| today Fri Nov 6, 2026 | 003-62V13: (2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Glen Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 004-62V31: (8.2-Mile) Cracks and joints routing and filling, pavement marking and collateral or incident work necessary to complete the project. The project is in the Villages of Elburn, Kane County. Illinois DOT | Kane | Paving | |
| today Fri Nov 6, 2026 | 005-62V42: (1.41-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 006-62V47: (4.43-Mile) Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. This project is in t Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 007-62V65: (1.65-Mile) Crack and Joint sealing project consists of crack routing and filling, as well as placement of pavement markings. The project is in the Municipality of Warrenville within DuPage County. Illinois DOT | Dupage | Paving | |
| today Fri Nov 6, 2026 | 011-80C62: (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, pedestrian c Illinois DOT | Lake | Paving | |
| today Fri Nov 6, 2026 | 017-80C93: (1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) consists of removal and replacement of existing Hot Mix Asphalt (HMA), pavement patching, Portland Cement Concrete (PCC) overlay, curb and gutter remova Illinois DOT | Lake | Paving | |
| today Fri Nov 6, 2026 | 018-80D34: (1.46-Mile) SMART overlay project in which the work to be performed under this contract consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pavement patching, plac Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 019-80D75: (3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement Batch Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 022-80F50: This is a pavement patching improvement consists of Class B Patching, Crack and Joint sealing, concrete curb and gutter repair, placement of pavement markings and raised reflective pavement markers. This improvement is on various Illinois DOT | Lake | Paving | |
| today Fri Nov 6, 2026 | 024-61K73: HMA resurfacing, patching, pavement markings, sidewalks and ADA improvements at various locations in the city of Elgin. Illinois DOT | Kane | Paving | |
| today Fri Nov 6, 2026 | 029-61M65: Resurface Glenview Rd. from Washington St. to Metra Railroad and resurfacing Lehigh Ave./Harlem Ave. from Lake Ave. to Dewes St. in the village of Glenview. Additional work includes sidewalk replacement, curb and gutter replaceme Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 030-61M69: HMA resurfacing and traffic signal improvement of 103rd St. from Southwest Highway to Ridgeland Ave. in the village of Chicago Ridge. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Cook | Safety & signals | |
| today Fri Nov 6, 2026 | 033-61M74: HMA resurfacing of Brainard Ave. from Harding Ave. to 31st St. in the village of LaGrange Park. Additional work includes drainage improvements, sidewalks, ADA ramps, pavement patching and other required work. Illinois DOT | Cook | Bridges & drainage | |
| today Fri Nov 6, 2026 | 035-61M81: HMA resurfacing of 5th Ave. from Roosevelt Rd. to Bataan Dr. in the village of Maywood. Additional work includes curb and gutter, sidewalk, ADA ramps and other required work. Illinois DOT | Cook | Paving | |
| today Fri Nov 6, 2026 | 037-61M86: Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell Rd. to the eastern ter Illinois DOT | Cook | Safety & signals | |
| today Fri Nov 6, 2026 | 038-61M88: HMA resurfacing of Crystal Lake Rd. from Algonquin Rd. to Miller Rd. in the village of Lake in the Hills. Additional work includes pavement patching, drainage improvements, sidewalks, ADA improvements and other required work. Illinois DOT | Mchenry | Bridges & drainage | |
| today Fri Nov 6, 2026 | 043-64L41: 5.79 miles of designed overlay on US 6 from 0.1 miles west of Dilenbeck Dr to US 6 (E); and on ILL 82 from Smith St to 0.4 miles south of I-80 (including ramps). Illinois DOT | Henry | Paving | |
| today Fri Nov 6, 2026 | 046-64S80: 11.97 miles of Cold in Place Recycling, Cold Milling, and HMA resurfacing on IL 26 from US 30 to Bureau County Line. Illinois DOT | Lee | Paving | |
| today Fri Nov 6, 2026 | 047-64U60: 2.89 miles of pavement patching, cold milling, and HMA resurfacing on Springfield Ave from 0.1 mile west of Central Ave to Auburn St northwest of Rockford. Illinois DOT | Winnebago | Paving | |
| today Fri Nov 6, 2026 | 048-64V27: 6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern limit to Barber Creek Rd and I-80 rest area. Illinois DOT | Rock Island | Paving | |
| today Fri Nov 6, 2026 | 056-85799: Reconstruction of the eastbound lanes and shoulders of the Rock Island-Milan Parkway from US 67 to 78th Ave. in Rock Island County. Work includes PCC pavement, raised median replacement, intersection lighting, striping and other Illinois DOT | Rock Island | Safety & signals | |
| today Fri Nov 6, 2026 | 057-85800: HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work includes replacement of box and pipe culverts, drainage improvements, pavement markings and other required work. Illinois DOT | Winnebago | Bridges & drainage | |
| today Fri Nov 6, 2026 | 059-46936: Improvements at Matthiessen State Park Annex consist of resurfacing E. 494th Rd with a concrete surface; construction of a new HMA surface parking lot with lighting; access gates and signage; drainage improvements; and other asso Illinois DOT | Lasalle | Bridges & drainage | |
