Paving 3d AR · ardot lettings
A60066 Hwy. 367 – Hwy. 365 (S) Pulaski County [Route 338]
ARDOT (statewide letting) · Pulaski County
Due
Wed Nov 4, 2026
Bid bond
not stated
Prequal / license
not stated
Pre-bid
not stated
Estimator brief
Auto-extracted from the public notice · verifyQuoted or extracted from the official notice text by software, not written or reviewed by an engineer. “Not stated” means the notice text we could read doesn't say. Always check the official notice, plans and every addendum before you bid.
- Scope
- To mill and overlay approximately 5.078 miles of highway 338 in pulaski county. This project consists of earthwork, aggregate base course, himod asphalt surface course, ACHM surface course, cold milling asphalt pavement, ACHM patching of existing roadway, maintenance of traffic, radar detection system, pavement marking, and misc. Items.
- Key quantities
Item (as written in the notice) Qty Unit Soil stabilization 5,177 TON Aggr.base course(class 7) 718 TON Tack coat 9,552 GAL Cold milling asphalt pvmt 94,665 SQYD Asph.conc.patch-maint 127 TON Achm patch.exist.rdwy 250 TON Signs 760 SQFT Traffic drums 211 EACH Const.pavement markings 107,247 LF Traf.sig.cntrl.(mod.) 1 EACH - Length
- 5.078 miles
- Bid bond / security
- not stated
- Performance & payment bonds
- not stated
- Prequalification / licensing
- not stated
- Insurance
- not stated
- Pre-bid meeting
- not stated
- Bids due
- Wed Nov 4, 2026 (time not stated)
- Plans & documents
- not stated
- Federal aid
- STPLC-0060(83)
Brief generated 2026-11-01 · completeness 1/6
Get bids like this by email
Free during early access: one email a day with new Arkansas bids that match your counties, work types and keywords, with the brief where we have one. No card, nothing is charged.
Get free daily alertsRelated open bids
- 3dA10059 Hwy. 49 – Hwy. 44 (S) Phillips County [Route 85]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA20044 Hwy. 165 – Hwy. 152 (S) Arkansas County [Route 130]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA30049 Hwy. 355 – Hwy. 278 (S) Hempstead & Howard Counties [Route 73]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3d040904 Clear Creek Rd. – I-40 (Phase 1) (F) Crawford County [Route 549]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA40062 Hwy. 8 – South (S) Polk County [Route 375]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3d050439 Hwy. 25 Str. & Apprs. (Independence Co.) (S) Independence County [Route 25]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA50033 Hwy. 67B – Hwy. 13 (S) White County [Route 367]ARDOT (statewide letting) · due Wed Nov 4, 2026
- 3dA50052 Stone Co. Line – Hwy. 25 (S) Independence County [Route 14]ARDOT (statewide letting) · due Wed Nov 4, 2026
Bid info comes from public agency notices. Always confirm with the issuing agency. Facts above are machine-extracted and may be incomplete. Not engineering, legal or bidding advice.