| today Fri Nov 6, 2026 | 003-62V13: (2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glen Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 004-62V31: (8.2-Mile) Cracks and joints routing and filling, pavement marking and collateral or incident work necessary to complete the project. The project is in the Villages of Elburn, Kane County. Illinois DOT | Kane | Paving | |
| today Fri Nov 6, 2026 | 005-62V42: (1.41-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 006-62V47: (4.43-Mile) Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. This project is in t Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 007-62V65: (1.65-Mile) Crack and Joint sealing project consists of crack routing and filling, as well as placement of pavement markings. The project is in the Municipality of Warrenville within DuPage County. Illinois DOT | Dupage | Paving | |
| today Fri Nov 6, 2026 | 011-80C62: (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, pedestrian c Illinois DOT | Lake | Paving | |
| today Fri Nov 6, 2026 | 017-80C93: (1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter remova Illinois DOT | Lake | Paving | |
| today Fri Nov 6, 2026 | 018-80D34: (1.46-Mile) SMART overlay project in which the work to be performed under this contract consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pavement patching, plac Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 019-80D75: (3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement Batch Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 022-80F50: This is a pavement patching improvement consists of Class B Patching, Crack and Joint sealing, concrete curb and gutter repair, placement of pavement markings and raised reflective pavement markers. This improvement is on various Illinois DOT | Lake | Paving | |
| today Fri Nov 6, 2026 | 024-61K73: HMA resurfacing, patching, pavement markings, sidewalks and ADA improvements at various locations in the city of Elgin. Illinois DOT | Kane | Paving | |
| today Fri Nov 6, 2026 | 029-61M65: Resurface Glenview Rd. from Washington St. to Metra Railroad and resurfacing Lehigh Ave./Harlem Ave. from Lake Ave. to Dewes St. in the village of Glenview. Additional work includes sidewalk replacement, curb and gutter replaceme Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 030-61M69: HMA resurfacing and traffic signal improvement of 103rd St. from Southwest Highway to Ridgeland Ave. in the village of Chicago Ridge. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Cook | Safety & signals | |
| today Fri Nov 6, 2026 | 033-61M74: HMA resurfacing of Brainard Ave. from Harding Ave. to 31st St. in the village of LaGrange Park. Additional work includes drainage improvements, sidewalks, ADA ramps, pavement patching and other required work. Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 035-61M81: HMA resurfacing of 5th Ave. from Roosevelt Rd. to Bataan Dr. in the village of Maywood. Additional work includes curb and gutter, sidewalk, ADA ramps and other required work. Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 037-61M86: Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell Rd. to the eastern ter Illinois DOT | Cook | Safety & signals | |
| today Fri Nov 6, 2026 | 038-61M88: HMA resurfacing of Crystal Lake Rd. from Algonquin Rd. to Miller Rd. in the village of Lake in the Hills. Additional work includes pavement patching, drainage improvements, sidewalks, ADA improvements and other required work. Illinois DOT | Mchenry | Bridges & drainage | |
| today Fri Nov 6, 2026 | 043-64L41: 5.79 miles of designed overlay on US 6 from 0.1 miles west of Dilenbeck Dr to US 6 (E); and on ILL 82 from Smith St to 0.4 miles south of I-80 (including ramps). Illinois DOT | Henry | Paving | |
| today Fri Nov 6, 2026 | 046-64S80: 11.97 miles of Cold in Place Recycling, Cold Milling, and HMA resurfacing on IL 26 from US 30 to Bureau County Line. Illinois DOT | Lee | Paving | |
| today Fri Nov 6, 2026 | 047-64U60: 2.89 miles of pavement patching, cold milling, and HMA resurfacing on Springfield Ave from 0.1 mile west of Central Ave to Auburn St northwest of Rockford. Illinois DOT | Winnebago | Paving | |
| today Fri Nov 6, 2026 | 048-64V27: 6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern limit to Barber Creek Rd and I-80 rest area. Illinois DOT | Rock Island | Paving | |
| today Fri Nov 6, 2026 | 056-85799: Reconstruction of the eastbound lanes and shoulders of the Rock Island-Milan Parkway from US 67 to 78th Ave. in Rock Island County. Work includes PCC pavement, raised median replacement, intersection lighting, striping and other Illinois DOT | Rock Island | Safety & signals | |
| today Fri Nov 6, 2026 | 057-85800: HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work includes replacement of box and pipe culverts, drainage improvements, pavement markings and other required work. Illinois DOT | Winnebago | Bridges & drainage | |
| today Fri Nov 6, 2026 | 059-46936: Improvements at Matthiessen State Park Annex consist of resurfacing E. 494th Rd with a concrete surface; construction of a new HMA surface parking lot with lighting; access gates and signage; drainage improvements; and other asso Illinois DOT | Lasalle | Bridges & drainage | |
| today Fri Nov 6, 2026 | 064-66N24: Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located approximately 0.4 miles west of IL 71. Additional work includes milling/resurfacing at roadway approaches, additional shoulders, upgraded guardrails Illinois DOT | Lasalle | Paving | |
| today Fri Nov 6, 2026 | 067-66T44: 36.2 miles, on-call pavement patching and pavement marking at Type IV patches. Begins at the Marshall County line and ends at the Lee County line. Illinois DOT | Lasalle | Paving | |
| today Fri Nov 6, 2026 | 068-66T48: 11.5 miles of resurfacing from LaSalle 0.3 miles west of IL 178 to west of Fox River on interstate 80 north of Ottawa. Illinois DOT | Lasalle | Paving | |
| today Fri Nov 6, 2026 | 071-68K99: PCC Pavement Patching and curb at the EB and WB I-74 Spoon River Rest Areas. Illinois DOT | Knox | Paving | |
| today Fri Nov 6, 2026 | 096-72C54: Resurfacing on IL 61 from 0.2 miles west of IL 94 to east of IL 110/336. Also includes scarification and microsilica overlay of SN 001-0077 and SN 001-0078. Illinois DOT | Adams | Paving | |
| today Fri Nov 6, 2026 | 097-72C61: Resurfacing on IL 100 from 0.3 miles south of US 67 to south of Naples Road, north of Bluffs. Also includes scarification and micro-surfacing of SN 069-0062 on IL 100 at Spring Run Creek, 0.4 miles north of the Scott County line. Illinois DOT | Morgan, Scott | Paving | |
| today Fri Nov 6, 2026 | 098-72C62: Patching, paved shoulders, resurfacing and grading and shaping ditches on US 54 from 0.2 miles south of 345th Street, southwest of Pittsfield, to north of Jim Town Hollow Road in Summer Hill. Illinois DOT | Pike | Paving | |
| today Fri Nov 6, 2026 | 111-76L27: 11 miles of resurfacing on IL 140 from the Madison County line to IL 127 west junction. Illinois DOT | Bond | Paving | |
| today Fri Nov 6, 2026 | 115-76R23: 3.6 miles of resurfacing and ADA upgrades on St. Clair Avenue from 33rd Street Street in East St. Louis to IL 157. Illinois DOT | St. Clair | Paving | |
| today Fri Nov 6, 2026 | 119-76V28: 1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market Street in Waterloo. Illinois DOT | Monroe | Paving | |
| today Fri Nov 6, 2026 | 120-76V29: 55.2 miles of pavement patching on IL 3 from Monroe to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line. Illinois DOT | Randolph | Paving | |
| today Fri Nov 6, 2026 | 121-76V30: Resurfacing and adding shoulders on IL 4 from 0.3 miles south of IL 143 to north of Blue Spruce Lane near St. Jacob. Illinois DOT | Madison | Paving | |
| today Fri Nov 6, 2026 | 122-76V33: 6.7 miles of resurfacing on IL 127 from US 50 South Junction in Carlyle to the Washington County line. Illinois DOT | Clinton | Paving | |
| today Fri Nov 6, 2026 | 124-76V80: 4.1 miles of pavement patching on IL 159 from north of Lincoln Trail in Fairview Heights to IL 161 in Swansea. Illinois DOT | St. Clair | Paving | |
| today Fri Nov 6, 2026 | 126-97893: HMA resurfacing of East Market St. from Hickory St. to Dewey St. in the city of Troy. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Madison | Paving | |
| today Fri Nov 6, 2026 | 127-97898: Construction of bi-directional turn lane with HMA resurfacing and widening on IL 159 (Main St.) from Barker St. to Stonefield Dr. in the village of Smithton. Work includes storm sewers, curb and gutter, ADA ramps, PCC shared-use Illinois DOT | St. Clair | Bridges & drainage | |
| today Fri Nov 6, 2026 | 135-78C23: 6.9 miles of patching and resurfacing on IL 149 from IL 3 to 22nd Street in Murphysboro. Illinois DOT | Jackson | Paving | |
| today Fri Nov 6, 2026 | 139-99755: HMA resurfacing of Wells Bypass Rd. from Veterans Memorial Dr. to IL 148 in Jefferson County. Additional work includes HMA shoulders, turn lanes, pavement markings and other required work. Illinois DOT | Jefferson | Paving | |
