainage | |
| today Fri Nov 6, 2026 | 084-72E77: Culvert wing wall repairs on SN 059-7015 carrying IL 4 over unnamed ditch, 5.4 miles south of IL 108. Illinois DOT | Macoupin | Bridges & drainage | |
| today Fri Nov 6, 2026 | 085-72E78: Culvert wing wall repairs on SN 009-7000 carrying IL 125 over Lost Creek Tributary, 0.5 miles east of Bluff Springs Road. Illinois DOT | Cass | Bridges & drainage | |
| today Fri Nov 6, 2026 | 086-72E79: Culvert wing wall repairs on SN 034-7043 carrying US 136 over unnamed ditch, 1 mile west of Carthage. Illinois DOT | Hancock | Bridges & drainage | |
| today Fri Nov 6, 2026 | 087-72E80: Culvert wing wall and channel repairs on SN 001-7089 carrying IL 104 over unnamed ditch, 1 mile east of Liberty. Illinois DOT | Adams | Bridges & drainage | |
| today Fri Nov 6, 2026 | 089-72E87: Pipe culvert removal and replacement on IL 96, 0.2 mile south of TR 159 (1720 N) north of Hamilton. Illinois DOT | Hancock | Bridges & drainage | |
| today Fri Nov 6, 2026 | 090-72E89: Culvert wing wall repairs on SN 085-2006 carrying US 67 over East Fork of Crane Creek, 4.2 miles northwest of IL 100. Illinois DOT | Schuyler | Bridges & drainage | |
| today Fri Nov 6, 2026 | 091-72E90: Bridge painting of four structures over I-172 at various locations in Adams County. (SN SN 001-0048, 001-0058, 001-0060 and 001-0061) Illinois DOT | Adams | Bridges & drainage | |
| today Fri Nov 6, 2026 | 092-72E91: Bridge painting on four structures on I-72 and IL 29 in Sangamon County. (SN 084-0042, 084-0043, 084-0157 and 084-0158) Illinois DOT | Sangamon | Bridges & drainage | |
| today Fri Nov 6, 2026 | 093-72E92: Bridge painting on SN 054-0057 and 054-0058 carrying I-55 over the abandoned IT Railroad, 2.8 miles east of the I-55/I-155 interchange. Illinois DOT | Logan | Non-construction | |
| today Fri Nov 6, 2026 | 094-72E95: Bridge bearing replacements on SN 001-0047 carrying IL 104 over I-172 on the east edge of Quincy. Illinois DOT | Adams | Bridges & drainage | |
| today Fri Nov 6, 2026 | 095-72E99: Bridge deck patching and substructure repairs on SN 068-0047 carrying TR 48 over I-55, 2.3 miles north of IL 16. Illinois DOT | Montgomery | Bridges & drainage | |
| today Fri Nov 6, 2026 | 099-72K00: 4 miles of patching, resurfacing, concrete curb and gutter installation, storm sewer, culvert extensions, earthwork, and drainage improvements on IL 104 from 0.8 miles southwest of CH 1 (Woodson/Franklin Road) to 0.7 miles west o Illinois DOT | Morgan | Bridges & drainage | |
| today Fri Nov 6, 2026 | 102-93861: Roadway reconstruction/rehabilitation of 5th St. from 700th Ave. to I-55 overpass west of the city of Lincoln. Work includes full-depth reclamation, HMA pavement, culverts and other required work. Illinois DOT | Logan | Paving | |
| today Fri Nov 6, 2026 | 103-93862: Construction of three-span steel wide flange beam bridge carrying CH 17 over LaHarpe Creek in Hancock County. Work also includes HMA approach roadways, aggregate shoulders, guardrail and other required work. Illinois DOT | Hancock | Bridges & drainage | |
| today Fri Nov 6, 2026 | 106-74856: Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-0019) Illinois DOT | Macon | Bridges & drainage | |
| today Fri Nov 6, 2026 | 107-74E48: Bridge painting at 15 locations in Cumberland and Clark Counties. Illinois DOT | Clark, Cumberland | Bridges & drainage | |
| today Fri Nov 6, 2026 | 108-74D08: Bridge joint replacement, bridge deck patching, bridge deck scarification, bridge deck overlay and slope wall repairs at four four structures located on I-72 / US 51 at Eldorado Street and Grand Avenue North at the Harristown Int Illinois DOT | Macon | Bridges & drainage | |
| today Fri Nov 6, 2026 | 110-76F81: Removing and replacing the existing structure (SN 060-0405) which carries the American Legion Entrance over Delaplaine Creek in Edwardsville with a new cast-in-place concrete box culvert on new alignment. Illinois DOT | Madison | Bridges & drainage | |
| today Fri Nov 6, 2026 | 112-76M45: Resurfacing and bridge repairs on I-255 from 0.5 miles south of IL 3 at Dupo to 0.2 miles north of IL 157; Southbound IL 3 to Northbound I-255 ramp; Southbound I-255 ramp, IL 157 to Northbound I-255 ramp and SN 082-0217, 0218, 02 Illinois DOT | St. Clair | Bridges & drainage | |
| today Fri Nov 6, 2026 | 113-76M46: Culvert replacement on US 50 at a tributary to Turkey Creek, 1 mile east of Odin. (SN 061-2008) Illinois DOT | Marion | Bridges & drainage | |
| today Fri Nov 6, 2026 | 114-76R14: Bridge repairs and bridge deck overlay: IL 4, IL 150 over Cox Creek (SN 079-0038), 0.1 miles east of Green Street in Steeleville; and IL 4, IL 150 over Mary's River (SN 079-0007), 0.25 miles west of Shawneetown Trail in Steelevil Illinois DOT | Randolph | Bridges & drainage | |
| today Fri Nov 6, 2026 | 116-76T92: 7.6 miles of resurfacing and ADA improvements on IL 4 from IL 154 in Sparta to IL 150. Includes culvert replacement (SN 079-2467) over Middle Tributary to Little Mary-s River, 3 miles south of Sparta. Illinois DOT | Randolph | Bridges & drainage | |
| today Fri Nov 6, 2026 | 123-76V77: Multiple culvert replacements on Kinoka Road / Boat Dock Road from US 51 to 0.2 miles east of Garret Road near Patoka. Illinois DOT | Marion | Bridges & drainage | |
| today Fri Nov 6, 2026 | 128-78A26: Bridge replacement for SN 091-0003 and 091-0004 at the Dongola Interchange on I-57 over Cypress Road at Big Creek, 0.2 miles east of Dongola. Illinois DOT | Union | Bridges & drainage | |
| today Fri Nov 6, 2026 | 131-78B35: Bridge deck overlay and repairs to SN 097-0038 and 097-0039 on I-64 over the Little Wabash River, 4.8 miles west of IL 1. Illinois DOT | White | Bridges & drainage | |
| today Fri Nov 6, 2026 | 133-78B44: Bridge deck overlay on SN 091-0069 carrying IL 3 / IL 146 over Running Lake Ditch, 2 miles south of Ware. Illinois DOT | Union | Bridges & drainage | |
| today Fri Nov 6, 2026 | 136-78C27: Bridge deck concrete sealing on various bridges in Jefferson, Perry and Jackson Counties. Illinois DOT | Jackson, Jefferson, Perry | Bridges & drainage | |
| today Fri Nov 6, 2026 | Z--YELL 338223 - Bridge Preservation [Solicitation; NAICS 237310] Departmental Offices / National Park Service Contracting Activity | | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge rehabilitation including partial deck, beam, superstructure, railing and pin replacement on I-96EB over Milford Road, Oakland County. (MDOT call 001, contract 63022-226741; bid on Bid Express) Michigan DOT (MDOT) | Oakland | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge rehabilitation including deep overlay, full depth patching, barrier with partial deck replacement, partial painting, concrete surface coating, silane treatment,... (MDOT call 002, contract 39042-211178; bid on Bid Express) Michigan DOT (MDOT) | Kalamazoo | Bridges & drainage | |
