| 4d Thu Nov 5, 2026 | CSSC Utility Feed Transformer Replacement [Sources Sought; NAICS 237130] Dept Of The Army / W072 Endist Chicago | | Water & sewer | |
| 5d Fri Nov 6, 2026 | 002-62J16: This is a channelization and culvert replacement project consists of HMA binder course widening, pavement patching, milling of existing HMA surface, placing HMA surface course, box culvert installation, thermoplastic pavement mar Illinois DOT | Kane | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 003-62V13: (2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glen Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 004-62V31: (8.2-Mile) Cracks and joints routing and filling, pavement marking and collateral or incident work necessary to complete the project. The project is in the Villages of Elburn, Kane County. Illinois DOT | Kane | Paving | |
| 5d Fri Nov 6, 2026 | 005-62V42: (1.41-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 006-62V47: (4.43-Mile) Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. This project is in t Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 007-62V65: (1.65-Mile) Crack and Joint sealing project consists of crack routing and filling, as well as placement of pavement markings. The project is in the Municipality of Warrenville within DuPage County. Illinois DOT | Dupage | Paving | |
| 5d Fri Nov 6, 2026 | 008-62W72: (4,251.83-Ft) The Work consists of culvert replacement, HMA pavement and shoulder reconstruction, HMA resurfacing, storm sewer installation, culvert and wingwall installation. This project is in the Village of Winnetka, Cook Coun Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 009-80C12: (386-Ft) Bridge Repair project and the work includes bridge deck patching, steel repairs, and miscellaneous bridge repair. Location in the Villages Skokie and Lincolnwood within Cook County. Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 010-80C58: This project includes HMA surface removal and replacement on the bridge approach, and all incidental and collateral work necessary to complete the project. This project is located at the west approach of (SN 099-0289) and (SN 099 Illinois DOT | Will | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 011-80C62: (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, pedestrian c Illinois DOT | Lake | Paving | |
| 5d Fri Nov 6, 2026 | 012-80C66: Bridge Deck overlay, bridge joint replacement and /repair include deck and approach patching, and substructure repair of (SN 016-0707) located on Canfield Avenue (FAU 2761), over John F. Kennedy Expressway (FAI-90), Chicago, IL. Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 013-80C67: (357-Ft) Bridge Deck Overlay (SN 016-0398) and CTA will undergo routine maintenance consists of reconstruction of the expansion joints with strip seals hydro scarification (3/4-), deck and approach slab repairs, installation of a Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 014-80C69: (250-Ft) Bridge Repairs include hydro scarification, deck slab repair, polymer concrete nosing, approach slab repair, pier concrete repair, abutment concrete sealer, asphalt butt joints, relief joint cleaning sealing, curb and gu Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 015-80C73: Bridge Deck Overlay and Bridge Deck repairs and replacement (SN 099-4622 and SN 099-0338), consist of deck patching, bridge deck joint replacements, hydro- scarification and overlay bridge deck overlay. Location on US 30 / IL 59 Illinois DOT | Will | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 016-80C75: (124-Ft) Project consists of a staged construction to complete deck overlay and joint replacement and repair of the existing bridge, the removal and replacement of curb and gutter, and pavement marking. The project is on IL 83 (E Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 017-80C93: (1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter remova Illinois DOT | Lake | Paving | |
| 5d Fri Nov 6, 2026 | 018-80D34: (1.46-Mile) SMART overlay project in which the work to be performed under this contract consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pavement patching, plac Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 019-80D75: (3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement Batch Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 020-80F19: The work to be done under GRAFFITI REMOVAL shall consist of removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer. This work is located on the inbound and outbound mainlines Illinois DOT | Various | Other | |