| today Fri Nov 6, 2026 | E4Y14: Resurfacing Florida DOT District 4 | Broward | Paving | |
| today Fri Nov 6, 2026 | 1.12 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter and sidewalk, signing and pavement markings on M-85 (Fort Street) from Rosa Parks easterly to... (MDOT call 003, contract 82071-120048; bid on Bid Express) Michigan DOT (MDOT) | Wayne | Paving | |
| today Fri Nov 6, 2026 | 4.59 mi of hot mix asphalt crushing, shaping and resurfacing, drainage improvements and pavement markings on M-91 from south of Stanton Road north to north of Kendaville Road,... (MDOT call 005, contract 59032-211041; bid on Bid Express) Michigan DOT (MDOT) | Montcalm | Bridges & drainage | |
| today Fri Nov 6, 2026 | 5.21 mi of hot mix asphalt cold milling and resurfacing, detail 7/8 joint repairs, longitudinal joint repairs and pavement markings on M-37 from Groat Road northerly to... (MDOT call 010, contract 08031-219039; bid on Bid Express) Michigan DOT (MDOT) | Barry | Paving | |
| today Fri Nov 6, 2026 | 1.37 mi of hot mix asphalt reconstruction, 2.77 mi of hot mix asphalt cold milling and overlay, partial deck replacement, deck patching, epoxy overlay, expansion joint... (MDOT call 012, contract 63132-204314; bid on Bid Express) Michigan DOT (MDOT) | Oakland | Paving | |
| today Fri Nov 6, 2026 | 4.89 mi of hot mix asphalt cold milling and resurfacing, detail 7 joint repairs, concrete pavement repairs, concrete ramp upgrades and pavement markings on US-24 from Fordson... (MDOT call 013, contract 82053-221894; bid on Bid Express) Michigan DOT (MDOT) | Wayne | Paving | |
| today Fri Nov 6, 2026 | 8.94 mi of hot mix asphalt micro-cold milling and overlay over chip seal, minor shoulder repairs and overband crack fill on M-82 from north of 56th Street southerly then... (MDOT call 014, contract 62022-221766; bid on Bid Express) Michigan DOT (MDOT) | Newaygo | Paving | |
| today Fri Nov 6, 2026 | 16.04 mi of hot mix asphalt cold milling and resurfacing, overband crack filling, single chip seal with fog seal, trenching, shoulder widening and paving, installation of... (MDOT call 015, contract 38061-214083; bid on Bid Express) Michigan DOT (MDOT) | Calhoun | Paving | |
| today Fri Nov 6, 2026 | 0.30 mi of concrete roadway reconstruction, intersection reconfiguration, drainage, signing and pavement markings on Northbound Oakland Avenue and Northbound Chrysler Drive... (MDOT call 020, contract 82000-225323; bid on Bid Express) Michigan DOT (MDOT) | Wayne | Bridges & drainage | |
| today Fri Nov 6, 2026 | Traffic signal modernization and pavement markings at M-100 at Vermontville Road and M-52 at Howell Road, Eaton and Ingham Counties. (MDOT call 021, contract 23071-225397; bid on Bid Express) Michigan DOT (MDOT) | | Safety & signals | |
| today Fri Nov 6, 2026 | 17.93 mi of hot mix asphalt crack sealing and overband on US-31 from south of Oceana/Mason County line to Chauvez Road, US-31 from north of Apple Avenue to Mid-Michigan... (MDOT call 022, contract 53034-219588; bid on Bid Express) Michigan DOT (MDOT) | Mason | Paving | |
| today Fri Nov 6, 2026 | Pedestrian safety improvements including HAWK traffic signal, crosswalk, delineation work and pavement markings on I-275 Metro Trail at 7 Mile Road, Ann Arbor Trail, Van Born... (MDOT call 023, contract 82125-222601; bid on Bid Express) Michigan DOT (MDOT) | Wayne | Safety & signals | |
| today Fri Nov 6, 2026 | 0.98 mi of concrete joint repairs, shoulder hot mix asphalt cold milling and resurfacing on M-66 from south of M-50 to south of Barry/Ionia County line, Barry and Eaton Counties. (MDOT call 025, contract 08052-210819; bid on Bid Express) Michigan DOT (MDOT) | Ionia | Paving | |
| today Fri Nov 6, 2026 | 0.27 mi of hot mix asphalt crush, shape and overlay, drainage improvements, signing, and pavement markings on Summit City Road at Walton Road, Grand Traverse County. This is a... (MDOT call 029, contract 28000-219045; bid on Bid Express) Michigan DOT (MDOT) | Grand Traverse | Bridges & drainage | |
| today Fri Nov 6, 2026 | 0.31 mi of hot mix asphalt crush, shape and overlay, drainage improvements, signing and pavement markings on Secor Road at E Long Lake Road and Bass Lake Road, Grand Traverse... (MDOT call 030, contract 28000-219888; bid on Bid Express) Michigan DOT (MDOT) | Grand Traverse | Bridges & drainage | |
| today Fri Nov 6, 2026 | 0.96 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter and sidewalk ramps, signing and pavement markings on 48th Street from Division Avenue easterly to... (MDOT call 031, contract 41000-223748; bid on Bid Express) Michigan DOT (MDOT) | Kent | Paving | |
| today Fri Nov 6, 2026 | 1.87 mi of road rehabilitation including pavement removal, aggregate base, hot mix asphalt resurfacing, and pavement markings on N Shore Drive at I-196 at exit 22, and Blue... (MDOT call 039, contract 03000-226459; bid on Bid Express) Michigan DOT (MDOT) | Allegan | Paving | |
| today Fri Nov 6, 2026 | 1.50 mi of hot mix asphalt base crushing, shaping and resurfacing, drainage improvements and pavement markings on Francis Road from I-69WB Ramp to Clark Road, Clinton County.... (MDOT call 040, contract 19000-223475; bid on Bid Express) Michigan DOT (MDOT) | Clinton | Bridges & drainage | |
| today Fri Nov 6, 2026 | 1.10 mi of concrete curb, gutter and sidewalk, pedestrian refuge island, signing and pavement markings on Reeds Lake Boulevard SE from Centro Boulevard to Manhattan Road,... (MDOT call 041, contract 41000-222855; bid on Bid Express) Michigan DOT (MDOT) | Kent | Paving | |
| today Fri Nov 6, 2026 | 2.98 mi of hot mix asphalt overlay on Rock Road from South Garfield Avenue to South Lake Station Avenue, Clare County. This is a Local Agency project. (MDOT call 043, contract 18000-227168; bid on Bid Express) Michigan DOT (MDOT) | Clare | Paving | |
| today Fri Nov 6, 2026 | 2.28 mi of hot mix asphalt base crushing, shaping and resurfacing, intersection improvements, aggregate shoulders, drive approaches, and pavement markings on College Road from... (MDOT call 046, contract 33000-225034; bid on Bid Express) Michigan DOT (MDOT) | Ingham | Safety & signals | |
| today Fri Nov 6, 2026 | 1.21 mi of hot mix asphalt crushing, shaping, resurfacing and widening for center left turn lane and pavement markings on Cass Road from north of Hartman Road to South Airport... (MDOT call 047, contract 28000-223784; bid on Bid Express) Michigan DOT (MDOT) | Grand Traverse | Paving | |
| today Fri Nov 6, 2026 | 0.62 mi of hot mix asphalt base crushing, shaping and resurfacing, drainage improvements, signing, shoulder work and pavement markings on Baldwin Road from north of I-69 to the... (MDOT call 052, contract 44000-226062; bid on Bid Express) Michigan DOT (MDOT) | Lapeer | Bridges & drainage | |
| today Fri Nov 6, 2026 | 1.53 mi of cape seal, installation of rectangular rapid flashing beacons, pedestrian refuge islands, signing and pavement markings on Cork Street from Westnedge Avenue to... (MDOT call 054, contract 39000-222049; bid on Bid Express) Michigan DOT (MDOT) | Kalamazoo | Paving | |
| today Fri Nov 6, 2026 | Traffic signal modernizations, installation of rectangular rapid flashing beacons, sidewalk ramp upgrades, signing and pavement markings on various routes in the city of Wixom,... (MDOT call 055, contract 63000-221952; bid on Bid Express) Michigan DOT (MDOT) | Oakland | Safety & signals | |
| today Fri Nov 6, 2026 | 0.30 mi of hot mix asphalt milling and reconstruction, construction of median island for separate bike lanes, installation of rectangular rapid flashing beacons and traffic... (MDOT call 056, contract 41000-222051; bid on Bid Express) Michigan DOT (MDOT) | Kent | Paving | |
| today Fri Nov 6, 2026 | 1.51 mi of hot mix asphalt cold milling and resurfacing, concrete sidewalk and ramps, concrete curb and gutter, and pavement markings on Avenue A from M-37 (Helmer Road)... (MDOT call 057, contract 13000-216631; bid on Bid Express) Michigan DOT (MDOT) | Calhoun | Paving | |
| today Fri Nov 6, 2026 | 0.20 mi of hot mix asphalt intersection widening for left turn lanes, drainage improvements, installation of new traffic signal, signing and pavement markings on 26 Mile Road... (MDOT call 059, contract 50000-222055; bid on Bid Express) Michigan DOT (MDOT) | Macomb | Bridges & drainage | |
| today Fri Nov 6, 2026 | 0.90 mi of hot mix asphalt shared-use path, concrete curb, gutter and sidewalk ramps and traffic signal work on 9 Mile from Northwestern Highway to Greenfield Road in the city... (MDOT call 061, contract 63000-224234; bid on Bid Express) Michigan DOT (MDOT) | Oakland | Safety & signals | |
| today Fri Nov 6, 2026 | 3.75 mi of hot mix asphalt cold milling and resurfacing with joint repairs on US-23 from Au Gres River to South Point Lookout Road in the city of AuGres, Arenac County. This... (MDOT call 066, contract 06073-211115; bid on Bid Express) Michigan DOT (MDOT) | Arenac | Paving | |
| today Fri Nov 6, 2026 | 1.20 mi of high friction surface treatment in curve sections of roadway on M-89 from west of 27th Street to east of C Avenue, Kalamazoo County. (MDOT call 067, contract 39103-225437; bid on Bid Express) Michigan DOT (MDOT) | Kalamazoo | Paving | |
