Paving 3d AR · ardot lettings
A10059 Hwy. 49 – Hwy. 44 (S) Phillips County [Route 85]
ARDOT (statewide letting) · Phillips County
Due
Wed Nov 4, 2026
Bid bond
not stated
Prequal / license
not stated
Pre-bid
not stated
Estimator brief
Auto-extracted from the public notice · verifyQuoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
- Scope
- To place chip seal and fog seal approximately 9.670 miles of highway 85 in phillips county. This project consists of earthwork, trenching and shoulder preparation, aggregate base course, fog seal, asphalt surface treatment, ACHM binder and surface courses, cold milling asphalt pavement, ACHM patching of existing roadway, approach gutters, maintenance of traffic, guardrail, erosion control, rumble strips and stripes, loop wiring, pavement marking, and misc. Items.
- Key quantities
Item (as written in the notice) Qty Unit Unclassified excavation 2 CUYD Trench.and shoulder prep 482 STA Aggr.base course(class 7) 5,067 TON Fog seal (type 2) 18,081 GAL Tack coat 11,923 GAL Mineral aggr.in a.s.t.(cl1) 2,782 TON Poly.mod.cat.emuls.asph(crs2p) 55,634 GAL Cold milling asphalt pvmt 444 SQYD Achm patch.exist.rdwy 300 TON Approach gutters 25.2 CUYD - Length
- 9.67 miles
- Bid bond / security
- not stated
- Performance & payment bonds
- not stated
- Prequalification / licensing
- not stated
- Insurance
- not stated
- Pre-bid meeting
- not stated
- Bids due
- Wed Nov 4, 2026 (time not stated)
- Plans & documents
- not stated
- Federal aid
- STPR-0054(38)
Brief generated 2026-11-01 · completeness 1/6
Get bids like this by email
Free during early access: one email a day with new Arkansas bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.
Get free daily alertsRelated open bids
- 3dA20044 Hwy. 165 – Hwy. 152 (S) Arkansas County [Route 130]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA30049 Hwy. 355 – Hwy. 278 (S) Hempstead & Howard Counties [Route 73]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3d040904 Clear Creek Rd. – I-40 (Phase 1) (F) Crawford County [Route 549]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA40062 Hwy. 8 – South (S) Polk County [Route 375]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3d050439 Hwy. 25 Str. & Apprs. (Independence Co.) (S) Independence County [Route 25]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA50033 Hwy. 67B – Hwy. 13 (S) White County [Route 367]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA50052 Stone Co. Line – Hwy. 25 (S) Independence County [Route 14]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3d061922 Hwys. 7 & 70B Ped. Impvts. (Garland Co.) (S) Garland County [Route 7 & 70B]ARDOT (statewide letting) · due Wed Nov 4, 2026
Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.