| 5d Fri Nov 6, 2026 | 021-80F48: This project consists of Tree removal on various State routes within various counties in District One including: I-290 at 9th St, I-290 at Western Av, US 6 over I-57, IL 176 at Bangs Lake outlet, IL 47/US 30 from Cross st to Jeri Illinois DOT | Various | Other | |
| 5d Fri Nov 6, 2026 | 022-80F50: This is a pavement patching improvement consists of Class B Patching, Crack and Joint sealing, concrete curb and gutter repair, placement of pavement markings and raised reflective pavement markers. This improvement is on various Illinois DOT | Lake | Paving | |
| 5d Fri Nov 6, 2026 | 023-61F87: Sidewalk replacement along various routes in the city of Oak Forest. Additional work includes curb and gutter, ADA ramps, driveway replacement and other required work. Illinois DOT | Cook | Flatwork & trails | |
| 5d Fri Nov 6, 2026 | 024-61K73: HMA resurfacing, patching, pavement markings, sidewalks and ADA improvements at various locations in the city of Elgin. Illinois DOT | Kane | Paving | |
| 5d Fri Nov 6, 2026 | 025-61M06: Construction of a single span PPC deck beam bridge carrying Farrell Rd. over Spring Creek in the city of Joliet. Additional work includes full-depth HMA pavement reconstruction, pipe culverts, guardrail and other required work. Illinois DOT | Will | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 026-61M33: Construction of a single-lane roundabout intersection at the intersection of Highland Ave. and Lyle Ave. in the city of Elgin. Work includes HMA pavement reconstruction, curb and gutter, sidewalks, storm sewer, lighting and other Illinois DOT | Kane | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 027-61M54: Construction of a pedestrian bridge over IL 19/Irving Park Rd., retaining walls and the construction of a multi-use path from Park St. to the Metra Roselle Station South Lot in the village of Roselle. Illinois DOT | Dupage | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 028-61M55: Construction of a bridge to carry Randall Rd. over the CN Railway, reconstruction/realignment of the intersection at Hopps Rd., additional through lanes on Randall Rd. and the construction of a shared-use path. Additional work in Illinois DOT | Kane | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 029-61M65: Resurface Glenview Rd. from Washington St. to Metra Railroad and resurfacing Lehigh Ave./Harlem Ave. from Lake Ave. to Dewes St. in the village of Glenview. Additional work includes sidewalk replacement, curb and gutter replaceme Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 030-61M69: HMA resurfacing and traffic signal improvement of 103rd St. from Southwest Highway to Ridgeland Ave. in the village of Chicago Ridge. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Cook | Safety & signals | |
| 5d Fri Nov 6, 2026 | 031-61M70: Reconstruction of bridge superstructure carrying Theodore St. over Rock Run Creek in the city of Joliet. Additional work includes HMA pavement, sidewalk, shared-use path, storm sewer, retaining wall and other required work. Illinois DOT | Will | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 032-61M72: Construction of a three-span PPC IL Beam bridge carrying Harmony Road over Coon Creek in McHenry County. Additional work includes full-depth HMA pavement, pavement markings, drainage improvements, retaining wall and other require Illinois DOT | Mchenry | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 033-61M74: HMA resurfacing of Brainard Ave. from Harding Ave. to 31st St. in the village of LaGrange Park. Additional work includes drainage improvements, sidewalks, ADA ramps, pavement patching and other required work. Illinois DOT | Cook | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 034-61M77: Construction of a single span PPC IL beam bridge carrying Paulsen Rd. over the North Branch Kishwaukee River in McHenry County. Additional work includes full-depth HMA pavement with HMA shoulders, guardrail, pavement marking and Illinois DOT | Mchenry | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 035-61M81: HMA resurfacing of 5th Ave. from Roosevelt Rd. to Bataan Dr. in the village of Maywood. Additional work includes curb and gutter, sidewalk, ADA ramps and other required work. Illinois DOT | Cook | Paving | |