| today Fri Nov 6, 2026 | 2.00 mi of concrete sidewalk, curb ramps, drive approaches, signing, pedestrian signals and pavement markings along M-21 from Gould Street to State Road in the cities of... (MDOT call 068, contract 76062-214087; bid on Bid Express) Michigan DOT (MDOT) | Shiawassee | Safety & signals | |
| today Fri Nov 6, 2026 | 2.60 mi of hot mix asphalt cold milling and resurfacing, full depth pavement repair, concrete sidewalk ramp upgrades and pavement markings and traffic signal modernization at... (MDOT call 070, contract 82062-212162; bid on Bid Express) Michigan DOT (MDOT) | Wayne | Safety & signals | |
| today Fri Nov 6, 2026 | 2.89 mi of hot mix asphalt cold milling and resurfacing, minor drainage work and installation of a pedestrian refuge island on I-96BL from Bardaville Drive to Waverly Road in... (MDOT call 071, contract 33081-225401; bid on Bid Express) Michigan DOT (MDOT) | | Bridges & drainage | |
| today Fri Nov 6, 2026 | 1343562: Grade Separated Service Roadway A3/A4 at Chicago ORD Int'l Airport [Construction] City of Chicago (DPS) | Cook | Paving | |
| 4d Tue Nov 10, 2026 | Tyronza Hwy. 118 Sidewalk Ph. 1 (Main St) (TAP-24) (S) City of Tyronza | | Paving | · prequal |
| 4d Tue Nov 10, 2026 | #4844 ITB ITB - Asphalt Equipment City of New Orleans | Orleans | Paving | |
| 4d Tue Nov 10, 2026 | 02-0J5904: Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical. Caltrans | Modoc | Bridges & drainage | |
| 4d Tue Nov 10, 2026 | 12-0S5004: Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd. Caltrans | Orange | Paving | |
| 4d Tue Nov 10, 2026 | Natchez Trace Parkway Project MS NP NATR 3F26 [Solicitation; NAICS 237310; No Set aside used] Federal Highway Administration / 693C73 Eastern Fed Lands Division · est. $10M–$12M | | Paving | |
| 4d Tue Nov 10, 2026 | Acadia National Park [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 693C73 Eastern Fed Lands Division · est. $2M–$3M | | Paving | |
| 4d Tue Nov 10, 2026 | UT NP ARCH 100(2) Bridges on Delicate Arch Road [Solicitation; NAICS 237310; No Set aside used] Federal Highway Administration / 6982Af Central Federal Lands Divisi · est. $10M–$20M | Moab | Paving | |
| 4d Tue Nov 10, 2026 | Acadia National Park [Presolicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 693C73 Eastern Fed Lands Division · est. $2M–$3M | | Paving | |
| 4d Tue Nov 10, 2026 | Call 5: FY27-FY28 D6 PAVEMENT PRESERVATION (Key No. 24960 -24959) Idaho Transportation Department | | Paving | |
| 4d Tue Nov 10, 2026 | Town of Of Wiota, Cisserville Road, E Branch Pecatonica Br B-33-0145, LOC STR - Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Beam Guard, (WisDOT proposal 007; bid on Bid Express) WisDOT | Lafayette | Paving | |
| 4d Tue Nov 10, 2026 | C Milwaukee, W National Ave, 27th St to 1st St, STH 059 - Removals, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Curb and Gutter, (WisDOT proposal 014; bid on Bid Express) WisDOT | Milwaukee | Paving | |
| 4d Tue Nov 10, 2026 | Fond Du Lac - Sheboygan, CTH P - STH 32, STH 023 - Removals, Milling, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, (WisDOT proposal 019; bid on Bid Express) WisDOT | Sheboygan | Paving | |
| 4d Tue Nov 10, 2026 | Merrill - Antigo, Zima Road to USH 45, STH 064 - Milling, Aggregate, Asphalt Pavement, Traffic Control, Pavement Marking (WisDOT proposal 027; bid on Bid Express) WisDOT | Langlade | Paving | |
| 4d Tue Nov 10, 2026 | Ashland - Saxon, 36th Ave to Government Rd, USH 002 - Removals, Milling, Aggregate, Asphalt Pavement, Beam Guard, Traffic Control, (WisDOT proposal 029; bid on Bid Express) WisDOT | Ashland | Paving | |
| 4d Tue Nov 10, 2026 | Melrose - Black River Falls, Roaring Ck B27076,Douglas Ck B27016, STH 054 - Removals, Milling, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, (WisDOT proposal 032; bid on Bid Express) WisDOT | Jackson | Paving | |
| 4d Tue Nov 10, 2026 | T Clifton, CTH M, CTH F to River Falls, CTH M - Permanent Signing, Traffic Control, Pavement Marking (WisDOT proposal 033; bid on Bid Express) WisDOT | Pierce | Paving | |
| 4d Tue Nov 10, 2026 | Osseo - Eau Claire, USH 10 W to Old Town Hall Road, USH 053 - Removals, Milling, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, (WisDOT proposal 035; bid on Bid Express) WisDOT | Eau Claire | Paving | |
| 4d Tue Nov 10, 2026 | West Salem - Melrose, Sand Creek B-27-0010, STH 108 - Removals, Grading, Aggregate, Asphalt Pavement, Structure Rehabilitation, Beam Guard, (WisDOT proposal 036; bid on Bid Express) WisDOT | Jackson | Paving | |
| 4d Tue Nov 10, 2026 | District 1 - Scheduled & Emergency Facility and Salt Shed Repairs/ Improvements at Various Locations [$326,460] (DCAMM-General Building Construction; MassDOT project 616378; bid on Bid Express) MassDOT Highway Division · est. $326k | | Paving | |
| 4d Tue Nov 10, 2026 | District 2 - Scheduled and Emergency Salt Shed Repairs at Various Locations [$339,990] (DCAMM-General Building Construction; MassDOT project 616471; bid on Bid Express) MassDOT Highway Division · est. $340k | | Paving | |
| 4d Tue Nov 10, 2026 | District 6 - Scheduled & Emergency Traffic Control and Setups at Various Locations [$769,715] (Highway - Construction; MassDOT project 616513; bid on Bid Express) MassDOT Highway Division · est. $770k | | Paving | |
| 4d Tue Nov 10, 2026 | Lee - Resurfacing and Related Work on Route 20 [$5,136,381] (Highway - Construction; MassDOT project 610728; bid on Bid Express) MassDOT Highway Division · est. $5.1M | | Paving | |
| 4d Tue Nov 10, 2026 | Medford - Intersection Improvements at Main Street/South Street, Main Street/Mystic Valley Parkway Ramps and Main Street/Mystic Avenue [$6,798,996] (Highway - Construction; MassDOT project 611974; bid on Bid Express) MassDOT Highway Division · est. $6.8M | | Safety & signals | |
| 4d Tue Nov 10, 2026 | 2027 Primary Pavement Improvement Program (+4 more projects) - Clarendon County, SC 260, SC 58, S-38, S-34 ... (SCDOT Contract 1478230) [tentative letting] SCDOT | Clarendon | Paving | |
| 4d Tue Nov 10, 2026 | 2027 Primary Pavement Improvement Program (+2 more projects) - Colleton County, US 17, SC 63, US 17 ALT, US 21 ... (SCDOT Contract 1578380) [tentative letting] SCDOT | Colleton | Paving | |
| 4d Tue Nov 10, 2026 | 2027 NHS Primary Pavement Improvement Program (+2 more projects) - Darlington County, US 52, S-173, S-28, S-27 ... (SCDOT Contract 1677700) [tentative letting] SCDOT | Darlington | Paving | |
| 4d Tue Nov 10, 2026 | 2027 NHS PRIMARY PAVEMENT IMPROVEMENT PROGRAM (+1 more projects) - Florence County, US 76, S-1178, S-461, S-75 ... (SCDOT Contract 2177730) [tentative letting] SCDOT | Florence | Paving | |
| 4d Tue Nov 10, 2026 | 2027 FA Secondary Pavement Improvement Program (+2 more projects) - Greenville County, S-448, S-55, S-143, S-552 ... (SCDOT Contract 2376940) [tentative letting] SCDOT | Greenville | Paving | |
| 4d Tue Nov 10, 2026 | 2027 FA SECONDARY PAVEMENT IMPROVEMENT PROGRAM - Horry County, S-1121, S-19, S-366, S-66 (SCDOT Contract 2677640) [tentative letting] SCDOT | Horry | Paving | |
| 4d Tue Nov 10, 2026 | 2027 Primary Pavement Improvement Program - Richland County, SC 12, US 176, US 21 CON, SC 16 ... (SCDOT Contract 4078430) [tentative letting] SCDOT | Richland | Paving | |
| 4d Tue Nov 10, 2026 | 2027 Primary Pavement Improvement Program (+2 more projects) - Sumter County, US 401, US 521, S-29, S-37 ... (SCDOT Contract 4378280) [tentative letting] SCDOT | Sumter | Paving | |
| 4d Tue Nov 10, 2026 | 2027 NHS Primary Pavement Improvement Program (+3 more projects) - Union County, SC 9, SC 114, S-290, S-383 ... (SCDOT Contract 4477570) [tentative letting] SCDOT | Union | Paving | |
| 4d Tue Nov 10, 2026 | 2027 Non-NHS Primary Pavement Improvement Program (+2 more projects) - Newberry, Saluda Counties, US 176, US 76, S-20, S-87 ... (SCDOT Contract 5277400) [tentative letting] SCDOT | | Paving | |
| 4d Tue Nov 10, 2026 | 2027 Non-NHS Primary Pavement Improvement Program (+2 more projects) - Edgefield, Saluda Counties, SC 283, S-35, S-316, S-52 ... (SCDOT Contract 5277430) [tentative letting] SCDOT | | Paving | |
| 4d Tue Nov 10, 2026 | 2027 NHS Primary Pavement Improvement Program (+4 more projects) - Cherokee, York Counties, US 29, SC 18, S-40, S-137 ... (SCDOT Contract 5477560) [tentative letting] SCDOT | | Paving | |
| 4d Tue Nov 10, 2026 | DDCN Building 154 Asphalt Milling and Paving [Sources Sought; NAICS 237310; Small Business Set Aside - Total] Dept Of The Army / W074 Endist Charleston | | Paving | |
| 5d Wed Nov 11, 2026 | RENEWAL NOTICE I-12-4746 Elgin OHare W. Access (I-490) RDWY Construction At Touhy Avenue MP 5.75 (27-557THA-ENGCO-B-54608) THA - Toll Highway Authority | | Paving | |
| 6d Thu Nov 12, 2026 | Bid 2627-1 - FYE 2027 Street Maintenance Bond Urban Concrete City of Norman | Cleveland | Paving | · pre-bid October 30th 10 a.m. |