| today Fri Nov 6, 2026 | 2.10 mi of hot mix asphalt reconstruction, drainage, shared-use path construction, concrete curb, gutter and sidewalk, box culvert replacement, guardrail, geotechnical... (MDOT call 006, contract 34032-214339; bid on Bid Express) Michigan DOT (MDOT) | Ionia | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge reconstruction including culvert replacement, watermain relocation and approach work on M-26 over Eliza Creek, Keweenaw County. (MDOT call 007, contract 42021-213374; bid on Bid Express) Michigan DOT (MDOT) | Keweenaw | Bridges & drainage | |
| today Fri Nov 6, 2026 | 11.10 mi of hot mix asphalt crushing, shaping, cold milling and resurfacing and pavement markings, culvert repair, guardrail improvements and pavement markings on US-41 from... (MDOT call 008, contract 02011-208891; bid on Bid Express) Michigan DOT (MDOT) | Marquette | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge reconstruction including bridge and culvert removal and replacement, guardrail, riprap placement and approach work on M-311 (11 MIle Road) over Alder Creek, Calhoun County. (MDOT call 009, contract 13016-211021; bid on Bid Express) Michigan DOT (MDOT) | Calhoun | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge rehabilitation including deck patching, dual system overlay, replace pin and hanger, beam painting and approach work on US-31 Business Loop (Oceana Drive) over US-31,... (MDOT call 018, contract 64015-211435; bid on Bid Express) Michigan DOT (MDOT) | Oceana | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge rehabilitation including partial superstructure replacement with a 30-inch steel beam on 38th Street over I-94, Kalamazoo County. This project includes a 5 year... (MDOT call 019, contract 39022-226314; bid on Bid Express) Michigan DOT (MDOT) | Kalamazoo | Bridges & drainage | |
| today Fri Nov 6, 2026 | 1.99 mi of hot mix asphalt crushing, shaping and resurfacing, aggregate shoulders, culvert repair, guardrail and pavement markings on Rolland Road from Millbrook Road to... (MDOT call 038, contract 37000-214574; bid on Bid Express) Michigan DOT (MDOT) | Isabella | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge preventative maintenance including cleaning and coating of structural steel and maintenance of traffic on County Road E2 over Ford River and County Road J11 over Ogontz... (MDOT call 042, contract 21000-223574; bid on Bid Express) Michigan DOT (MDOT) | Bridge preventative maintenance including cleaningcoating of structural steelmaintenance of traffic on | Bridges & drainage | |
| today Fri Nov 6, 2026 | 0.55 mi of construction of a shared-use path, installation of a pedestrian bridge, concrete sidewalk ramps and pavement markings on Jefferson Avenue over the Clinton River... (MDOT call 048, contract 50000-219341; bid on Bid Express) Michigan DOT (MDOT) | Macomb | Bridges & drainage | |
| today Fri Nov 6, 2026 | 1.70 mi of shared-use path extension, pedestrian bridge, and permanent signing and pavement markings on Hayhoe Trail from Kerns Road to College Road, Ingham County. This is a... (MDOT call 050, contract 33000-224981; bid on Bid Express) Michigan DOT (MDOT) | Ingham | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge reconstruction including replacement of pedestrian superstructure with prefabricated superstructure with partial abutment replacement and approach work on Iron Belle... (MDOT call 058, contract 50000-224759; bid on Bid Express) Michigan DOT (MDOT) | Macomb | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge reconstruction including replacement with 21-inch prestressed concrete box beams and approach work on Bueche Road over Pattie Creek, Saginaw County. This is a Local... (MDOT call 064, contract 73000-226791; bid on Bid Express) Michigan DOT (MDOT) | Saginaw | Bridges & drainage | |
| today Fri Nov 6, 2026 | Bridge reconstruction including removal and replacement and approach work on Divine Highway over the Looking Glass River in the city of Portland, Ionia County. This is a Local... (MDOT call 065, contract 34000-214705; bid on Bid Express) Michigan DOT (MDOT) | Ionia | Bridges & drainage | |
| today Fri Nov 6, 2026 | I-21-4736 - CO #27 - ATP #32.2 - I-490 Railroad Bridge Construction (27-557THA-ENGCO-B-54473) THA - Toll Highway Authority | | Bridges & drainage | |
| today Fri Nov 6, 2026 | 23-03900 Hays Street Bridge Connections & Eastside Area Streets (2022 Bond) [Invitation for Bids] City of San Antonio - Capital Delivery Department | Bexar | Bridges & drainage | |
| today Fri Nov 6, 2026 | 84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens NYC Transportation | | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | SE District, St. Francois County, Silver Springs Road Bridge Replacement MoDOT local public agency (LPA) projects | | Bridges & drainage | 5% · prequal |
| 4d Tue Nov 10, 2026 | 04-4Q3214: Replace bridge & culverts, HMA, RHMA, Mod lighting & erosion control. Caltrans | Marin | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | 10-0V6904: Cold plane, HMA, RHMA, bridge rehab, culvert, and electrical work. Caltrans | Merced | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | 10-1T2904: Bridge overlay, approach slab, joint seal, HMA, and cold plane. Caltrans | Merced | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Boone Bridge Northbound Joint Replacement (S-73000-00018174) Department of Transportation | | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Monroe - Brodhead, CTH S Intersection, STH 011 - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 002; bid on Bid Express) WisDOT | Green | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Monroe - Brodhead, E Jct STH 81 Intersection, STH 011 - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 003; bid on Bid Express) WisDOT | Green | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Town of Bradford, O Riley Road, Turtle Creek Bridge B-53-0390, LOC STR - Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Beam Guard, (WisDOT proposal 004; bid on Bid Express) WisDOT | Rock | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | T Harrison, Quarry Road, Blakely Branch Bridge B-22-0312, LOC STR - Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, (WisDOT proposal 006; bid on Bid Express) WisDOT | Grant | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Edmund - Mineral Point, Mineral Point Branch Br B-25-198, STH 039 - Grading, Aggregate, Asphalt Pavement, Structure Replacement, Culvert Pipe, Curb and Gutter, (WisDOT proposal 009; bid on Bid Express) WisDOT | Iowa | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | C Madison, Mineral Point Road, USH 12 to High Point Road, LOC STR - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 011; bid on Bid Express) WisDOT | Dane | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | V Deforest, North Towne Road, Vinburn Road Intersection, LOC STR - Removals, Milling, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 