| today Fri Nov 6, 2026 | 064-66N24: Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located approximately 0.4 miles west of IL 71. Additional work includes milling/resurfacing at roadway approaches, additional shoulders, upgraded guardrails Illinois DOT | Lasalle | Paving | |
| today Fri Nov 6, 2026 | 067-66T44: 36.2 miles, on-call pavement patching and pavement marking at Type IV patches. Begins at the Marshall County line and ends at the Lee County line. Illinois DOT | Lasalle | Paving | |
| today Fri Nov 6, 2026 | 068-66T48: 11.5 miles of resurfacing from LaSalle 0.3 miles west of IL 178 to west of Fox River on interstate 80 north of Ottawa. Illinois DOT | Lasalle | Paving | |
| today Fri Nov 6, 2026 | 071-68K99: PCC Pavement Patching and curb at the EB and WB I-74 Spoon River Rest Areas. Illinois DOT | Knox | Paving | |
| today Fri Nov 6, 2026 | 096-72C54: Resurfacing on IL 61 from 0.2 miles west of IL 94 to east of IL 110/336. Also includes scarification and microsilica overlay of SN 001-0077 and SN 001-0078. Illinois DOT | Adams | Paving | |
| today Fri Nov 6, 2026 | 097-72C61: Resurfacing on IL 100 from 0.3 miles south of US 67 to south of Naples Road, north of Bluffs. Also includes scarification and micro-surfacing of SN 069-0062 on IL 100 at Spring Run Creek, 0.4 miles north of the Scott County line. Illinois DOT | Morgan, Scott | Paving | |
| today Fri Nov 6, 2026 | 098-72C62: Patching, paved shoulders, resurfacing and grading and shaping ditches on US 54 from 0.2 miles south of 345th Street, southwest of Pittsfield, to north of Jim Town Hollow Road in Summer Hill. Illinois DOT | Pike | Paving | |
| today Fri Nov 6, 2026 | 111-76L27: 11 miles of resurfacing on IL 140 from the Madison County line to IL 127 west junction. Illinois DOT | Bond | Paving | |
| today Fri Nov 6, 2026 | 115-76R23: 3.6 miles of resurfacing and ADA upgrades on St. Clair Avenue from 33rd Street Street in East St. Louis to IL 157. Illinois DOT | St. Clair | Paving | |
| today Fri Nov 6, 2026 | 119-76V28: 1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market Street in Waterloo. Illinois DOT | Monroe | Paving | |
| today Fri Nov 6, 2026 | 120-76V29: 55.2 miles of pavement patching on IL 3 from Monroe to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line. Illinois DOT | Randolph | Paving | |
| today Fri Nov 6, 2026 | 121-76V30: Resurfacing and adding shoulders on IL 4 from 0.3 miles south of IL 143 to north of Blue Spruce Lane near St. Jacob. Illinois DOT | Madison | Paving | |
| today Fri Nov 6, 2026 | 122-76V33: 6.7 miles of resurfacing on IL 127 from US 50 South Junction in Carlyle to the Washington County line. Illinois DOT | Clinton | Paving | |
| today Fri Nov 6, 2026 | 124-76V80: 4.1 miles of pavement patching on IL 159 from north of Lincoln Trail in Fairview Heights to IL 161 in Swansea. Illinois DOT | St. Clair | Paving | |
| today Fri Nov 6, 2026 | 126-97893: HMA resurfacing of East Market St. from Hickory St. to Dewey St. in the city of Troy. Additional work includes curb and gutter, sidewalks, pavement markings and other required work. Illinois DOT | Madison | Paving | |
| today Fri Nov 6, 2026 | 127-97898: Construction of bi-directional turn lane with HMA resurfacing and widening on IL 159 (Main St.) from Barker St. to Stonefield Dr. in the village of Smithton. Work includes storm sewers, curb and gutter, ADA ramps, PCC shared-use Illinois DOT | St. Clair | Bridges & drainage | |
| today Fri Nov 6, 2026 | 135-78C23: 6.9 miles of patching and resurfacing on IL 149 from IL 3 to 22nd Street in Murphysboro. Illinois DOT | Jackson | Paving | |
| today Fri Nov 6, 2026 | 139-99755: HMA resurfacing of Wells Bypass Rd. from Veterans Memorial Dr. to IL 148 in Jefferson County. Additional work includes HMA shoulders, turn lanes, pavement markings and other required work. Illinois DOT | Jefferson | Paving | |
| today Fri Nov 6, 2026 | 1343562: Grade Separated Service Roadway A3/A4 at Chicago ORD Int'l Airport [Construction] City of Chicago (DPS) | Cook | Paving | |
| 5d Wed Nov 11, 2026 | RENEWAL NOTICE I-12-4746 Elgin OHare W. Access (I-490) RDWY Construction At Touhy Avenue MP 5.75 (27-557THA-ENGCO-B-54608) THA - Toll Highway Authority | | Paving | |
| 7d Fri Nov 13, 2026 | I-26-2064 Tri State Twy Asphalt Overlay Pvmt Mark Imprv Plz 35(Cermak) to N. Ave MP 29.9 to MP 33.5 (27-557THA-ENGCO-B-54260) THA - Toll Highway Authority | | Paving | |
| 11d Tue Nov 17, 2026 | DHS IFB ISD Mill And Repave Power Plant Parking Lot (27-444DHS-PROCU-B-54670) DHS - Human Services | | Paving | |
| 13d Thu Nov 19, 2026 | DMH IFB FY27 EMHC Resurfacing Project-REBID (27-444DHS-PROCU-B-54744) DHS - Human Services | | Paving | |
| 21d Fri Nov 27, 2026 | RR-25-6002 - CO #1 - ATP #4 - Systemwide Pavement Repairs (27-557THA-ENGCO-B-54677) THA - Toll Highway Authority | | Paving | |
| 28d Fri Dec 4, 2026 | I-25-4766 - CO #13 - ATP #18 - I-490 Roadway Construction (27-557THA-ENGCO-B-54767) THA - Toll Highway Authority | | Paving | |
| 34d Thu Dec 10, 2026 | RR-26-2069 Systemwide Pavement Repairs (26-557THA-PROCU-B-54718) THA - Toll Highway Authority | | Paving | |