| 6d Thu Nov 12, 2026 | NHPP 2854-150 (24422): resurfacing on US 285 from Pine Junction to Foxton Road along with wildlife fence installation, traffic signal replacement and other improvements. Colorado DOT | Jefferson | Safety & signals | |
| 6d Thu Nov 12, 2026 | STA 003A-003 (26759): roadway resurfacing on SH 3 and US 160 along with other improvements. Colorado DOT | La Plata | Paving | |
| 6d Thu Nov 12, 2026 | OK FW TSM 10(1) NFH Entrance Road and Parking Improvements [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 6982Af Central Federal Lands Divisi | Tishomingo | Paving | |
| 6d Thu Nov 12, 2026 | R2 Paving RFB - I5 MP222 NB Fire Damage (S-73000-00018291) Department of Transportation | | Paving | |
| 6d Thu Nov 12, 2026 | Call 4: Chief Joseph Highway (Sugar Loaf Section) (STP-1507043) Wyoming DOT | Park | Paving | |
| 6d Thu Nov 12, 2026 | Call 10: Chief Joseph Hwy (Two Dot Section) (STP-RF-1507045) Wyoming DOT | Park | Paving | |
| 6d Thu Nov 12, 2026 | Gas Leak Repair, Valve Installation, and Asphalt Patching Services [Solicitation; NAICS 237120; Small Business Set Aside - Total] Us Coast Guard / Special Mission Training Center (Smtc) | Birmingham | Paving | |
| 6d Thu Nov 12, 2026 | Rpm: At Various Locations In Carroll, Frederick, And Howard Counties [$2,500,001 to $5,000,000] (MDOT SHA contract XQ6075176; docs on eMMA, bid on Bid Express) Maryland DOT State Highway Administration (MDOT SHA) · est. $2.5M–$5M | | Paving | |
| 7d Fri Nov 13, 2026 | NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's Gener MoDOT local public agency (LPA) projects | | Paving | 5% · prequal |
| 7d Fri Nov 13, 2026 | E3Z28: Resurfacing Prequalification is required to bid on this project. Florida DOT District 3 | Escambia | Paving | |
| 7d Fri Nov 13, 2026 | E3Z97-R0: Pavement Marking - Thermoplastic Stripes and Symbols Florida DOT District 3 | Jackson, Washington | Paving | |
| 7d Fri Nov 13, 2026 | E3Z98: Remove, Replace RPMs and Pavement Markings Florida DOT District 3 | Gadsden, Leon | Paving | |
| 7d Fri Nov 13, 2026 | WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 690567 Western Federal Lands Div | Port Angeles | Paving | |
| 7d Fri Nov 13, 2026 | ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 [Solicitation; NAICS 237310] Federal Highway Administration / 690567 Western Federal Lands Div | Coeur D Alene | Paving | |
| 7d Fri Nov 13, 2026 | I-26-2064 Tri State Twy Asphalt Overlay Pvmt Mark Imprv Plz 35(Cermak) to N. Ave MP 29.9 to MP 33.5 (27-557THA-ENGCO-B-54260) THA - Toll Highway Authority | | Paving | |
| 11d Tue Nov 17, 2026 | McHOST ROAD IMPRV 2 (LA Hwy 64 Port Hudson Pride Rd) 20-EN-HC-0107 TRANSPORTATION AND DRAINAGE | East Baton Rouge | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | 01-0L1104: Earthwork, construct soldier pile walls, & place new roadway section. Caltrans | Mendocino | Paving | |
| 11d Tue Nov 17, 2026 | C205252: MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION (7.210 MI) North Carolina DOT (Central letting) | Wake | Paving | |
| 11d Tue Nov 17, 2026 | C205254: MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION (15.256 MI) North Carolina DOT (Central letting) | Moore | Paving | |
| 11d Tue Nov 17, 2026 | C205255: MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION (17.761 MI) North Carolina DOT (Central letting) | Moore | Paving | |
| 11d Tue Nov 17, 2026 | C205253: MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION (34.701 MI) North Carolina DOT (Central letting) | Davidson | Paving | |
| 11d Tue Nov 17, 2026 | C205091: GRADING, DRAINAGE, PAVING, AND STRUCTURES (0.546 MI) North Carolina DOT (Central letting) | Davidson | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | C205251: MILLING AND RESURFACING (14.270 MI) North Carolina DOT (Central letting) | Mecklenburg | Paving | |
| 11d Tue Nov 17, 2026 | C204976: GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES (3.017 MI) North Carolina DOT (Central letting) | Wilkes | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | C204481: GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES. Page 1 of 15 (1.277 MI) North Carolina DOT (Central letting) | Gaston | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | AZ BL COLO 7528(1) Burro Creek Road [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 6982Af Central Federal Lands Divisi · est. $2M–$5M | Kingman | Paving | |
| 11d Tue Nov 17, 2026 | McHOST ROAD IMPRV 2 (LA Hwy 64 – Port Hudson – Pride Rd) 20-EN-HC-0107 (20008-20-EN-HC-0107) State of Louisiana (LaPAC) | | Paving | 5% · prequal |
| 11d Tue Nov 17, 2026 | Boston - Installation of Noise Barriers along I-90 between Market and Franklin Streets (Allston Multimodal Transportation Project Early Action) [$19,527,316] (Highway - Construction; MassDOT project 616308; bid on Bid Express) MassDOT Highway Division · est. $19.5M | | Paving | |
| 11d Tue Nov 17, 2026 | District 1 - Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Various Locations on I-90 [$1,730,205] (Highway - Construction; MassDOT project 616396; bid on Bid Express) MassDOT Highway Division · est. $1.7M | | Bridges & drainage | |
| 11d Tue Nov 17, 2026 | District 2 - Deployment of Temporary Traffic Control Devices at Various Locations [$2,094,454] (Highway - Construction; MassDOT project 616472; bid on Bid Express) MassDOT Highway Division · est. $2.1M | | Paving | |
| 11d Tue Nov 17, 2026 | District 4 - Deployment of Temporary Traffic Control at Various Locations [$1,714,210] (Highway - Construction; MassDOT project 616482; bid on Bid Express) MassDOT Highway Division · est. $1.7M | | Paving | |
| 11d Tue Nov 17, 2026 | DHS IFB ISD Mill And Repave Power Plant Parking Lot (27-444DHS-PROCU-B-54670) DHS - Human Services | | Paving | |
| 11d Tue Nov 17, 2026 | Call 4: N 10TH AVE ITS & OVERLAY (Key No. 13905) Idaho Transportation Department | | Paving | |
| 11d Tue Nov 17, 2026 | Resurface 2.5 mi of majors: RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I Los Angeles County Public Works | Los Angeles | Paving | |
| 12d Wed Nov 18, 2026 | H.015550.6-R1 PRIDE-BAYWOOD ROAD OVER MILL CREEK [$1,000,000 to $2,500,000] LA DOTD (11/18/2026 Headquarters letting) · est. $1M–$2.5M | | Paving | |
| 12d Wed Nov 18, 2026 | St. Louis District, St. Louis County, Airport Road Multimodal Improvements traffic calming, pavement striping, and installing flexible plastic delineators between North Hanley Road and New Florissant MoDOT local public agency (LPA) projects | | Safety & signals | 5% |
| 12d Wed Nov 18, 2026 | E21U9: Furnish Install and Establish Highway Landscaping and Irrigation Florida DOT District 2 | St. Johns | Paving | |
| 12d Wed Nov 18, 2026 | E22A6: BDI Reconstruct and Dispose of Concrete Ditch Pavement, Sidewalks Florida DOT District 2 | Districtwide | Paving | |
| 12d Wed Nov 18, 2026 | CR-8850-M7 Paving Mix, Hot Winter / DPW (BD-23-1172-PUR00-PUR01-134594) City of Worcester | | Paving | |
| 12d Wed Nov 18, 2026 | P 0025(103)193 - AC Resurfacing, Pipe Work, Grading (PCN 08GH) - Aberdeen Area South Dakota DOT | | Paving | |
| 12d Wed Nov 18, 2026 | NH 0018(261)263 - Unbonded Concrete Overlay, Pipe Work (PCN 08G7) - Winner Area South Dakota DOT | | Paving | |
| 12d Wed Nov 18, 2026 | Asphalt Services at Carr Creek Lake [Solicitation; NAICS 237310] Dept Of The Army / W072 Endist Louisville | | Paving | |
| 12d Wed Nov 18, 2026 | ARBORETUM TRAIL RESURFACTING (BD-27-1693-180LU-180LD-134852) Town of Acton | | Paving | |
| 12d Wed Nov 18, 2026 | Request for Quotes 2027-17 WSNS Basketball Court & Playground Sealcoat Graphics (BD-27-1166-COS01-COS01-135106) City of Somerville | | Paving | |
| 13d Thu Nov 19, 2026 | construct an asphalt trail, rest areas, asphalt surfacing, earthwork, drainage, and associated appurtenances City of Green Forest | | Bridges & drainage | 5% · prequal |
| 13d Thu Nov 19, 2026 | STR 0131-074 (27015): roadway resurfacing and other improvements on SH 13A and SH 64A. Colorado DOT | Rio Blanco | Paving | |
| 13d Thu Nov 19, 2026 | 267 015A-001 (26922): roadway resurfacing and other improvements on SH 15B, SH 136A, and SH 371A. Colorado DOT | Conejos | Paving | |
| 13d Thu Nov 19, 2026 | NHPP 079A-016 (27337): roadway resurfacing SH79 from MM 1.6 - 4.1. Colorado DOT | Adams | Paving | |
| 13d Thu Nov 19, 2026 | STR 0405-043 (27285): roadway chip seal surface treatment on US 40 from MP 446 - 457. Colorado DOT | Cheyenne | Paving | |
| 13d Thu Nov 19, 2026 | UT NP ARCH 100(2) Bridges on Delicate Arch Road [Solicitation; NAICS 237310; No Set aside used] Federal Highway Administration / 6982Af Central Federal Lands Divisi · est. $10M–$20M | Moab | Paving | |
| 13d Thu Nov 19, 2026 | E6Q61-R0: Asphalt Repair Prequalification is not required. Florida DOT District 6 | Miami-Dade | Paving | |
| 13d Thu Nov 19, 2026 | E6Q62-R0: Thermoplastic Pavement Markings Prequalification is not required. Bidder qualifications for pavement marking form must be submitted with bid. Florida DOT District 6 | Miami-Dade | Pro services | |
| 13d Thu Nov 19, 2026 | DMH IFB FY27 EMHC Resurfacing Project-REBID (27-444DHS-PROCU-B-54744) DHS - Human Services | | Paving | |