013; bid on Bid Express) WisDOT | Dane | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | C Lake Geneva, W Main St, Wells St to Grand Geneva Way, STH 050 - Removals, Milling, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 017; bid on Bid Express) WisDOT | Walworth | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Iola - STH 22/110, STH 49 SB to STH 110, STH 161 - Removals, Milling, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 021; bid on Bid Express) WisDOT | Waupaca | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | T Dupont, Quarterline Road, S Br Pigeon River Bridge, B680153, LOC STR - Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, (WisDOT proposal 025; bid on Bid Express) WisDOT | Waupaca | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Bruce - Radisson, 1.0 Mi to 0.08 Mi S of Elm Creek Rd, STH 040 - Removals, Milling, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 038; bid on Bid Express) WisDOT | Sawyer | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Belmont - Community Path, Belmont Component of the MCRT (Phase I) [$35,864,137] (Highway - Construction, Bridge - Construction; MassDOT project 609204; bid on Bid Express) MassDOT Highway Division · est. $35.9M | | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Sheffield - Bridge Replacement, S-10-015, Kelsey Road over Schenob Brook [$3,427,358] (Bridge - Construction; MassDOT project 609068; bid on Bid Express) MassDOT Highway Division · est. $3.4M | | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Ladys Island Swing Bridge Fender Replacement, Beaufort County, Asset 3186 - Beaufort County, US 21 BUS (SCDOT Contract 0776090) [tentative letting] SCDOT | Beaufort | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | US 1 over SCL RR Bridge Repair - 2024 Interstate/Primary Route Bridge Program, Primary Rank 2024-13 - Chesterfield County, US 1 (SCDOT Contract 1375400) [tentative letting] SCDOT | Chesterfield | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Bridge Replacement - S-29-57 (Old Landsford Rd) over Bear Creek (+1 more projects) - Lancaster County (SCDOT Contract 2974700) [tentative letting] SCDOT | Lancaster | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | SC 200 over Camp Creek Bridge Repair - 2024 Int./Primary Route Bridge Program, Primary Rank 2024-09 - Lancaster County, SC 200 (SCDOT Contract 2975330) [tentative letting] SCDOT | Lancaster | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Bridge Replacement - SC 56 over Duncan Creek - Laurens - Laurens County (SCDOT Contract 3063370) [tentative letting] SCDOT | Laurens | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | Bridge Maintenance - I-26 EB over Bowen Lake (S. Pac Riv) (+1 more projects) - Spartanburg County, I-26 (SCDOT Contract 4276630) [tentative letting] SCDOT | Spartanburg | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | District 4 Interstate Bridge Preservation - District 4 (SCDOT Contract 5476670) [tentative letting] SCDOT | | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | FY27 Culvert Liners (27-494DOT-FINAD-B-54196) DOT - Transportation | | Bridges & drainage | |
| 5d Wed Nov 11, 2026 | US199 @ Demaray Dr MP 2.33 Culvert Replacement Project (S-73000-00018259) Department of Transportation | | Bridges & drainage | |
| 6d Thu Nov 12, 2026 | NH 0503-100 (27241): roadway resurfacing on US 50 from MM 288.9 – 296.6 along with bridge repairs and other improvements. Colorado DOT | | Bridges & drainage | |
| 6d Thu Nov 12, 2026 | WIN 028076.00, Gulliver Brook Bridge (No. 2338) on Nine Mile Woods Road/US Route 2 over Gulliver Brook approximately 0.90of a mile northwesterly of Upper Molunkus Township line. WIN 028080.00, Lower Henderson Bridge (No. 2482) on Nine Mile Maine DOT | | Bridges & drainage | |
| 6d Thu Nov 12, 2026 | Call 7: Big Horn County Road 83 (Bridge Over Shell Creek) (HI-BFP-CN09069) Wyoming DOT | Big Horn | Bridges & drainage | |
| 6d Thu Nov 12, 2026 | Clean/paint bridges: Bridge 1001200, 1001800, 1004200, 1004400, 1014400, 1017600, 1018101/02, 1018700 [$2,500,001 to $5,000,000] (MDOT SHA contract XB1635G80; docs on eMMA, bid on Bid Express) Maryland DOT State Highway Administration (MDOT SHA) · est. $2.5M–$5M | | Bridges & drainage | |
| 10d Mon Nov 16, 2026 | 20270004 - Maverick St. Over Mother Brook Culvert Rehab (BD-26-1258-DPW99-DPW99-134410) Town of Dedham | | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | District 3 - Scheduled and Emergency Structural and Substructure and Related Repairs at Various Locations [$2,300,000] (Bridge - Construction; MassDOT project 614099; bid on Bid Express) MassDOT Highway Division · est. $2.3M | | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | District 5 - Scheduled and Emergency Structural Repairs at Various Locations [$1,367,790] (Bridge - Construction; MassDOT project 616401; bid on Bid Express) MassDOT Highway Division · est. $1.4M | | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | Huntington - Bridge Preservation, H-27-006 (0DH), State Route 112/East Main Street over CSXT and Westfield River [$19,433,277] (Bridge - Construction; MassDOT project 613185; bid on Bid Express) MassDOT Highway Division · est. $19.4M | | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement [Combined Synopsis/Solicitation; NAICS 238910; Small Business Set Aside - Total] Federal Highway Administration / 690567 Western Federal Lands Div | | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | H.014981.6 HOSSTON RIVER ROAD BRIDGE OVER KELLY BAYOU [$2,500,000 to $5,000,000] LA DOTD (11/18/2026 Headquarters letting) · est. $2.5M–$5M | | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | H.015406.6 LOCK NO. 3 ROAD BRIDGE [$1,000,000 to $2,500,000] LA DOTD (11/18/2026 Headquarters letting) · est. $1M–$2.5M | St. Tammany | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | H.016082.6 ST. CLAUDE AVE. BRIDGE (HBI) Local Public Agency project [$10,000,000 to $15,000,000] LA DOTD (11/18/2026 Headquarters letting) · est. $10M–$15M | Orleans | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | H.016223.6 LA 3127: LA 70 - ST. JAMES CANAL BRIDGE [$7,500,000 to $10,000,000] LA DOTD (11/18/2026 Headquarters letting) · est. $7.5M–$10M | Ascension; St. James | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue MoDOT local public agency (LPA) projects | | Bridges & drainage | 5% · prequal |
| 12d Wed Nov 18, 2026 | 04-1Q76U4: Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape. Caltrans | Sonoma | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | 10-1M4804: Cold plane, HMA, curb ramp, culvert, and modify electrical system. Caltrans | Merced | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | WEST EASTON ROAD OVER I-90 BRIDGE – DECK REHABILITATION ($1,000,000 - $1,250,000) Washington State DOT · est. $1M–$1.2M | Kittitas | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | Large Culvert Repair which includes Ultraviolet Cured-In-Place Pipe Lining in the Town of Madison Project is located in on Route 201 in the Town of Madison, Large culvert (#1009752) located 0.68 of a mile south of Route 43. - Madison (WIN 0 Maine DOT | | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | EM 0085(104)56 - Rep Str Bridge, App Grading, Lighting (PCN 04G4) - Belle Fourche Area South Dakota DOT | | Bridges & drainage | |