| 5d Fri Nov 6, 2026 | 036-61M82: Resurface Prairie Ave. from Brookfield Ave. to 31st St. in the village of Brookfield. Additional work consists of sidewalk replacement, curb and gutter replacement, water main improvements, combined sewer replacement, pavement ma Illinois DOT | Cook | Water & sewer | |
| 5d Fri Nov 6, 2026 | 037-61M86: Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell Rd. to the eastern ter Illinois DOT | Cook | Safety & signals | |
| 5d Fri Nov 6, 2026 | 038-61M88: HMA resurfacing of Crystal Lake Rd. from Algonquin Rd. to Miller Rd. in the village of Lake in the Hills. Additional work includes pavement patching, drainage improvements, sidewalks, ADA improvements and other required work. Illinois DOT | Mchenry | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 039-61M89: Furnishing, storing and delivering the precast concrete beams and bearings for the Green Bay Road Bridge rehabilitation over the Union Pacific Railroad in the village of Lake Bluff. Illinois DOT | Lake | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 040-64E09: Removal and replacement of the structure (SN 101-0109) carrying IL 75 over the Rock River in Rockton. Illinois DOT | Winnebago | Other | |
| 5d Fri Nov 6, 2026 | 041-64F26: Culvert replacement 0.4 miles west of 780E and 0.4 miles east of Woodhull Rd in Henry County. Illinois DOT | Henry | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 042-64H87: 2.7 miles of reconstruction, bridge replacement, interchange reconstruction, lighting, and culvert replacement at the IL 5/I-74 interchange and extending on IL 5 from 16th St to 0.1 miles west of 38th St in Moline and on I-74 fro Illinois DOT | Rock Island | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 043-64L41: 5.79 miles of designed overlay on US 6 from 0.1 miles west of Dilenbeck Dr to US 6 (E); and on ILL 82 from Smith St to 0.4 miles south of I-80 (including ramps). Illinois DOT | Henry | Paving | |
| 5d Fri Nov 6, 2026 | 044-64M06: Culvert replacement and intersection reconstruction on US 6 0.1 miles west of 1050E and at the intersection of US 6 and 1050E. Illinois DOT | Henry | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 045-64P60: Bridge and roadway reconstruction on US 20 over I-90 from 0.4 miles west of Wheeler Rd to 0.1 miles east of Ipsen Rd. Approximately 2.59 miles in length. Illinois DOT | Boone | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 046-64S80: 11.97 miles of Cold in Place Recycling, Cold Milling, and HMA resurfacing on IL 26 from US 30 to Bureau County Line. Illinois DOT | Lee | Paving | |
| 5d Fri Nov 6, 2026 | 047-64U60: 2.89 miles of pavement patching, cold milling, and HMA resurfacing on Springfield Ave from 0.1 mile west of Central Ave to Auburn St northwest of Rockford. Illinois DOT | Winnebago | Paving | |
| 5d Fri Nov 6, 2026 | 048-64V27: 6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern limit to Barber Creek Rd and I-80 rest area. Illinois DOT | Rock Island | Paving | |
| 5d Fri Nov 6, 2026 | 050-64V82: Cleaning and painting of structural steel on SN 071-0055 carrying IL 64 over I-39. Illinois DOT | Ogle | Other | |
| 5d Fri Nov 6, 2026 | 051-64V94: Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County. Illinois DOT | Rock Island | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 052-64V95: Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County. Illinois DOT | Rock Island | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 053-64V96: Bridge washing of 3 structures over the Mississippi River in various counties. Illinois DOT | Carroll, Rock Island, Whiteside | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 054-64W01: Full cleaning and painting of structural steel of SN 043-0045 carrying IL 78 over Menominee Road and SN 043-0047 carrying US 20 over South Fork of Apple Creek. Illinois DOT | Jo Daviess | Other | |
| 5d Fri Nov 6, 2026 | 055-85784: Construction of a PCC shared-use path along 25th Avenue in the city of Moline. Work includes pavement patching, retaining wall, water service adjustments, ADA ramps and other required work. Illinois DOT | Rock Island | Water & sewer | |
| 5d Fri Nov 6, 2026 | 056-85799: Reconstruction of the eastbound lanes and shoulders of the Rock Island-Milan Parkway from US 67 to 78th Ave. in Rock Island County. Work includes PCC pavement, raised median replacement, intersection lighting, striping and other Illinois DOT | Rock Island | Safety & signals | |