| 14d Fri Nov 20, 2026 | Call A01: (1): Job JNW0053 Route 190 DAVIESS, GRUNDY County. Resurface from Route F in Jamesport north to Route 146, the total length of improvement being 12.432 miles. (2): Job JNW0062 Route 6 DAVIESS, GRUNDY County. Re MoDOT | Daviess, Grundy | Paving | |
| 14d Fri Nov 20, 2026 | Call A02: (1): Job JST0178 Route Various MERCER, PUTNAM, SULLIVAN County. Resurface, 7 Routes on Routes DD, O, and Z in Mercer County, on Routes EE, N, and YY in Sullivan County, and on Route B in Sullivan and Putnam Cou MoDOT | Mercer, Putnam, Sullivan | Paving | |
| 14d Fri Nov 20, 2026 | Call B01: (1): Job J2P3095 Route 22 AUDRAIN, BOONE, RANDOLPH County. Resurface and add shoulders from Route 63 to Route E in Audrain County near Centralia, the total length of improvement being 16.072 miles. MoDOT | Audrain, Boone, Randolph | Paving | |
| 14d Fri Nov 20, 2026 | Call B02: (1): Job JNE0048 Route 61, 27 CLARK, LEWIS County. Coldmill and resurface from Alexandria to Canton, the total length of improvement being 14.511 miles. MoDOT | Clark, Lewis | Paving | |
| 14d Fri Nov 20, 2026 | Call C01: (1): Job J3P3202 Route BU 50, J JOHNSON County. Coldmill, resurface, drainage and ADA improvements in Knob Noster on BU 50 from Washington Avenue to Sunshine Lane and Route J from SE 25 Road to end of state mai MoDOT | J Johnson | Bridges & drainage | |
| 14d Fri Nov 20, 2026 | Call D02: (1): Job JCD0092 Route 21 WASHINGTON County. Coldmill and resurface from the Jefferson County line to Route 32 in Iron County, 1.5 miles south of Potosi, the total length of improvement being 31.306 miles. MoDOT | Washington | Paving | |
| 14d Fri Nov 20, 2026 | Call D03: (1): Job JCD0106 Route 50 COLE, OSAGE County. Coldmill and resurface on EB Route 50 from west of Shamrock Road to east of Stoney Gap Road and on WB Route 50 from west of Maries River to east of Mari Osa Delta L MoDOT | Cole, Osage | Paving | |
| 14d Fri Nov 20, 2026 | Call D04: (1): Job JCD0162 Route BU I-44, I-44 Spur PULASKI County. Coldmill and resurface on 44 Spur and Bus Loop 44 in St. Robert, the total length of improvement being 10.001 miles. (2): Job JCD0306 Route 17 PULASKI C MoDOT | Pulaski | Paving | |
| 14d Fri Nov 20, 2026 | Call D09: (1): Job JST0179 Route C, Z WASHINGTON County. Resurface from Route Y to Route 21 and Route Z from end of state maintenance to Route C, the total length of improvement being 24.064 miles. MoDOT | Z Washington | Paving | |
| 14d Fri Nov 20, 2026 | Call D6A: (1): Job JCD0270 Route I-44 LACLEDE County. Resurface and rebuild pavement from Route 133 interchange to Route F interchange, the total length of improvement being 5.35 miles. (2): Job JCD0343 Route I-44 LACLED MoDOT | Laclede | Paving | |
| 14d Fri Nov 20, 2026 | Call D6B: (1): Job JST0119 Route I-44 LACLEDE County. Resurface and rebuild pavement from Route 133 interchange to Route F interchange, the total length of improvement being 4.636 miles. MoDOT | Laclede | Paving | |
| 14d Fri Nov 20, 2026 | Call F02: (1): Job JSL0026 Route 141 ST LOUIS County. Coldmill, resurface, sign, and guardrail replacement from I-70 to Route 370, the total length of improvement being 2.48 miles. MoDOT | St Louis | Safety & signals | |
| 14d Fri Nov 20, 2026 | Call G02: (1): Job J7S3390 Route BU60 NEWTON County. Coldmill, resurface, and ADA improvements from Route 60 and 59 north junction 2.2 miles west of Granby to Routes 60 and 59 south junction in Neosho, the total length o MoDOT | Newton | Paving | |
| 14d Fri Nov 20, 2026 | Call G03: (1): Job J7S3506B Route 96 JASPER County. ADA improvements from west of I-49 to Route 571 in Carthage, the total length of improvement being 0.9 miles. (2): Job JSR0060 Route 96 JASPER County. Pavement replacem MoDOT | Jasper | Paving | |
| 14d Fri Nov 20, 2026 | Call G04: (1): Job JSR0016 Route I-49 MCDONALD County. Coldmill and resurface from Route 59 near Goodman to 2.1 miles south of Route 76, the total length of improvement being 13.518 miles. MoDOT | Mcdonald | Paving | |
| 14d Fri Nov 20, 2026 | Call G05: (1): Job JSR0017 Route 43 JASPER County. Coldmill and resurface from 0.1 mile south of Route 171 in Airport Drive to F Street in Joplin, the total length of improvement being 2.979 miles. (2): Job JSR0128 Route MoDOT | Jasper | Paving | |
| 14d Fri Nov 20, 2026 | Call G10: (1): Job JSR0108 Route Z, KK BENTON, HENRY County. Resurface and add shoulders from Route 7 to end of route and on Route Z from Route 13 to Route 7, the total length of improvement being 20.573 miles. MoDOT | Kk Benton, Henry | Paving | |
| 14d Fri Nov 20, 2026 | Call G11: (1): Job 261120-G11 Route 60 BARRY, LAWRENCE County. Coldmill, resurface, roundabout and turn lanes from Route 37 in Monett to FR 1235 in Marionville, the total length of improvement being 17.861 miles. MoDOT | Barry, Lawrence | Paving | |
| 14d Fri Nov 20, 2026 | Call G9A: (1): Job JSR0090 Route C BENTON, HENRY County. Resurface from Route 7 to Route 65 in Lincoln, the total length of improvement being 17.274 miles. (2): Job JSR0111B Route U BENTON County. Resurface from Whiteman MoDOT | Benton, Henry | Paving | |
| 14d Fri Nov 20, 2026 | Call G9B: (1): Job JST0184 Route UU BENTON County. Resurface from beginning of state maintenance to Route 7 near Warsaw, the total length of improvement being 2.457 miles. MoDOT | Benton | Paving | |
| 14d Fri Nov 20, 2026 | Call H02: (1): Job J9P3808 Route 14 DOUGLAS County. Resurface and add shoulders from Route Z to Route 5 in Ava, the total length of improvement being 12.546 miles. MoDOT | Douglas | Paving | |
| 14d Fri Nov 20, 2026 | Call H03: (1): Job J9P3822 Route 67 BUTLER, WAYNE County. Coldmill and resurface in the southbound lane from 0.2 miles south of Route A to 0.9 miles north of Route F, from 0.4 miles north of Route 49 to 0.3 miles south o MoDOT | Butler, Wayne | Paving | |
| 14d Fri Nov 20, 2026 | Call H04: (1): Job J9P3843 Route 72 DENT, REYNOLDS County. Resurface from Route 32 to Route 21 near Bunker, the total length of improvement being 33.76 miles. MoDOT | Dent, Reynolds | Paving | |
| 14d Fri Nov 20, 2026 | Call H06: (1): Job J9S3453 Route M BUTLER County. Intersection pavement replacement at junction of Route M and County Road 459, the total length of improvement being 0.22 miles. MoDOT | Butler | Safety & signals | |
| 14d Fri Nov 20, 2026 | Call H07: (1): Job J9S3777 Route 61 SCOTT County. Resurface from Route 77 to Route Y, the total length of improvement being 10.86 miles. MoDOT | Scott | Paving | |
| 14d Fri Nov 20, 2026 | Call H09: (1): Job J9S3811 Route N SCOTT County. Resurface from Route E to Route D near Charleston, the total length of improvement being 10.07 miles. (2): Job J9S3827 Route A SCOTT County. Resurface from Route 77 in Cha MoDOT | Scott | Paving | |
| 14d Fri Nov 20, 2026 | Call H10: (1): Job JSE0064 Route UU BOLLINGER, CAPE GIRARDEAU County. Resurface from Route B to Route 34, the total length of improvement being 7.502 miles. MoDOT | Bollinger, Cape Girardeau | Paving | |
| 14d Fri Nov 20, 2026 | Call H12: (1): Job JSEP0004 Route Various ST FRANCOIS County. Resurface St. Francois State Park, the total length of improvement being 4.307 miles. MoDOT | St Francois | Paving | |
| 14d Fri Nov 20, 2026 | Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources Sought [Sources Sought; NAICS 237310; Small Business Set Aside - Total] Dept Of The Air Force / Fa2550 50 Cons Pkp | Colorado Springs | Non-construction | |
| 14d Fri Nov 20, 2026 | Deck Overlay, Rehab Approach Slab & Mill And Overlay 2" Max: Various Struct On I29-Fargo District (PCN 23905, IM-BRI-8-029(216)000) North Dakota DOT | Richland | Paving | |
| 14d Fri Nov 20, 2026 | Pcc Pavement & Structure Rehabilitation: N Of Kelso N To N Of N Jct 200 - Sb (PCN 23103, IM-8-029(204)101) North Dakota DOT | Traill | Paving | |
| 14d Fri Nov 20, 2026 | Milling, Hma Overlay 2 Inch Max & Mill Jct Us 2: Near Jct Nd 200 To Williams (PCN 24881, NH-XB-7-085(140)164) North Dakota DOT | Mckenzie | Paving | |
| 14d Fri Nov 20, 2026 | Chip Seal Coat: New Leipzig To Nd 6 (PCN 23843, NH-1-021(022)069) North Dakota DOT | Grant, Morton | Paving | |
| 14d Fri Nov 20, 2026 | Asphalt Overlay > 2" < Or = 3" & Milling: Cmc 0815 From Apple Creek Rd To Nd 1 (PCN 25555, SC-0800(005)) North Dakota DOT | | Paving | |
| 14d Fri Nov 20, 2026 | Hma Overlay 2 Inch Max: Jct I-29 To Red River (PCN 24027, SS-6-005(051)332) North Dakota DOT | Pembina | Paving | |
| 14d Fri Nov 20, 2026 | Asphalt Overlay > 2" < Or = 3" & Pipe: Walhalla To State Line (PCN 23896, SS-6-032(075)231) North Dakota DOT | Pembina | Paving | |
| 14d Fri Nov 20, 2026 | SR 204 From E Of SR 30 To Chatham County Line - Resurface & Maintenance (GDOT M006734; NTC on Bid Express) Georgia DOT | Bryan | Paving | |
| 14d Fri Nov 20, 2026 | CR 147/Murphy Mill Road @ Murphys Mill Pond - Bridges (GDOT 0016573; NTC on Bid Express) Georgia DOT | Sumter | Paving | |
| 14d Fri Nov 20, 2026 | SR 216 From SR 45 To SR 37 - Resurface & Maintenance (GDOT M006698; NTC on Bid Express) Georgia DOT | Calhoun | Paving | |
| 14d Fri Nov 20, 2026 | SR 87 From Twiggs County Line To SR 87 Conn - Resurface & Maintenance (GDOT M006860; NTC on Bid Express) Georgia DOT | Bibb | Paving | |