| 12d Wed Nov 18, 2026 | 1909-113 (TH 55=116) STATE FUNDS IN HENNEPIN AND DAKOTA COUNTIES ON TH 55/62 OVER MINNESOTA RIVER BRIDGE NO. 4190 0.778 MILES (MnDOT District M, Dakota County; contract 260149; bid on Bid Express) Minnesota DOT (MnDOT) | Dakota | Non-construction | |
| 14d Fri Nov 20, 2026 | Call C02: (1): Job JKU0109 Route D CASS County. Bridge deck replacement over Massey Creek near Cleveland, the total length of improvement being 0.142 miles. MoDOT | Cass | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call C03: (1): Job JKU0299 Route 2 CASS County. Culvert replacement and ADA improvements over Muddy Creek in Harrisonville, the total length of improvement being 0.13 miles. MoDOT | Cass | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call D01: (1): Job JCD0072 Route 54 CALLAWAY County. Bridge rehabilitation over Route 54 near Holts Summit, the total length of improvement being 0.112 miles. MoDOT | Callaway | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call D07: (1): Job JCD0294 Route 94 CALLAWAY, MONTGOMERY County. Resurface and 2 bridge rehabilitations from east of Route 63/54 interchange to east of Bluffton, the total length of improvement being 31.162 miles. MoDOT | Callaway, Montgomery | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call D08: (1): Job JCD0309 Route 68 MARIES, PHELPS County. Coldmill, resurface and bridge rehabilitation from Route 63 to north of Matlock Drive, the total length of improvement being 11.73 miles. MoDOT | Maries, Phelps | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call F03: (1): Job JSL0053 Route I-270/I-255 ST LOUIS County. 7 Bridge rehabilitations at the I-255/I-55 Interchange, the total length of improvement being 0.699 miles. MoDOT | St Louis | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call G01: (1): Job J7P3542 Route 64 DALLAS, LACLEDE County. Bridge replacement and ADA improvement over the Niangua River and near Bennett Spring State Park, the total length of improvement being 0.422 miles. MoDOT | Dallas, Laclede | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call G06: (1): Job JSR0059 Route 32 CEDAR, POLK County. Grading, pavement, drainage, bridge replacement and culvert replacement at Route CC, County Road 1350, and 2.3 miles west of Bolivar, over Barren Creek, and at Rout MoDOT | Cedar, Polk | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call G08: (1): Job JSR0083 Route F GREENE County. Bridge replacement over Sac River, the total length of improvement being 0.1752 miles. (2): Job JSR0136 Route 160 GREENE County. Culvert replacement over Hamilton Creek b MoDOT | Greene | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call H01: (1): Job J9P3122 Route I-55 CAPE GIRARDEAU County. Grading, paving, drainage, guardrail and 3 bridge rehabilitations over BNSF Railway and Route 74 and Route 61 over I-55 and at Route 61 and Silver Springs Road MoDOT | Cape Girardeau | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call H05: (1): Job J9P3852 Route 32 ST FRANCOIS County. 2 Bridge rehabilitations, coldmill and resurface from High Street in Bismarck to the south intersection of Business 32, the total length of improvement being 6.954 MoDOT | St Francois | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call H11: (1): Job JSE0106 Route BU67 BUTLER County. Bridge deck replacement over Pike Creek, the total length of improvement being 0.063 miles. MoDOT | Butler | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Replace Bridge: Cmc 3307, N Of Jct Cmc 3310 (PCN 23986, BRC-3307(100)) North Dakota DOT | Oliver | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Replace Bridge: 3 Mi W & 2 Mi N Of Upham (PCN 25695, BRO-0025(055)) North Dakota DOT | Mchenry | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Pipe Various Locations Protection: Culvert Rehab - Golden Valley 2 Mi E 8 Mi N Trotters (PCN 23486, IM-5-094(157)018) North Dakota DOT | Billings | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Bridge Preservation @ 6 Locs In Coweta; Fayette & Troup - Bridges (GDOT M006532; NTC on Bid Express) Georgia DOT | Coweta | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | SR 13 From Dekalb County Line To Rogers Bridge Road - Resurface & Maintenance (GDOT M006747; NTC on Bid Express) Georgia DOT | Gwinnett | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | I-25-4767 Elgin O'hare (I-490) Roadway/Bridge Construction Taft Ave to Beeline Dr MP 0.9 to MP 2.8 (27-557THA-ENGCO-B-54335) THA - Toll Highway Authority | | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | 1337508: 100th St. Bascule Bridge Over the Calumet River Rehabilitation [Construction] City of Chicago (DPS) | Cook | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Call 02: Concrete Repair (Seal & Overlay) approximately 5.9 miles of US 72 from the west end of SR 25 to the Alabama State Line & Bridge Repair on US 72 over MS 25 (Bridge Nos. 84.9A & 84.9B), known as Federal Aid Project Nos. NHPP-0007-01( Mississippi DOT | Tishomingo | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Call 03: Bridge Repair on I-55 over CNIC Railroad (Bridge Nos. 40.3A & 40.3B), known as Federal Aid Project No. NHPP-0055-01(153) / 110044301 in Lincoln County. Mississippi DOT | Lincoln | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Call 04: OGFC lift approximately 7.3 miles on I-55 from Church Road to Heindl Road, Bridge Repair on I-55 over Church Road (Bridge Nos. 112.3A , 112.3B) & Fog Seal approximately 7.2 miles on I-55 from Hiendl Road to the Yazoo County Line, k Mississippi DOT | Madison | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Call 05: Overlay approximately 6.6 miles of US 11 from the north abutment of the Leaf River Bridge to the Jones County Line, known as Federal Aid Project No. STBG-2170-00(028) / 109986301 in Forrest County. Mississippi DOT | Forrest | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Call 06: Bridge Preventive Maintenance on US 61 (Bridge No. 247.7), US 51 (Bridge No. 148.4) and MS 3 (Bridge No. 38.1), known as Federal Aid Project Nos. STBG-9999-03(382) / 1087813030, 1087813031, & 1087813032 in Bolivar, Holmes & Yazoo C Mississippi DOT | Bolivar, Holmes & Yazoo | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Call 1: SOUTH TETON RIVER BRIDGE (Key No. 24341) Idaho Transportation Department | | Bridges & drainage | |