| 5d Fri Nov 6, 2026 | 057-85800: HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work includes replacement of box and pipe culverts, drainage improvements, pavement markings and other required work. Illinois DOT | Winnebago | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 058-85802: Replacement of the bridge carrying 15th Ave. over the Rock River in the city of Rockford. Additional work consists of the reconstruction of the approaches, bridge lighting, traffic signals, sidewalk, water main replacement and la Illinois DOT | Winnebago | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 059-46936: Improvements at Matthiessen State Park Annex consist of resurfacing E. 494th Rd with a concrete surface; construction of a new HMA surface parking lot with lighting; access gates and signage; drainage improvements; and other asso Illinois DOT | Lasalle | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 060-66K64: Removal and replacement of bridge structure (SN 050-0254) which carries Water St over Indian Creek located about 0.4 miles north of US 34 in Earlville. Illinois DOT | Lasalle | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 061-66M30: Superstructure replacement (SN 032-0087 / 0086) on IL 47 Over Buchanan St and Armstrong St/CSX RR 0.6 Mi South of US 6 (west) in Morris. Illinois DOT | Grundy | Other | |
| 5d Fri Nov 6, 2026 | 062-66M78: Removal of a bridge and replacement with double 9'X9' culverts, SN 053-0103, which carries IL 116 over Short Point Creek approximately 5.4 miles east of IL 251. Illinois DOT | Livingston | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 063-66M80: Superstructure replacement of various structures on I-57 including SN 038-0003, SN 038-0004, SN 038-0005, SN 038-0006, SN 038-0009 and SN 038-0010. The project includes deck replacements of SN 038-0007 and SN 038-0008; structure Illinois DOT | Iroquois | Other | |
| 5d Fri Nov 6, 2026 | 064-66N24: Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located approximately 0.4 miles west of IL 71. Additional work includes milling/resurfacing at roadway approaches, additional shoulders, upgraded guardrails Illinois DOT | Lasalle | Paving | |
| 5d Fri Nov 6, 2026 | 067-66T44: 36.2 miles, on-call pavement patching and pavement marking at Type IV patches. Begins at the Marshall County line and ends at the Lee County line. Illinois DOT | Lasalle | Paving | |
| 5d Fri Nov 6, 2026 | 068-66T48: 11.5 miles of resurfacing from LaSalle 0.3 miles west of IL 178 to west of Fox River on interstate 80 north of Ottawa. Illinois DOT | Lasalle | Paving | |
| 5d Fri Nov 6, 2026 | 069-66T76: Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout LaSalle and Putnam counties. Illinois DOT | Lasalle, Putnam | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 070-66T80: This project is located on FAP 326 (IL-47) in the Morris Wetland bank east of IL-47 and south of the Illinois River in Morris and consists of beaver guard removal. Illinois DOT | Grundy | Other | |
| 5d Fri Nov 6, 2026 | 071-68K99: PCC Pavement Patching and curb at the EB and WB I-74 Spoon River Rest Areas. Illinois DOT | Knox | Paving | |
| 5d Fri Nov 6, 2026 | 072-89870: Construction of a single-span plate girder bridge carrying Furrow Road over Lost Creek. Work also includes HMA approach pavement, guardrail and other required work. Illinois DOT | Tazewell | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 073-89886: Construction of a single-span steel plate girder bridge carrying CH 38 over Shaw Creek in Fulton County. Additional work includes full depth HMA pavement, aggregate shoulders, guardrail and other required work. Illinois DOT | Fulton | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 076-70G92: 0.75 mile of intersection reconstruction at Leverett Rd north of Urbana and at Flatville Rd in Thomasboro. Illinois DOT | Champaign | Safety & signals | |
| 5d Fri Nov 6, 2026 | 077-70H78: Bridge painting at various structures in Vermilion County. Illinois DOT | Vermilion | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 078-70I06: Removal and replacement of rest area lighting at both the EB and WB Farmland Rest Areas in DeWitt County. Illinois DOT | Dewitt | Safety & signals | |
| 5d Fri Nov 6, 2026 | 079-91665: Rehabilitation of SN 092-0153 and replacement of SN 092-0155 on Voorhees St. in the city of Danville. SN 092-0153 rehabilitation consists of continuous concrete slab replacement and reconstruction of pier caps and abutment caps. Illinois DOT | Vermilion | Paving | |