| 14d Fri Nov 20, 2026 | SR 3 From 21st Ave/Dougherty To Robert B Lee Dr/Lee - Resurface & Maintenance (GDOT M006869; NTC on Bid Express) Georgia DOT | Lee | Paving | |
| 14d Fri Nov 20, 2026 | Off-System Safety Improvements @ 2 Locs In Troup County - Roadway Project (GDOT 0020623; NTC on Bid Express) Georgia DOT | Troup | Safety & signals | |
| 14d Fri Nov 20, 2026 | SR 32 From E Of SR 135 To Bacon County Line - Resurface & Maintenance (GDOT M006736; NTC on Bid Express) Georgia DOT | Coffee | Paving | |
| 14d Fri Nov 20, 2026 | SR 27/US 29 From Telfair County Line To Carter Nobles Circle - Resurface & Maintenance (GDOT M006894; NTC on Bid Express) Georgia DOT | Jeff Davis | Paving | |
| 14d Fri Nov 20, 2026 | SR 115 From SR 11 To Habersham County Line - Resurface & Maintenance (GDOT M006743; NTC on Bid Express) Georgia DOT | White | Paving | |
| 14d Fri Nov 20, 2026 | SR 61 From S Of Gordon Street To CSX #350284W - Resurface & Maintenance (GDOT M006789; NTC on Bid Express) Georgia DOT | Gordon | Paving | |
| 14d Fri Nov 20, 2026 | SR 53 From W Of SR 136 Conn To E Of Pleasant Hill Road - Resurface & Maintenance (GDOT M006932; NTC on Bid Express) Georgia DOT | Pickens | Paving | |
| 14d Fri Nov 20, 2026 | SR 23 From N Of Loves Chapel Road To S Of SR 30 - Resurface & Maintenance (GDOT M006729; NTC on Bid Express) Georgia DOT | Tattnall | Paving | |
| 14d Fri Nov 20, 2026 | SR 46 From SR 56 To SR 297 - Resurface & Maintenance (GDOT M006847; NTC on Bid Express) Georgia DOT | Treutlen | Paving | |
| 14d Fri Nov 20, 2026 | SR 53 From SR 140 To Gordon County Line - Resurface & Maintenance (GDOT M006826; NTC on Bid Express) Georgia DOT | Floyd | Paving | |
| 14d Fri Nov 20, 2026 | I-75 From N Of North Tibbs Road To Tennessee State Line - Pavement Markings (GDOT M006832; NTC on Bid Express) Georgia DOT | Catoosa | Paving | |
| 17d Mon Nov 23, 2026 | MN-FWS TAMARAC VC PARKING SEAL COAT [Solicitation; NAICS 236220; Small Business Set Aside - Total] Departmental Offices / Fws Contracting Activity | | Paving | |
| 17d Mon Nov 23, 2026 | HWCB27KR: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION (EPIN 85027B0026) NYC Design and Construction | | Paving | |
| 17d Mon Nov 23, 2026 | HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION (EPIN 85027B0025) NYC Design and Construction | | Paving | |
| 18d Tue Nov 24, 2026 | Call 01: Overlay approximately 4.7 miles of SR 57 from Strange Street to the Wayne County Line, Overlay approximately 0.9 miles of SR 57 from the Greene County Line to US 45, Overlay approximately 0.2 miles of US 45 from the Alabama State L Mississippi DOT | Greene & Wayne | Paving | |
| 18d Tue Nov 24, 2026 | Call 07: Intersection Improvements on HWY 463 at Stribling Road, known as Federal Aid Project STBG-9999-05(405) / 109032301 in Madison County. Mississippi DOT | Madison | Safety & signals | |
| 18d Tue Nov 24, 2026 | District 1 - Scheduled & Emergency Fabrication & Installation of Overhead and Ground Mounted Guide Signs at Various Locations [$282,000] (Signing - Structural; MassDOT project 616382; bid on Bid Express) MassDOT Highway Division · est. $282k | | Paving | |
| 18d Tue Nov 24, 2026 | District 3 - Scheduled and Emergency Facility and Salt Shed Repairs and Improvements at Various Locations [$2,839,900] (DCAMM-General Building Construction; MassDOT project 616457; bid on Bid Express) MassDOT Highway Division · est. $2.8M | | Paving | |
| 18d Tue Nov 24, 2026 | District 5 - Scheduled and Emergency Traffic Management at Various Locations (Excluding the Islands) [$964,950] (Highway - Construction; MassDOT project 616402; bid on Bid Express) MassDOT Highway Division · est. $965k | | Paving | |
| 18d Tue Nov 24, 2026 | Safety - US1: Main Street To Gorman Road [$15,000,001 to $30,000,000] (MDOT SHA contract HO5415179; docs on eMMA, bid on Bid Express) Maryland DOT State Highway Administration (MDOT SHA) · est. $15M–$30M | | Safety & signals | |
| 21d Fri Nov 27, 2026 | RR-25-6002 - CO #1 - ATP #4 - Systemwide Pavement Repairs (27-557THA-ENGCO-B-54677) THA - Toll Highway Authority | | Paving | |
| 24d Mon Nov 30, 2026 | 27-01 Lamberth Road Widening and Resurfacing Project (Alexander City) [Build ID 20260392] Alexander City | Tallapoosa | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 385 - US385 SEAL COAT (US90 | 23.5 MI S US90) - Preventive Maintenance TxDOT · est. $5.9M | Brewster | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 322 - SH 322, GREGG C/L - US 259 - Seal Coat TxDOT · est. $23.7M | Rusk | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 3450 - FY27 Seal Coat Pavement Preservation. - Preventive Maintenance TxDOT · est. $13.6M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 190 - 0396-03-029 US 190 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Schleicher | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 385 - US385 SEAL COAT (TO 39.6 MI S US 90) - Preventive Maintenance TxDOT · est. $5.9M | Brewster | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1416 - FM 1416 (FM 2460 to SH 87) OVERLAY - Surfacing/Roadway Restoration TxDOT · est. $3.2M | Newton | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 87 - 0069-03-064 STERLING MTN YARD SEAL COAT - Seal Coat TxDOT · est. $13.9M | Sterling | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1874 - 2470-01-007 FM 1874 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Runnels | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 87 - 0070-04-044 US 87 A-R SEAL COAT - Seal Coat TxDOT · est. $13.9M | Concho | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2026 - FM 2026_FM 1645 to US 96 - FY 27 HSIP - Highway Improvement TxDOT · est. $4.9M | Shelby | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 314 - FM 314 N, SH 31 - Van Zandt CL, FY 27 - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2873 - 2844-02-010 RM 2873 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Menard | Paving | |
| 25d Tue Dec 1, 2026 (est.) | BS 208B - DISTRICT SEAL COAT BS 208 B - Resurface Roadway TxDOT · est. $12.7M | Mitchell | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 3450 - FY.27 Seal Coat Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 16 - FM 16, SH 64 - FM 773. SC 2027 - Seal Coat TxDOT · est. $23.7M | Van Zandt | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 16 - FY27 Seal Coat/Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Palo Pinto | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2331 - FY.28.Seal Coat Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Johnson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2134 - 2006-03-013 FM 2134 OVERLAY - ADD PASSING LANES TxDOT · est. $17M | Concho | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 334 - SH 334, US 175 - E. of SH 198, SC 27 - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 87 - 0070-03-060 US 87 A-R SEAL COAT - Seal Coat TxDOT · est. $13.9M | Concho | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1678 - 1647-02-005 FM 1678 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Concho | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 83 - 0035-01-036 US 83 Overlay - ADD PASSING LANES TxDOT · est. $17M | Runnels | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2661 - FM 2664, SH 31 - SH 155, SC 2027 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 80 - US 80, SH 300 - HARRISON C/L - Seal Coat TxDOT · est. $23.7M | Gregg | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 294 - SH 294, ANDR CL - CR 2326 - Seal Coat TxDOT · est. $23.7M | Cherokee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 377 - 0148-04-025 US 377 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Kimble | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 180 - US 180 OVERLAY IN ALBANY 0011-05 - Preventive Maintenance TxDOT · est. $2.8M | Shackelford | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1845 - FM 1845, Upshure CL - FM 2605 - Seal Coat TxDOT · est. $23.7M | Gregg | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 3525 - DISTRICT SEAL COAT 3610-01 - Resurface Roadway TxDOT · est. $12.7M | Mitchell | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 782 - FM 782, FM 1716 - SH 149, SC 2027 - Seal Coat TxDOT · est. $23.7M | Rusk | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 3054 - RM 3054, SH 198 - RM 2329, SC 27 - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 317 - FM 317, FM 607-FM 314, SC - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 377 - 0148-03-029 US 377 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Kimble | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 515 - FM 515, SH 154-FM 1483, SC 27 - Seal Coat TxDOT · est. $23.7M | Wood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 321 - FM 321, FM 645 - SH 19, SC 027 - Seal Coat TxDOT · est. $23.7M | Anderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 271 - US 271, FM 16- IS 20 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 840 - FM 840, US 79/ US 259 - FM 2867 - Seal Coat TxDOT · est. $23.7M | Rusk | Paving | |