| 18d Tue Nov 24, 2026 | Clean/paint bridges: Bridge 0309700 0315700, 0321703, 0321704, 0325000, 0329600, 0334700, And 03593X0 [$2,500,001 to $5,000,000] (MDOT SHA contract XB1635E80; docs on eMMA, bid on Bid Express) Maryland DOT State Highway Administration (MDOT SHA) · est. $2.5M–$5M | | Bridges & drainage | |
| 19d Wed Nov 25, 2026 | Prequalification for Bridge Preventative Maintenance. Perform Bridge Preventative Maintenance on an as needed basis. - Statewide (WIN PH20261104BPM) Maine DOT | | Bridges & drainage | |
| 19d Wed Nov 25, 2026 | Prequalification for Bridge & Structural Preventative Maintenance Perform Structural Maintenance on an as needed basis. - Statewide (WIN PH20261104BSM) Maine DOT | | Bridges & drainage | |
| 22d Sat Nov 28, 2026 | HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT [Combined Synopsis/Solicitation; NAICS 237310] Forest Service / White River National Forest | Bridgeport | Bridges & drainage | |
| 24d Mon Nov 30, 2026 | Pulaski County, removal of the existing structure and construction of a new 98’-0” single span bridge with prestressed concrete NU-43 girders, etc. MoDOT local public agency (LPA) projects | | Bridges & drainage | 5% · prequal |
| 24d Mon Nov 30, 2026 | Invitation for Bid Hamilton St Bridge Preservation (BD-26-1322-DPW08-DPW08-135086) Town of Saugus | | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | Various - BMIP 2712 - Bridge Maintenance TxDOT · est. $4.4M | De Witt | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | US 190 - US 190-@ CANEY CREEK RELIEF-BRIDGE MAINT - Bridge Maintenance TxDOT · est. $5.4M | Newton | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | COUNTY ROAD 2065 - CR 2065_At Hurricane Byu Rel - HBP - Bridge Replacement TxDOT · est. $1.6M | Houston | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | US 90 - US 90-@ TRINITY RIVER-BRIDGE MAINTENANCE - Bridge Maintenance TxDOT · est. $5.4M | Liberty | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | Various - FY 27 BMN - Various Locations - Bridge Maintenance TxDOT · est. $1.9M | Lubbock | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | COUNTY ROAD 326 - CR 326 @ SA River Bridge Replacement - Bridge Replacement TxDOT · est. $3.1M | Karnes | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | SH 326 - SH 326-@BLACK CREEK-BRIDGE MAINTENANCE - Bridge Maintenance TxDOT · est. $5.4M | Hardin | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | US 190 - US 190-@ CANEY CREEK-BRIDGE MAINTENANCE - Bridge Maintenance TxDOT · est. $5.4M | Newton | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | SH 123 - SH 123 at Big Cottonwood Creek - Bridge Replacement TxDOT · est. $2.8M | Hays | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | MULLENS BAYOU RD - MullensBayouRd(CR42) Bridge Replacement - Bridge Replacement TxDOT · est. $882k | Refugio | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | COUNTY ROAD 2065 - CR 2065_HURRICANE BAYOU - HBP - Bridge Replacement TxDOT · est. $1.6M | Houston | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | WESTMORELAND - Westmoreland Rd NB & SB at Five Mile Crk - Bridge Replacement TxDOT · est. $8.6M | Dallas | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | SH 326 - SH 326-@CYPRESS CREEK-BRIDGE MAINTENANCE - Bridge Maintenance TxDOT · est. $5.4M | Hardin | Bridges & drainage | |
| 25d Tue Dec 1, 2026 (est.) | W PLEASANT RUN RD - Pleasant Run at Ten Mile Creek - Bridge Replacement TxDOT · est. $8.6M | Dallas | Bridges & drainage | |
| 25d Tue Dec 1, 2026 | 11-430874: Clairemont drive bridge deck repair. Caltrans | San Diego | Bridges & drainage | |
| 25d Tue Dec 1, 2026 | Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 693C73 Eastern Fed Lands Division · est. $2M–$3M | | Bridges & drainage | |
| 25d Tue Dec 1, 2026 | Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) [Presolicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 693C73 Eastern Fed Lands Division · est. $2M–$3M | | Bridges & drainage | |
| 25d Tue Dec 1, 2026 | Andover - Bridge Preservation, A-09-022, I-93 over Merrimack River [$105,212,926] (Bridge - Construction; MassDOT project 612193; bid on Bid Express) MassDOT Highway Division · est. $105.2M | | Bridges & drainage | |
| 26d Wed Dec 2, 2026 | T2A91: Intermediate Bridge Replacement Florida DOT (Central Office) | Duval | Bridges & drainage | |
| 26d Wed Dec 2, 2026 | T4767: Intermediate Bridge / Drainage / Grading Florida DOT (Central Office) | St. Lucie | Bridges & drainage | |
| 26d Wed Dec 2, 2026 | T3953: Minor Bridge Replacement Florida DOT (Central Office) | Holmes | Bridges & drainage | |
| 26d Wed Dec 2, 2026 | NOOKSACK RIVER OVERFLOW CULVERT ER PERMANENT REPAIR ($14,000,000 - $15,000,000) Washington State DOT · est. $14M–$15M | Whatcom | Bridges & drainage | |
| 26d Wed Dec 2, 2026 | *IDIQ: 8826-286 STATE FUNDS IN FREEBORN, RICE, AND OLMSTED COUNTIES ON VARIOUS BRIDGES IN DISTRICT 6 BRIDGE PAINTING AND TRAFFIC CONTROL. (MnDOT District 6, Freeborn County; contract 260603; bid on Bid Express) Minnesota DOT (MnDOT) | Freeborn | Non-construction | |
| 26d Wed Dec 2, 2026 | EMERGENCY NOTICE - Bridge Repairs, I-88, MP 121.9 (Canadian National Railway) (27-557THA-ENGCO-B-54025) THA - Toll Highway Authority | | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | 01-0H2464: Install welded steel pipe; structural concrete; & alt pipe culvert. Caltrans | Humboldt | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | 05-1K9014: Construct bridge structure for fish passage restoration. Caltrans | Santa Cruz | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | Center Street Utility Bridge & Water System Improvements (BD-27-1296-SB-MIDSB-134671) Town of Middleborough | | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: US 62 Bridge over Prather Run, SR 62 [$1,000,000 to $2,500,000] (ECMS 88475, MPMS 88475) [planned letting] PennDOT · est. $1M–$2.5M | Forest | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Preservation: SR 4020 over Little Shamokin Activities Creek, SR 4020 (design-build) [$500,000 to $1,000,000] (ECMS 6615, MPMS 6615) [planned letting] PennDOT · est. $500k–$1M | Northumberland | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: SR 2031 over Outlet Lake Winola, SR 2031 [$1,000,000 to $2,500,000] (ECMS 96756, MPMS 96756) [planned letting] PennDOT · est. $1M–$2.5M | Wyoming | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Preservation: SR 29 over Tributary Snake Creek Activities, SR 29 [$1,000,000 to $2,500,000] (ECMS 9701, MPMS 9701) [planned letting] PennDOT · est. $1M–$2.5M | Susquehanna | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Deck: SR 6 over Wallenpaupack Creek Rehabilitation and PPand L Flume, SR 6 (design-build) [$12,500,000 to $15,000,000] (ECMS 68758, MPMS 68758) [planned letting] PennDOT · est. $12.5M–$15M | Pike | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: SR 11 over SR 2037, Susquehanna River and Railroad, SR 7303 (design-build) [$50,000,000 to $60,000,000] (ECMS 93931, MPMS 67255) [planned