| 5d Fri Nov 6, 2026 | 080-91666: Replacement of PCC deck beams on a three-span structure carrying 3400 N. Rd. over the Sangamon River in Champaign County. Additional work includes aggregate approaches, concrete wingwalls, riprap and other required work. Illinois DOT | Champaign | Flatwork & trails | |
| 5d Fri Nov 6, 2026 | 081-72250: Bridge superstructure replacement, bridge bearing replacement, bridge joint replacement, drainage improvements and slopewall removal and replacement on SN 001-0050 and SN 001-0051 carrying I-172 over the Burlington Northern Santa Illinois DOT | Adams | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 082-72342: Reconstruction of Sudduth Road, 0.6 miles north of the I-55 Sherman interchange. Project includes the removal and reconstruction of SN 084-0100 carrying Sudduth Road over I-55. Illinois DOT | Sangamon | Paving | |
| 5d Fri Nov 6, 2026 | 083-72E70: Bridge painting on SN 069-0035 and SN 069-0036 carrying I-72 over KCS Railroad, 0.5 miles east of IL 267. Illinois DOT | Morgan | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 084-72E77: Culvert wing wall repairs on SN 059-7015 carrying IL 4 over unnamed ditch, 5.4 miles south of IL 108. Illinois DOT | Macoupin | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 085-72E78: Culvert wing wall repairs on SN 009-7000 carrying IL 125 over Lost Creek Tributary, 0.5 miles east of Bluff Springs Road. Illinois DOT | Cass | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 086-72E79: Culvert wing wall repairs on SN 034-7043 carrying US 136 over unnamed ditch, 1 mile west of Carthage. Illinois DOT | Hancock | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 087-72E80: Culvert wing wall and channel repairs on SN 001-7089 carrying IL 104 over unnamed ditch, 1 mile east of Liberty. Illinois DOT | Adams | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 088-72E82: Lighting upgrades on Veterans Parkway in Springfield. Illinois DOT | Sangamon | Safety & signals | |
| 5d Fri Nov 6, 2026 | 089-72E87: Pipe culvert removal and replacement on IL 96, 0.2 mile south of TR 159 (1720 N) north of Hamilton. Illinois DOT | Hancock | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 090-72E89: Culvert wing wall repairs on SN 085-2006 carrying US 67 over East Fork of Crane Creek, 4.2 miles northwest of IL 100. Illinois DOT | Schuyler | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 091-72E90: Bridge painting of four structures over I-172 at various locations in Adams County. (SN SN 001-0048, 001-0058, 001-0060 and 001-0061) Illinois DOT | Adams | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 092-72E91: Bridge painting on four structures on I-72 and IL 29 in Sangamon County. (SN 084-0042, 084-0043, 084-0157 and 084-0158) Illinois DOT | Sangamon | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 093-72E92: Bridge painting on SN 054-0057 and 054-0058 carrying I-55 over the abandoned IT Railroad, 2.8 miles east of the I-55/I-155 interchange. Illinois DOT | Logan | Non-construction | |
| 5d Fri Nov 6, 2026 | 094-72E95: Bridge bearing replacements on SN 001-0047 carrying IL 104 over I-172 on the east edge of Quincy. Illinois DOT | Adams | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 095-72E99: Bridge deck patching and substructure repairs on SN 068-0047 carrying TR 48 over I-55, 2.3 miles north of IL 16. Illinois DOT | Montgomery | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 096-72C54: Resurfacing on IL 61 from 0.2 miles west of IL 94 to east of IL 110/336. Also includes scarification and microsilica overlay of SN 001-0077 and SN 001-0078. Illinois DOT | Adams | Paving | |
| 5d Fri Nov 6, 2026 | 097-72C61: Resurfacing on IL 100 from 0.3 miles south of US 67 to south of Naples Road, north of Bluffs. Also includes scarification and micro-surfacing of SN 069-0062 on IL 100 at Spring Run Creek, 0.4 miles north of the Scott County line. Illinois DOT | Morgan, Scott | Paving | |
| 5d Fri Nov 6, 2026 | 098-72C62: Patching, paved shoulders, resurfacing and grading and shaping ditches on US 54 from 0.2 miles south of 345th Street, southwest of Pittsfield, to north of Jim Town Hollow Road in Summer Hill. Illinois DOT | Pike | Paving | |
| 5d Fri Nov 6, 2026 | 099-72K00: 4 miles of patching, resurfacing, concrete curb and gutter installation, storm sewer, culvert extensions, earthwork, and drainage improvements on IL 104 from 0.8 miles southwest of CH 1 (Woodson/Franklin Road) to 0.7 miles west o Illinois DOT | Morgan | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 100-72N60: Patching on IL 104 from east of I-172 to just east of the Quincy Regional Airport. Illinois DOT | Adams | Other | |