| 25d Tue Dec 1, 2026 (est.) | BU 84J - DISTRICT SEAL COAT FY 2027 -38 - Resurface Roadway TxDOT · est. $12.7M | Nolan | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 20 - DISTRICT SEAL COAT FY 2027 0006-02 SFR - Resurface Roadway TxDOT · est. $12.7M | Nolan | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 328 - FM 328_FM 2109 to EOP - FY 27 HSIP - Highway Improvement TxDOT · est. $4.9M | Angelina | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 167 - Summer 2027 District Sealcoat - Preventive Maintenance TxDOT · est. $13.6M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 51 - FY27 SealCoat/Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Wise | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 21 - SH 24, ANDR CL - US 69 - Seal Coat TxDOT · est. $23.7M | Cherokee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 84 - US 84 SEAL COAT SB ONLY NOLAN CO - Resurface Roadway TxDOT · est. $12.7M | Nolan | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 700 - DISTRICT SEAL COAT FY 2027 -19 - Resurface Roadway TxDOT · est. $12.7M | Howard | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 35E - IH 35E From US 77N To Dallas CL - Rehabilitate Existing Roadway TxDOT · est. $6M | Ellis | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 2871 - FY 27 Seal Coat; RM2871, IH20 to IH30 - Preventive Maintenance TxDOT · est. $13.6M | Tarrant | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SS 364 - SS 364, SH 31- SL 323 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 20 - DISTRICT SEAL COAT FY 2027 -16 - Resurface Roadway TxDOT · est. $12.7M | Howard | Paving | |
| 25d Tue Dec 1, 2026 (est.) | Various - FY 2027_Profile Pave Mark - TCD - Highway Improvement TxDOT · est. $4.9M | Angelina | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 707 - DISTRICT SEAL COAT 0677-01 - Resurface Roadway TxDOT · est. $12.7M | Taylor | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2494 - FM 2494, BU 175G - FM 753, SC 2027 - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 154 - SH 154, Quitman Cty Lmt - Upshur C/L, S - Seal Coat TxDOT · est. $23.7M | Wood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 158 - 0344-02-052 SH 158 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Runnels | Paving | |
| 25d Tue Dec 1, 2026 (est.) | Various - FY 27 Districtwide Asphalt Repair Contr - Highway Improvement TxDOT · est. $1.9M | Travis | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 335 - 0830-02-023 RM 335 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Real | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 855 - FM 855, US 175 - FM 346, SC 27 - Seal Coat TxDOT · est. $23.7M | Cherokee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2265 - FY27Seal Coat/Pavement Preservation.1 - Preventive Maintenance TxDOT · est. $13.6M | Wise | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 837 - FM 837, FM 860 - SH 19, SC - Seal Coat TxDOT · est. $23.7M | Anderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 158 - 0405-01-027 SH 158 A-R SEAL COAT - Seal Coat TxDOT · est. $13.9M | Glasscock | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1718 - FY27 Seal Coat/Pavement Preservation.. - Seal Coat TxDOT · est. $6.1M | Johnson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | Various - FY 27 Districtwide Thermo Pav Markings - Highway Improvement TxDOT · est. $2.1M | Potter | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1084 - FM 1084 OVERLAY ALBANY TOWN SECTION - Preventive Maintenance TxDOT · est. $2.8M | Shackelford | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2833 - District Seal Coat FY 2027 2859-01 - Resurface Roadway TxDOT · est. $12.7M | Jones | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1170 - DISTRICT SEAL COAT FY 2027 -34 - Resurface Roadway TxDOT · est. $12.7M | Nolan | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 316 - FM 316 S, US 175 - SH 198 - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 208 - DISTRICT SEAL COAT FY 2027 2011-02 - Resurface Roadway TxDOT · est. $12.7M | Kent | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 3326 - DISTRICT SEAL COAT FY 2027 3455-01 - Resurface Roadway TxDOT · est. $12.7M | Jones | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1605 - Seal Coat FY 2027 SC 1529-03 - Resurface Roadway TxDOT · est. $12.7M | Scurry | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 167 - FM 167:FM 4 to End of Maint. - Seal Coat TxDOT · est. $6.1M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SL 62 - SL 62, US 69 - US 69, SC 27 - Seal Coat TxDOT · est. $23.7M | Cherokee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 167 - FM 167: US 377 to FM 4 - Seal Coat TxDOT · est. $6.1M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 344 - FM 344, FM 756 - SH 110, SC 2027 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 41 - 0201-06-033 SH 41 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Real | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 20 - District Seal Coat 0005-08 FTG ROADS - Resurface Roadway TxDOT · est. $12.7M | Mitchell | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 515 - FM 515, FM 1483-FM 69, SC 27 - Seal Coat TxDOT · est. $23.7M | Wood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 158 - 0405-02-028 SH 158 A-R SEAL COAT - Seal Coat TxDOT · est. $13.9M | Sterling | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 171 - FY27Seal Coat Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Parker | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 180 - DISTRICT SEAL COAT FY 2026 -21 - Resurface Roadway TxDOT · est. $12.7M | Shackelford | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 321 - FM 321, SH 155 - FM 2574, SC 27 - Seal Coat TxDOT · est. $23.7M | Anderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 2401 - 2298-03-012 RM 2401 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Glasscock | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 35E - IH 35E From US 77S To US 77N FY28 - Rehabilitate Existing Roadway TxDOT · est. $6M | Ellis | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 322 - SH 322, SH 149 - RUSK CL - Seal Coat TxDOT · est. $23.7M | Gregg | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 87 - 0070-05-039 US 87 A-R SEAL COAT - Seal Coat TxDOT · est. $13.9M | Concho | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2495 - FM 2495, BS 31 - FM 317, SC 2027 - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 321 - FM 321, SH 19 - SH 155, SC 27 - Seal Coat TxDOT · est. $23.7M | Anderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 208 - DISTRICT SEAL COAT FY 1361-03 - Resurface Roadway TxDOT · est. $12.7M | Scurry | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 208 - 0454-01-050 SH 208 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Coke | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 115 - SH115_Super2_FM874_CR313 - ROADWAY WIDENING TO A SUPER 2 TxDOT · est. $24.2M | Winkler | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 4 - FY26 Seal Coat; FM4, CR 1131 to US 67 - Preventive Maintenance TxDOT · est. $13.6M | Johnson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 41 - 0201-05-026 SH 41 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Edwards | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 1555 - 1486-02-011 RM 1555 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Reagan | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 855 - FM 855, US 69 - FM 346 - Seal Coat TxDOT · est. $23.7M | Cherokee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | Various - VA, VATYLDISTR2027THERMO1 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 837 - FM 837, SH 19 - FM 315 - Seal Coat TxDOT · est. $23.7M | Anderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 40 - IH 40/SP 228 Ramp Overlay - Intersection Improvements With Right And/Or Left T TxDOT · est. $7.8M | Potter | Safety & signals | |
| 25d Tue Dec 1, 2026 (est.) | Various - THERMO - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 2401 - 2298-02-007 RM 2401 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Reagan | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 158 - 0463-04-028 SH 158 A-R SEAL COAT - Seal Coat TxDOT · est. $13.9M | Glasscock | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 77 - US 77 from 1.4 mi N to .57 mi S of SH 21 - Resurface Roadway TxDOT · est. $2M | Lee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 180 - DISTRICT SEAL COAT FY 2026 -23 - Resurface Roadway TxDOT · est. $12.7M | Shackelford | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FS 782 - FS 782, FM 1716 - FM 782 - Seal Coat TxDOT · est. $23.7M | Rusk | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 515 - FM 515, US 69 - SH 11, SC 2027 - Seal Coat TxDOT · est. $23.7M | Wood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 5 - FY27Seal Coat/Pavement Preservation - Seal Coat TxDOT · est. $6.1M | Parker | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2406 - 2361-01-005 FM 2406 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Runnels | Paving | |