letting] PennDOT · est. $50M–$60M | Luzerne | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: SR 4006 over Little Tusca, SR 4006 [$2,500,000 to $5,000,000] (ECMS 96747, MPMS 96747) [planned letting] PennDOT · est. $2.5M–$5M | Wyoming | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: SR 11 over SR 2037, Susquehanna River and Railroad, SR 11 (design-build) [$70,000,000 to $80,000,000] (ECMS 93931, MPMS 93931) [planned letting] PennDOT · est. $70M–$80M | Luzerne | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Concrete Rehabilitation: I-78 - SR 412 to Readington Bridge, SR 78 [$10,000,000 to $12,500,000] (ECMS 109318, MPMS 109318) [planned letting] PennDOT · est. $10M–$12.5M | Northampton | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: Pennsylvania Avenue over Delaware Canal (Design Activities, SR 2073 (design-build) [$5,000,000 to $7,500,000] (ECMS 84258, MPMS 84258) [planned letting] PennDOT · est. $5M–$7.5M | Bucks | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: Ship Rd over Valley Creek, SR 1001 (design-build) [$1,000,000 to $2,500,000] (ECMS 98039, MPMS 98039) [planned letting] PennDOT · est. $1M–$2.5M | Chester | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Rehabilitation: Bells Mill & Valley Green Roads o/ Wissahickon Ck., SR 7301 (municipal) [$12,500,000 to $15,000,000] (ECMS 70230, MPMS 70230) [planned letting] PennDOT · est. $12.5M–$15M | Philadelphia | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Rehabilitation: Cherokee St. o/ Valley Green Rd. (City of Phila. Bid No. 3986, SR 7301 (municipal) [$5,000,000 to $7,500,000] (ECMS 111515, MPMS 111515) [planned letting] PennDOT · est. $5M–$7.5M | Philadelphia | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Deck ReplacementUS 30 Bridge over W Br Conococheague Creek, SR 3009 [$1,000,000 to $2,500,000] (ECMS 117144, MPMS 116963) [planned letting] PennDOT · est. $1M–$2.5M | Franklin | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Preservation: US 30 Bridge over W Br Activities Conococheague Creek, SR 30 [$500,000 to $1,000,000] (ECMS 117144, MPMS 117144) [planned letting] PennDOT · est. $500k–$1M | Franklin | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Rehabilitation: PA 72 over Chiques Creek, SR 72 [$2,500,000 to $5,000,000] (ECMS 101300, MPMS 101300) [planned letting] PennDOT · est. $2.5M–$5M | Lancaster | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: Center Rd Bridge T-403, SR 7210 (municipal) [$1,000,000 to $2,500,000] (ECMS 106558, MPMS 106558) [planned letting] PennDOT · est. $1M–$2.5M | Perry | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Improvement: Furnace Road Bridge, SR 7216 (municipal) [$1,000,000 to $2,500,000] (ECMS 106552, MPMS 106552) [planned letting] PennDOT · est. $1M–$2.5M | York | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: Enders Road ov Armstrong Ck, SR 4006 [$2,500,000 to $5,000,000] (ECMS 99885, MPMS 99885) [planned letting] PennDOT · est. $2.5M–$5M | Dauphin | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Preservation: PA 18 Bridge ov Beaver River Activities, SR 18 [$12,500,000 to $15,000,000] (ECMS 105441, MPMS 105441) [planned letting] PennDOT · est. $12.5M–$15M | Beaver | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: Richard Road over Wexford Run, SR 4053 [$1,000,000 to $2,500,000] (ECMS 100723, MPMS 100723) [planned letting] PennDOT · est. $1M–$2.5M | Allegheny | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Improvement: Pike Run #1, SR 7401 (municipal) [$2,500,000 to $5,000,000] (ECMS 51404, MPMS 51404) [planned letting] PennDOT · est. $2.5M–$5M | Washington | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | Clean/paint bridges: Bridge 0213500, 0214900, 0215000, 0216200, 0220000, And 1802600 [$2,500,001 to $5,000,000] (MDOT SHA contract XB1635D80; docs on eMMA, bid on Bid Express) Maryland DOT State Highway Administration (MDOT SHA) · est. $2.5M–$5M | | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Replacement: US 62 Bridge over Prather Run, SR 62 [$2,500,000 to $5,000,000] (ECMS 88475, MPMS 88475) [planned letting] PennDOT · est. $2.5M–$5M | Forest | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Rehabilitation: Bells Mill Road & Valley Green Road Over Wissahickon Creek., SR 7301 (municipal) [$12,500,000 to $15,000,000] (ECMS 70230, MPMS 70230) [planned letting] PennDOT · est. $12.5M–$15M | Philadelphia | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Rehabilitation: Cherokee St. over Valley Green Rd. (City of Phila. Bid No. 3986, SR 7301 (municipal) [$5,000,000 to $7,500,000] (ECMS 111515, MPMS 111515) [planned letting] PennDOT · est. $5M–$7.5M | Philadelphia | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Improvement: Furnace Road Bridge, SR 7216 (municipal) [$2,500,000 to $5,000,000] (ECMS 106552, MPMS 106552) [planned letting] PennDOT · est. $2.5M–$5M | York | Bridges & drainage | |
| 27d Thu Dec 3, 2026 (est.) | Bridge Deck ReplacementUS 30 Bridge over W Br Conococheague Creek, SR 3009 [$500,000 to $1,000,000] (ECMS 117144, MPMS 116963) [planned letting] PennDOT · est. $500k–$1M | Franklin | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | RR-26-2066 Jane Addams Meml Tlwy I-90 Rdwy and Bridge Rehab and Plaza Impr Rock Cut Pk Rd to Genoa R (27-557THA-ENGCO-B-54615) THA - Toll Highway Authority | | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | *FBR 0502-102 (27391): bridge rehabilitation on US 50 from MP 132 – 136.5. Colorado DOT | Gunnison | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | *NHPP 2854-156 (25509): stone matrix asphalt resurfacing US 285 along with ADA ramp improvements and bridge deck maintenance from MP 258.3 - 263.18. Colorado DOT | Arapahoe | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | *NHPP 0062-038 (25407): resurfacing US 6 along with ADA ramp improvements and bridge deck maintenance from MP 272.9 - 275.4. Colorado DOT | Jefferson | Bridges & drainage | |
| 27d Thu Dec 3, 2026 | Clean/paint bridges: Bridge 0213500, 0214900, 0215000, 0216200, 0220000, And 1802600 [$5,000,001 to $10,000,000] (MDOT SHA contract XB1635D80; docs on eMMA, bid on Bid Express) Maryland DOT State Highway Administration (MDOT SHA) · est. $5M–$10M | | Bridges & drainage | |
| 28d Fri Dec 4, 2026 | 1.18 mi of hot mix asphalt roadway reconstruction including storm sewer, sanitary sewer, concrete curb, gutter and sidewalk, culvert replacements, retaining walls, bridge... (MDOT call 002, contract 30011-211153; bid on Bid Express) Michigan DOT (MDOT) | Hillsdale | Bridges & drainage | |
| 28d Fri Dec 4, 2026 | Bridge rehabilitation on two structures including removal of existing epoxy overlay, epoxy overlay, deck patching, expansion joint replacement, thrie beam retrofit, concrete... (MDOT call 003, contract 07012-219333; bid on Bid Express) Michigan DOT (MDOT) | | Bridges & drainage | |