| 5d Fri Nov 6, 2026 | 102-93861: Roadway reconstruction/rehabilitation of 5th St. from 700th Ave. to I-55 overpass west of the city of Lincoln. Work includes full-depth reclamation, HMA pavement, culverts and other required work. Illinois DOT | Logan | Paving | |
| 5d Fri Nov 6, 2026 | 103-93862: Construction of three-span steel wide flange beam bridge carrying CH 17 over LaHarpe Creek in Hancock County. Work also includes HMA approach roadways, aggregate shoulders, guardrail and other required work. Illinois DOT | Hancock | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 105-74435: Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a cloverleaf to a raindrop diamond configuration. Illinois DOT | Coles | Paving | |
| 5d Fri Nov 6, 2026 | 106-74856: Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-0019) Illinois DOT | Macon | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 107-74E48: Bridge painting at 15 locations in Cumberland and Clark Counties. Illinois DOT | Clark, Cumberland | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 108-74D08: Bridge joint replacement, bridge deck patching, bridge deck scarification, bridge deck overlay and slope wall repairs at four four structures located on I-72 / US 51 at Eldorado Street and Grand Avenue North at the Harristown Int Illinois DOT | Macon | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 109-95979: Construction of a 5-foot sidewalk along Oak St. from Vine St. to State St. and along State St. from Oak St. to John St. in the village of Teutopolis. Illinois DOT | Effingham | Flatwork & trails | |
| 5d Fri Nov 6, 2026 | 110-76F81: Removing and replacing the existing structure (SN 060-0405) which carries the American Legion Entrance over Delaplaine Creek in Edwardsville with a new cast-in-place concrete box culvert on new alignment. Illinois DOT | Madison | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 111-76L27: 11 miles of resurfacing on IL 140 from the Madison County line to IL 127 west junction. Illinois DOT | Bond | Paving | |
| 5d Fri Nov 6, 2026 | 112-76M45: Resurfacing and bridge repairs on I-255 from 0.5 miles south of IL 3 at Dupo to 0.2 miles north of IL 157; Southbound IL 3 to Northbound I-255 ramp; Southbound I-255 ramp, IL 157 to Northbound I-255 ramp and SN 082-0217, 0218, 02 Illinois DOT | St. Clair | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 113-76M46: Culvert replacement on US 50 at a tributary to Turkey Creek, 1 mile east of Odin. (SN 061-2008) Illinois DOT | Marion | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 114-76R14: Bridge repairs and bridge deck overlay: IL 4, IL 150 over Cox Creek (SN 079-0038), 0.1 miles east of Green Street in Steeleville; and IL 4, IL 150 over Mary's River (SN 079-0007), 0.25 miles west of Shawneetown Trail in Steelevil Illinois DOT | Randolph | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 115-76R23: 3.6 miles of resurfacing and ADA upgrades on St. Clair Avenue from 33rd Street Street in East St. Louis to IL 157. Illinois DOT | St. Clair | Paving | |
| 5d Fri Nov 6, 2026 | 116-76T92: 7.6 miles of resurfacing and ADA improvements on IL 4 from IL 154 in Sparta to IL 150. Includes culvert replacement (SN 079-2467) over Middle Tributary to Little Mary-s River, 3 miles south of Sparta. Illinois DOT | Randolph | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 117-76U91: Chemical treatment and video inspection of deep wells at various locations in East St. Louis and Venice. Illinois DOT | Madison, St. Clair | Other | |
| 5d Fri Nov 6, 2026 | 118-76U92: Repair and maintenance of pump station electrical equipment at various locations in District 8. Illinois DOT | Various | Water & sewer | |
| 5d Fri Nov 6, 2026 | 119-76V28: 1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market Street in Waterloo. Illinois DOT | Monroe | Paving | |
| 5d Fri Nov 6, 2026 | 120-76V29: 55.2 miles of pavement patching on IL 3 from Monroe to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line. Illinois DOT | Randolph | Paving | |
| 5d Fri Nov 6, 2026 | 121-76V30: Resurfacing and adding shoulders on IL 4 from 0.3 miles south of IL 143 to north of Blue Spruce Lane near St. Jacob. Illinois DOT | Madison | Paving | |
| 5d Fri Nov 6, 2026 | 122-76V33: 6.7 miles of resurfacing on IL 127 from US 50 South Junction in Carlyle to the Washington County line. Illinois DOT | Clinton | Paving | |