| 25d Tue Dec 1, 2026 (est.) | Various - FY 27 CRCP IH27-Lubbock - Rehabilitate Existing Roadway TxDOT · est. $3.1M | Lubbock | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2742 - 2713-01-004 FM 2742 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Coke | Paving | |
| 25d Tue Dec 1, 2026 (est.) | IH 35E - IH 35E From Hill CL To US 77S - Rehabilitate Existing Roadway TxDOT · est. $6M | Ellis | Paving | |
| 25d Tue Dec 1, 2026 (est.) | RM 2401 - 2843-01-014 RM 2401 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Glasscock | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1678 - 1647-01-006 FM 1678 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Runnels | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1876 - FM 1876, Bellaire Bvd to Old Richmond Rd - Surfacing/Roadway Restoration TxDOT · est. $2.8M | Harris | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 707 - DISTRICT SEAL COAT FY 2026 -25 - Resurface Roadway TxDOT · est. $12.7M | Taylor | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 2331 - FY26;SealCoat FM 2331, SH171 to TCL - Preventive Maintenance TxDOT · est. $13.6M | Johnson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1485 - FM 1485: SL 494 to Red Bud Dr - Surfacing/Roadway Restoration TxDOT · est. $1.3M | Montgomery | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 3463 - 3209-01-008 FM 3463 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Menard | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 64 - SH 64, FM 314 - SMITH CL, FY 2027 - Seal Coat TxDOT · est. $23.7M | Van Zandt | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 21 - SH 21, CL - U - Seal Coat TxDOT · est. $23.7M | Cherokee | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 317 - FM 317, FM 314-FM 315, SC - Seal Coat TxDOT · est. $23.7M | Henderson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SL 110 - 0159-08-004 SL 110 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Tom Green | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 314 - FM 314, SH 64 - Henderson CL, SC 2027 - Seal Coat TxDOT · est. $23.7M | Van Zandt | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 17 - FM 17, SH 110 - SH 64, SC 2027 - Seal Coat TxDOT · est. $23.7M | Van Zandt | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 4 - FY27 Seal Coat; FM4, CR 1131 to US 67 - Preventive Maintenance TxDOT · est. $13.6M | Johnson | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 42 - SH 42, SH 64 - US 79, SC 2027 - Seal Coat TxDOT · est. $23.7M | Rusk | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1223 - 0070-01-056 FM 1223 SEAL COAT - Seal Coat TxDOT · est. $9.5M | Tom Green | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 344 - FM 344, SH 155 - FM 346, SC 2027 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 163 - District Seal Coat 0333-01 - Resurface Roadway TxDOT · est. $12.7M | Mitchell | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 669 - District Seal Coat FY 2027 0558-03 - Resurface Roadway TxDOT · est. $12.7M | Borden | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 5 - FY27 Seal Coat Pavement Preservation - Seal Coat TxDOT · est. $6.1M | Parker | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 848 - FM 848, SH 64 - FM 346 - Seal Coat TxDOT · est. $23.7M | Smith | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 1810 - FY27 Seal Coat/Pavement Preservation5 - Preventive Maintenance TxDOT · est. $13.6M | Jack | Paving | |
| 25d Tue Dec 1, 2026 (est.) | Various - FY27.SealCoat/Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Tarrant | Paving | |
| 25d Tue Dec 1, 2026 (est.) | BI 20N - FY 2027 Seal Coat 0006-16 - Resurface Roadway TxDOT · est. $12.7M | Taylor | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SL 567 - SL 567; US 377 to BU 377 - Rehabilitate Existing Roadway TxDOT · est. $16.5M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 70 - DISTRICT SEAL COAT FY 2027 0263-05 - Resurface Roadway TxDOT · est. $12.7M | Fisher | Paving | |
| 25d Tue Dec 1, 2026 (est.) | FM 51 - FY26 Seal Coat/Pavement Preservation7 - Preventive Maintenance TxDOT · est. $13.6M | Hood | Paving | |
| 25d Tue Dec 1, 2026 (est.) | US 80 - US 80, W City Limits - FM 857, SC 27 - Seal Coat TxDOT · est. $23.7M | Van Zandt | Paving | |
| 25d Tue Dec 1, 2026 (est.) | SH 144 - FY27 SealCoat / Pavement Preservation - Preventive Maintenance TxDOT · est. $13.6M | Hood | Paving | |
| 25d Tue Dec 1, 2026 | 08-1L1704: RHMA, cold plane AC pavement, vegetation control (minor Conc) and MGS. Caltrans | Riverside | Paving | |
| 25d Tue Dec 1, 2026 | 12-0R9704: Slab replacement, RHMA paving, modify signal and lighting systems. Caltrans | Orange | Safety & signals | |
| 25d Tue Dec 1, 2026 | E53G3: Resurfacing Florida DOT District 5 | Orange | Paving | |
| 25d Tue Dec 1, 2026 | E54E2-R0: Pavement Markings Florida DOT District 5 | Marion | Paving | |
| 25d Tue Dec 1, 2026 | E54E7: Asphalt Repair Florida DOT District 5 | Brevard | Paving | |
| 25d Tue Dec 1, 2026 | AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements [Solicitation; NAICS 237310; No Set aside used] Federal Highway Administration / 690567 Western Federal Lands Div | Anchorage | Paving | |
| 25d Tue Dec 1, 2026 | District 4 - Scheduled and Emergency Drawbridge Operation, Repairs and Related Work at Various Locations [$6,484,046] (Drawbridge Maintenance; MassDOT project 614107; bid on Bid Express) MassDOT Highway Division · est. $6.5M | | Paving | |
| 25d Tue Dec 1, 2026 | 23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay [Invitation for Bids] City of San Antonio - PWD | Bexar | Paving | |
| 26d Wed Dec 2, 2026 | 08-1N8804: Hot Mix Asphalt, imported borrow and signal and lighting system. Caltrans | Riverside | Safety & signals | |
| 26d Wed Dec 2, 2026 | 11-2N2384: Apply methacrylate, place polyester concrete overlay and joint seals. Caltrans | San Diego | Paving | |
| 26d Wed Dec 2, 2026 | T4777: Resurfacing Florida DOT (Central Office) | Indian River | Paving | |
| 26d Wed Dec 2, 2026 | T1950: Resurfacing Florida DOT (Central Office) | Polk | Paving | |
| 26d Wed Dec 2, 2026 | T2A71: Resurfacing Florida DOT (Central Office) | Levy | Paving | |
| 26d Wed Dec 2, 2026 | T2A76: Resurfacing Florida DOT (Central Office) | St. Johns | Paving | |
| 26d Wed Dec 2, 2026 | T2A89: Resurfacing Florida DOT (Central Office) | Hamilton | Paving | |
| 26d Wed Dec 2, 2026 | T2A90: Resurfacing Florida DOT (Central Office) | Nassau | Paving | |
| 26d Wed Dec 2, 2026 | T3A13: Resurfacing Florida DOT (Central Office) | Okaloosa | Paving | |
| 26d Wed Dec 2, 2026 | T3A31: Resurfacing Florida DOT (Central Office) | Walton | Paving | |
| 26d Wed Dec 2, 2026 | T3A41: Resurfacing Florida DOT (Central Office) | Leon | Paving | |
| 26d Wed Dec 2, 2026 | T4742: Pavement Markings / Resurfacing Florida DOT (Central Office) | Broward | Paving | |
| 26d Wed Dec 2, 2026 | T4755: Electrical / CTC / Roadway Signing Florida DOT (Central Office) | Broward | Paving | |
| 26d Wed Dec 2, 2026 | T5897: Resurfacing Florida DOT (Central Office) | Brevard | Paving | |
| 26d Wed Dec 2, 2026 | T5915: Resurfacing Florida DOT (Central Office) | Brevard | Paving | |
| 26d Wed Dec 2, 2026 | T6608: Resurfacing Florida DOT (Central Office) | Miami-Dade | Paving | |
| 26d Wed Dec 2, 2026 | T6623: Resurfacing Florida DOT (Central Office) | Miami-Dade | Paving | |
| 26d Wed Dec 2, 2026 | T6629: Resurfacing Florida DOT (Central Office) | Miami-Dade | Paving | |
| 26d Wed Dec 2, 2026 | T7618: Resurfacing Florida DOT (Central Office) | Pasco | Paving | |
| 26d Wed Dec 2, 2026 | CO OMAD 300(71) Minuteman Missile Access [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 6982Af Central Federal Lands Divisi | Cheyenne | Paving | |
| 26d Wed Dec 2, 2026 | ND OMAD 2025(1) Minuteman Missile Access Road [Solicitation; NAICS 237310; Small Business Set Aside - Total] Federal Highway Administration / 6982Af Central Federal Lands Divisi | Minot | Paving | |
| 26d Wed Dec 2, 2026 | FY26 Clouter Creek Middle and Highway Cell Diking [Solicitation; NAICS 237990; Small Business Set Aside - Total] Dept Of The Army / W074 Endist Charleston | | Paving | |
| 26d Wed Dec 2, 2026 | 0120-26 (TH 210=002), SAP 001-608-007 STATE FUNDS IN AITKIN COUNTY ON TH 210 AT TH 65 GRADING, BITUMINOUS MILLING AND SURFACING, ROUNDABOUT, ADA IMPROVEMENTS, AND... (MnDOT District 1, Aitkin County; contract 260137; bid on Bid Express) Minnesota DOT (MnDOT) | Aitkin | Non-construction | |
| 26d Wed Dec 2, 2026 | 3104-63 (TH 2=008) NHPP 0002(354) IN ITASCA COUNTY ON TH 2 FROM 750’ WEST OF CR 73 TO 250’ EAST OF CR 74 GRADING, BITUMINOUS MILL & OVERLAY, ADA IMPROVEMENTS, AND... (MnDOT District 1, Itasca County; contract 260140; bid on Bid Express) Minnesota DOT (MnDOT) | Itasca | Paving | |
| 26d Wed Dec 2, 2026 | 2706-240 (TH 7=12) NHPP 0007(306) IN HENNEPIN COUNTY ON TH 7 FROM 0.31 MI. W OF TH 169 TO 0.14 MI. W OF AQUILA AVE. GRADING, BITUMINOUS MILLING AND SURFACING,... (MnDOT District M, Hennepin County; contract 260146; bid on Bid Express) Minnesota DOT (MnDOT) | Hennepin | Paving | |