| 28d Fri Dec 4, 2026 | Bridge rehabilitation including partial slab replacement, full depth patching, substructure patching and approach work on Old US-27 over Holden Drain, Clinton County. (MDOT call 004, contract 19031-223486; bid on Bid Express) Michigan DOT (MDOT) | Clinton | Bridges & drainage | |
| 28d Fri Dec 4, 2026 | 2.21 mi of concrete roadway reconstruction, water main, drainage work, guardrail, traffic signals, signing and bridge reconstruction and rehabilitation on several structures... (MDOT call 005, contract 33171-132605; bid on Bid Express) Michigan DOT (MDOT) | Ingham | Bridges & drainage | |
| 28d Fri Dec 4, 2026 | Bridge reconstruction including bridge and culvert removal and replacement, guardrail, riprap placement and approach work on M-311 (11 MIle Road) over Alder Creek, Calhoun County. (MDOT call 209, contract 13016-211021; bid on Bid Express) Michigan DOT (MDOT) | Calhoun | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2) [Presolicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 693C73 Eastern Fed Lands Division · est. $3M–$4M | | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | District 6 - Scheduled & Emergency Structural & Substructure Repairs at Various Locations [$8,490,935] (Bridge - Construction; MassDOT project 616511; bid on Bid Express) MassDOT Highway Division · est. $8.5M | | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Bridge Replacement - S-46-1474 Smith Road over Morris Branch (Closed) - York County (SCDOT Contract 4676390) [tentative letting] SCDOT | York | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements [Solicitation; NAICS 237310] Federal Highway Administration / 690567 Western Federal Lands Div | Orofino | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Horicon - Kewaskum, E Br Rock R Bridge B-14-067, STH 028 - Removals, Grading, Aggregate, Concrete Pavement, Structure Replacement, Curb and Gutter, (WisDOT proposal 003; bid on Bid Express) WisDOT | Dodge | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | T Forest - T Wellington (CTH Z), Billings Creek Bridge B-41-0332, CTH Z - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Structure Replacement, (WisDOT proposal 007; bid on Bid Express) WisDOT | Monroe | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | STH 81 - CTH C (CTH M), Braezels Branch Bridge B-23-0183, CTH M - Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Curb and Gutter, (WisDOT proposal 010; bid on Bid Express) WisDOT | Green | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | T Mt. Ida, Green River Road, Br Big Green River Bridge B-22-0310, LOC STR - Grading, Aggregate, Structure Replacement, Erosion Control, Permanent Signing, Traffic Control, (WisDOT proposal 012; bid on Bid Express) WisDOT | Grant | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | STH 23 - Lone Rock, STH 23 to STH 133, STH 130 - Removals, Milling, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 013; bid on Bid Express) WisDOT | Iowa | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | V Lisbon, Redford Blvd, Intersection With Lisbon Rd, CTH F - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 020; bid on Bid Express) WisDOT | Waukesha | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | T Linn, Zenda Rd, CTH B to Linton Rd, LOC STR - Removals, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, Curb and Gutter, (WisDOT proposal 026; bid on Bid Express) WisDOT | Walworth | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Brillion-Reedsville, Brillion Ecpl-CTH W, USH 010 - Removals, Milling, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, (WisDOT proposal 029; bid on Bid Express) WisDOT | Manitowoc | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | T Ashford, Superior Drive, East Branch Rock River Bridge, LOC STR - Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, Permanent Signing, (WisDOT proposal 032; bid on Bid Express) WisDOT | Fond Du Lac | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | CTH F - CTH E, Big Eau Pleine Rvr Bridge B-37-0481, CTH P - Removals, Grading, Aggregate, Concrete Pavement, Structure Replacement, Beam Guard, (WisDOT proposal 034; bid on Bid Express) WisDOT | Marathon | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Shawano - Langlade, STH 55 and CTH M (E) Intersection, CTH M - Removals, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, Curb and Gutter, (WisDOT proposal 037; bid on Bid Express) WisDOT | Menominee | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Black River Falls - Tomah, Coffee Creek Bridge B-27-0150, USH 012 - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Structure Replacement, (WisDOT proposal 039; bid on Bid Express) WisDOT | Jackson | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | Siren - Spooner, West Co Ln to 1350 Ft W of 1st St, STH 070 - Removals, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, Beam Guard, (WisDOT proposal 042; bid on Bid Express) WisDOT | Washburn | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | T Hoard, Bridge Road, Popple River Bridge B-10-0260, LOC STR - Grading, Aggregate, Structure Replacement, Erosion Control, Permanent Signing, Traffic Control, (WisDOT proposal 046; bid on Bid Express) WisDOT | Clark | Bridges & drainage | |
| 32d Tue Dec 8, 2026 | T Wien, Chesak Road, Scotch Creek Bridge, B-37-0499, LOC STR - Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, (WisDOT proposal 051; bid on Bid Express) WisDOT | Marathon | Bridges & drainage | |
| 33d Wed Dec 9, 2026 | NW District, Buchanan County, SW 26TH Rd Bridge Replacement MoDOT local public agency (LPA) projects | | Bridges & drainage | 5% · prequal |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: SR 27: Grand Street Bridge, SR 27 [$1,000,000 to $2,500,000] (ECMS 2477, MPMS 2477) [planned letting] PennDOT · est. $1M–$2.5M | Warren | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: Petroleum Center Bridge, SR 1004 [$2,500,000 to $5,000,000] (ECMS 2107, MPMS 2107) [planned letting] PennDOT · est. $2.5M–$5M | Venango | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: Camp Run BOX, SR 3001 [$500,000 to $1,000,000] (ECMS 93331, MPMS 93331) [planned letting] PennDOT · est. $500k–$1M | Potter | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: SR 3036 over Mulligan Run, SR 3036 [$500,000 to $1,000,000] (ECMS 116747, MPMS 116747) [planned letting] PennDOT · est. $500k–$1M | Centre | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: Bridge ov Trib Wallace Run, SR 4004 [$1,000,000 to $2,500,000] (ECMS 109581, MPMS 109581) [planned letting] PennDOT · est. $1M–$2.5M | Centre | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: SR 2007 over Doe Run, SR 2007 [$1,000,000 to $2,500,000] (ECMS 85188, MPMS 85188) [planned letting] PennDOT · est. $1M–$2.5M | Juniata | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: SR 14 over Tannery Creek, SR 14 [$1,000,000 to $2,500,000] (ECMS 88915, MPMS 88915) [planned