| 5d Fri Nov 6, 2026 | 123-76V77: Multiple culvert replacements on Kinoka Road / Boat Dock Road from US 51 to 0.2 miles east of Garret Road near Patoka. Illinois DOT | Marion | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 124-76V80: 4.1 miles of pavement patching on IL 159 from north of Lincoln Trail in Fairview Heights to IL 161 in Swansea. Illinois DOT | St. Clair | Paving | |
| 5d Fri Nov 6, 2026 | 125-97877: Construction of roundabout at the intersection of IL 162 and Troy Rd. in the city of Troy. Work includes PCC pavement, storm sewer, curb and gutter, roadway lighting and pavement markings. Illinois DOT | Madison | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 126-97893: HMA resurfacing of East Market St. from Hickory St. to Dewey St. in the city of Troy. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Madison | Paving | |
| 5d Fri Nov 6, 2026 | 127-97898: Construction of bi-directional turn lane with HMA resurfacing and widening on IL 159 (Main St.) from Barker St. to Stonefield Dr. in the village of Smithton. Work includes storm sewers, curb and gutter, ADA ramps, PCC shared-use Illinois DOT | St. Clair | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 128-78A26: Bridge replacement for SN 091-0003 and 091-0004 at the Dongola Interchange on I-57 over Cypress Road at Big Creek, 0.2 miles east of Dongola. Illinois DOT | Union | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 129-78A43: 600 feet of slope stabilization on the south side of IL 146, approximately 0.6 miles southwest of Hardin County High School. Illinois DOT | Hardin | Buildings | |
| 5d Fri Nov 6, 2026 | 130-78A44: Slope stabilization on US 45, 1.2 miles south of Mills Shoals. Includes earth excavation, furnished excavation, tree removal and seeding. Illinois DOT | White | Other | |
| 5d Fri Nov 6, 2026 | 131-78B35: Bridge deck overlay and repairs to SN 097-0038 and 097-0039 on I-64 over the Little Wabash River, 4.8 miles west of IL 1. Illinois DOT | White | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 132-78B41: Profile and slope adjustment, curb and gutter, ADA upgrades, drainage and intersection improvements on IL 37 (Logan Street) from south of North Douglas Street to south of Cleveland Street in West Frankfort. Also includes traffic Illinois DOT | Franklin | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 133-78B44: Bridge deck overlay on SN 091-0069 carrying IL 3 / IL 146 over Running Lake Ditch, 2 miles south of Ware. Illinois DOT | Union | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 134-78B77: Slope repair on IL 37 approximately 0.8 miles north of Mound City. Illinois DOT | Pulaski | Buildings | |
| 5d Fri Nov 6, 2026 | 135-78C23: 6.9 miles of patching and resurfacing on IL 149 from IL 3 to 22nd Street in Murphysboro. Illinois DOT | Jackson | Paving | |
| 5d Fri Nov 6, 2026 | 136-78C27: Bridge deck concrete sealing on various bridges in Jefferson, Perry and Jackson Counties. Illinois DOT | Jackson, Jefferson, Perry | Bridges & drainage | |
| 5d Fri Nov 6, 2026 | 137-78C53: 4.3 miles of crack sealing center lane lines on I-57 from near the Johston City interchange to north of The Hill interchange near Marion. Illinois DOT | Williamson | Paving | |
| 5d Fri Nov 6, 2026 | 138-99748: Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion. Additional work includes cross walks, ADA ramps and other required work. Illinois DOT | Williamson | Flatwork & trails | |
| 5d Fri Nov 6, 2026 | 139-99755: HMA resurfacing of Wells Bypass Rd. from Veterans Memorial Dr. to IL 148 in Jefferson County. Additional work includes HMA shoulders, turn lanes, pavement markings and other required work. Illinois DOT | Jefferson | Paving | |
| 5d Fri Nov 6, 2026 | 141-99781: Construction of multi-use PCC path along IL 13 from Airport Rd. to County Club/ Health Department Rd. in Jackson County. Illinois DOT | Jackson | Other | |
| 5d Fri Nov 6, 2026 | 142-46676: Repairing or replacing damaged sign components, furnishing and installing new signs and supports, repairing or replacing damaged sign components, furnishing new overhead sign structure components, end supports and structures, and Illinois DOT | Various | Other | |
| 5d Fri Nov 6, 2026 | 01A-AU072: Rehabilitate Auto Parking Lots and Entrance Road Illinois DOT | Kane | Other | |
| 5d Fri Nov 6, 2026 | Y1DZ--Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of Existing [Solicitation; NAICS 236220; Service-Disabled Veteran-Owned Small Business (SDVOSB Veterans Affairs, Department Of / Office Of Construction & Facilities Mgmt (36C10F) | Marion | Buildings | |
