Get alerts
Home › Arkansas › Polk County
Paving 3d AR · ardot lettings

A40062 Hwy. 8 – South (S) Polk County [Route 375]

ARDOT (statewide letting) · Polk County
Official notice ↗
Due
Wed Nov 4, 2026
Bid bond
not stated
Prequal / license
not stated
Pre-bid
not stated

Estimator brief

Auto-extracted from the public notice · verify
Quoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
Scope
To overlay approximately 11.620 miles of highway 375 in polk county. This project consists of trenching and shoulder preparation, ACHM binder and surface courses, cold milling asphalt pavement, ACHM patching of existing roadway, maintenance of traffic, erosion control, pavement marking, and misc. Items.
Key quantities
Item (as written in the notice)QtyUnit
Trench.and shoulder prep227STA
Aggr.base course(class 7)2,704TON
Tack coat19,298GAL
Cold milling asphalt pvmt2,388SQYD
Asph.conc.patch-maint300TON
Achm patch.exist.rdwy1,000TON
Signs901SQFT
Const.pavement markings250,000LF
Sand bag ditch checks475BAG
Mailboxes25EACH
Length
11.62 miles
Bid bond / security
not stated
Performance & payment bonds
not stated
Prequalification / licensing
not stated
Insurance
not stated
Pre-bid meeting
not stated
Bids due
Wed Nov 4, 2026 (time not stated)
Plans & documents
not stated
Federal aid
STPSC-0057(35)

Brief generated 2026-11-01 · completeness 1/6

Get bids like this by email

Free during early access: one email a day with new Arkansas bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.

Get free daily alerts

Related open bids

All Arkansas bids →

Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.