letting] PennDOT · est. $1M–$2.5M | Bradford | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: SR187 over Wysox Creek, SR 187 [$2,500,000 to $5,000,000] (ECMS 99278, MPMS 99278) [planned letting] PennDOT · est. $2.5M–$5M | Bradford | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Preservation: Columbia County bridges paint Activities and steel repairs, SR 254 [$2,500,000 to $5,000,000] (ECMS 120888, MPMS 120888) [planned letting] PennDOT · est. $2.5M–$5M | Columbia | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: SR2027 ov Canoe Camp Crk, SR 2027 [$500,000 to $1,000,000] (ECMS 98514, MPMS 98514) [planned letting] PennDOT · est. $500k–$1M | Tioga | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: SR 187 ov Tr Wysox Cr, SR 187 (design-build) [$1,000,000 to $2,500,000] (ECMS 97621, MPMS 97621) [planned letting] PennDOT · est. $1M–$2.5M | Bradford | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: SR 1030 over Harveys Creek, SR 1030 [$1,000,000 to $2,500,000] (ECMS 115734, MPMS 115734) [planned letting] PennDOT · est. $1M–$2.5M | Luzerne | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Preservation: SR 1006 over SR 309 Bridge Activities Preservation, SR 1006 [$500,000 to $1,000,000] (ECMS 123216, MPMS 123216) [planned letting] PennDOT · est. $500k–$1M | Luzerne | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Preservation: SR 3007 over Interstate 84 Bridge Activities Preservation, SR 3007 (cost range under $100,000) (ECMS 123221, MPMS 123221) [planned letting] PennDOT · est. under $100k | Wayne | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Preservation: SR 29 over Susquehanna River Activities Bridge Preservation, SR 29 (cost range under $100,000) (ECMS 123220, MPMS 123220) [planned letting] PennDOT · est. under $100k | Wyoming | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Preservation: SR 547 over Interstate 81 Bridge Activities Preservation, SR 547 [$1,000,000 to $2,500,000] (ECMS 123219, MPMS 123219) [planned letting] PennDOT · est. $1M–$2.5M | Susquehanna | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: SR 6011 Market Street Culvert, SR 6011 [$2,500,000 to $5,000,000] (ECMS 120813, MPMS 120813) [planned letting] PennDOT · est. $2.5M–$5M | Lackawanna | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: Hill to Hill Bridge Rehabilitation Concrete Overlay, SR 378 [$90,000,000 to $100,000,000] (ECMS 93630, MPMS 93630) [planned letting] PennDOT · est. $90M–$100M | Lehigh | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: Doe Run Road over Buck Run, SR 82 [$5,000,000 to $7,500,000] (ECMS 84284, MPMS 84284) [planned letting] PennDOT · est. $5M–$7.5M | Chester | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Deck: Ben Franklin Bridge Preservation Rehabilitation, SR 7301 (municipal) [$60,000,000 to $70,000,000] (ECMS 72597, MPMS 72597) [planned letting] PennDOT · est. $60M–$70M | Philadelphia | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: Bellaire Rd over Conewago Cr, SR 4037 [$500,000 to $1,000,000] (ECMS 101302, MPMS 101302) [planned letting] PennDOT · est. $500k–$1M | Lancaster | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: Meadow Street over Brush Run, SR 7301 [$200,000 to $500,000] (ECMS 117090, MPMS 117090) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: Meadow Street over Brush Run, SR 3008 [$200,000 to $500,000] (ECMS 117090, MPMS 117088) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: Meadow Street over Brush Run, SR 7301 [$200,000 to $500,000] (ECMS 117090, MPMS 109168) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: Meadow Street over Brush Run, SR 7214 [$200,000 to $500,000] (ECMS 117090, MPMS 109162) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: PA653 Laurel Hill Crk Brg, SR 653 [$5,000,000 to $7,500,000] (ECMS 23462, MPMS 23462) [planned letting] PennDOT · est. $5M–$7.5M | Somerset | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Preservation: AL Local BPRS Group 5 Activities, SR 7420 (municipal) [$12,500,000 to $15,000,000] (ECMS 28426, MPMS 28426) [planned letting] PennDOT · est. $12.5M–$15M | Allegheny | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: SR 4019 over Brush Creek, SR 4019 [$1,000,000 to $2,500,000] (ECMS 89066, MPMS 89066) [planned letting] PennDOT · est. $1M–$2.5M | Westmoreland | Bridges & drainage | |
| 34d Thu Dec 10, 2026 | 02-1J3504: Culvert repair and replacement. Caltrans | Shasta | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: Camp Run BOX, SR 3001 [$200,000 to $500,000] (ECMS 93331, MPMS 93331) [planned letting] PennDOT · est. $200k–$500k | Potter | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Replacement: SR 3040 over Tributary Nescopeck Creek, SR 3040 [$1,000,000 to $2,500,000] (ECMS 67460, MPMS 67460) [planned letting] PennDOT · est. $1M–$2.5M | Luzerne | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: Meadow Street over Brush Run, SR 7301 [$200,000 to $500,000] (ECMS 117090, MPMS 109168) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: Meadow Street over Brush Run, SR 7214 [$200,000 to $500,000] (ECMS 117090, MPMS 109162) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: Meadow Street over Brush Run, SR 7301 [$200,000 to $500,000] (ECMS 117090, MPMS 117090) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Rehabilitation: Meadow Street over Brush Run, SR 3008 [$200,000 to $500,000] (ECMS 117090, MPMS 117088) [planned letting] PennDOT · est. $200k–$500k | Blair | Bridges & drainage | |
| 34d Thu Dec 10, 2026 (est.) | Bridge Improvement: SR 4019 over Brush Creek, SR 4019 [$2,500,000 to $5,000,000] (ECMS 89066, MPMS 89066) [planned letting] PennDOT · est. $2.5M–$5M | Westmoreland | Bridges & drainage | |
| 35d Fri Dec 11, 2026 | Replace Bridge: I-94/Pettibone Interchange (PCN 23344, IM-XB-2-094(186)217) North Dakota DOT | Kidder | Bridges & drainage | |
| 41d Thu Dec 17, 2026 | 08-0R3804: Colorado River bridge replacement. Caltrans | Sbd, Mohave | Bridges & drainage | |
| 41d Thu Dec 17, 2026 | Marshfield - Norwell - Pembroke - Bridge Replacement, N-24-004=P-05-008, Route 3 (NB & SB) over North River Design-Build [$103,050,000] (Bridge - Construction; MassDOT project 607349; bid on Bid Express) MassDOT Highway Division · est. $103M | | Bridges & drainage | |
| 60d Tue Jan 5, 2027 | 12-0K7204: Const bridge, RW, pavement, drainage, and electrical systems. Caltrans | Orange | Bridges & drainage | |
| 75d Wed Jan 20, 2027 | 110812 Hwy. 49 Mississippi River Bridge Rehab. (S) Phillips County [Route 49] ARDOT (statewide letting) | Phillips | Bridges & drainage | |
| 264d Wed Jul 28, 2027 | Bourne - BRIDGE REPLACEMENT, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 OVER THE CAPE COD CANAL, SANDWICH ROAD (ROUTE 6A) AND MCR/MBTA RAILROAD,... [$1,603,899,999] (Bridge - Construction, Highway - Construction; MassDOT project 608020; bid on MassDOT Highway Division · est. $1603.9M | | Bridges & drainage | |