| 8d Mon Nov 9, 2026 | 657A5-26-111, Triennial Electrical Testing [Solicitation; NAICS 238210; Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)] Veterans Affairs, Department Of / 255-Network Contract Office 15 (36C255) | Marion | Buildings | |
| 8d Mon Nov 9, 2026 | Update and Replace Remaining ATS's [Sources Sought; NAICS 238210; Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)] Veterans Affairs, Department Of / 252-Network Contract Office 12 (36C252) | North Chicago | Other | |
| 10d Wed Nov 11, 2026 | RFP 7-B164-P-00002-00 (RR GC BPA FY27) [Solicitation; NAICS 236220] Energy, Department Of / Argonne Natl Lab - Doe Contractor | Lemont | Pro services | |
| 15d Mon Nov 16, 2026 | Hydrant Repair/Replacement, Midewin National Tallgrass Prairie [Combined Synopsis/Solicitation; NAICS 237110; Small Business Set Aside - Total] Forest Service / Usda-Fs, Csa East 7 | Wilmington | Buildings | |
| 15d Mon Nov 16, 2026 | Eddyville Quarters Window Replacement [Combined Synopsis/Solicitation; NAICS 561790; Small Business Set Aside - Total] Forest Service / Usda-Fs, Csa East 6 | Eddyville | Other | |
| 16d Tue Nov 17, 2026 | Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade [Solicitation; NAICS 236220; Small Business Set Aside - Total] Energy, Department Of / Fermilab - Doe Contractor | | Buildings | |
| 16d Tue Nov 17, 2026 | Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB [Solicitation; NAICS 236210; No Set aside used] Energy, Department Of / Fermilab - Doe Contractor | Batavia | Water & sewer | |
| 17d Wed Nov 18, 2026 | Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON) [Presolicitation; NAICS 236220; Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)] Veterans Affairs, Department Of / 252-Network Contract Office 12 (36C252) | Danville | Other | |
| 17d Wed Nov 18, 2026 | Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON) [Solicitation; NAICS 236220; Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)] Veterans Affairs, Department Of / 252-Network Contract Office 12 (36C252) | Danville | Other | |
| 18d Thu Nov 19, 2026 | 88th RD US ARMY RESERVE CENTER MONCLOVA, OH CONSTRUCT STORAGE BUILDING AND REPAIR MEP LOTS [Solicitation; NAICS 236220] Dept Of The Army / W07V Endist Rock Island | | Buildings | |
| 18d Thu Nov 19, 2026 | Z1DA--Modernize Damen (Bldg. 1) Elevators Construction 537-24-101 [Solicitation; NAICS 238290; Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)] Veterans Affairs, Department Of / 252-Network Contract Office 12 (36C252) | Chicago | Other | |
| 18d Thu Nov 19, 2026 | PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION [Solicitation; NAICS 23822; No Set aside used] Energy, Department Of / Fermilab - Doe Contractor | Batavia | Buildings | |
| 19d Fri Nov 20, 2026 | 88th RD US ARMY RESERVE CENTER MONCLOVA, OH CONSTRUCT STORAGE BUILDING AND REPAIR MEP LOTS [Solicitation; NAICS 236220] Dept Of The Army / W07V Endist Rock Island | | Buildings | |
| 26d Fri Nov 27, 2026 | Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois [Sources Sought; NAICS 237990] Dept Of The Army / W072 Endist Chicago | | Other | |
| 29d Mon Nov 30, 2026 | Replace Water Tanks FCI Marion Marions, Illinois [Presolicitation; NAICS 238220; Small Business Set Aside - Total] Federal Prison System / Bureau Of Prisons / Fao | | Water & sewer | |
| 29d Mon Nov 30, 2026 | Replace Water Tanks FCI Marion Marions, Illinois [Solicitation; NAICS 238220; Small Business Set Aside - Total] Federal Prison System / Bureau Of Prisons / Fao | | Water & sewer | |
| 29d Mon Nov 30, 2026 | W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation [Presolicitation; NAICS 237310; 8(a) Set-Aside (FAR 19.8)] Dept Of The Army / W07V Endist Rock Island | | Buildings | |
| 31d Wed Dec 2, 2026 | Repair Building Systems (Peoria, IL) [Combined Synopsis/Solicitation; NAICS 236220; Small Business Set Aside - Total] Agricultural Research Service / Usda Ars Afm Apd | Peoria | Buildings | |
| 32d Thu Dec 3, 2026 | FCI Marion - Emergency Repair Tornado Damage [Combined Synopsis/Solicitation; NAICS 237130; Small Business Set Aside - Total] Federal Prison System / Bureau Of Prisons / Fao | Marion | Buildings | |
| 46d Thu Dec 17, 2026 | Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB [Solicitation; NAICS 236210; No Set aside used] Energy, Department Of / Fermilab - Doe Contractor | Batavia | Water & sewer | |