Get alerts
Home › Arkansas › Pulaski County
Paving 3d AR · ardot lettings

A60066 Hwy. 367 – Hwy. 365 (S) Pulaski County [Route 338]

ARDOT (statewide letting) · Pulaski County
Official notice ↗
Due
Wed Nov 4, 2026
Bid bond
not stated
Prequal / license
not stated
Pre-bid
not stated

Estimator brief

Auto-extracted from the public notice · verify
Quoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
Scope
To mill and overlay approximately 5.078 miles of highway 338 in pulaski county. This project consists of earthwork, aggregate base course, himod asphalt surface course, ACHM surface course, cold milling asphalt pavement, ACHM patching of existing roadway, maintenance of traffic, radar detection system, pavement marking, and misc. Items.
Key quantities
Item (as written in the notice)QtyUnit
Soil stabilization5,177TON
Aggr.base course(class 7)718TON
Tack coat9,552GAL
Cold milling asphalt pvmt94,665SQYD
Asph.conc.patch-maint127TON
Achm patch.exist.rdwy250TON
Signs760SQFT
Traffic drums211EACH
Const.pavement markings107,247LF
Traf.sig.cntrl.(mod.)1EACH
Length
5.078 miles
Bid bond / security
not stated
Performance & payment bonds
not stated
Prequalification / licensing
not stated
Insurance
not stated
Pre-bid meeting
not stated
Bids due
Wed Nov 4, 2026 (time not stated)
Plans & documents
not stated
Federal aid
STPLC-0060(83)

Brief generated 2026-11-01 · completeness 1/6

Get bids like this by email

Free during early access: one email a day with new Arkansas bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.

Get free daily alerts

Related open bids

All Arkansas bids →

Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.